{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/21356"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/21356","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Government management of contractor submission of value engineering change proposals","abstract":"The purpose of this thesis is to determine how the Department of Defense value engineering policies and processing procedures affect a contractor's motivation to submit value engineering change proposals. A comparative analysis of the DOD Value Engineering Program with private industry's value analysis program and also an examination of how the Hughes Aircraft Company has used the DOD Value Engineering Program, resulted in three conclusions. The first conclusion is that the incentives offered by the DOD Value Engineering Program have been found by private industry to be ineffective in attracting supplier participation in value analysis. The second conclusion is that delays in incorporating the VECP in the end-item significantly reduces a contractor' s motivation to submit future VECPs. The third conclusion is that the contractor's perception of the government buying activ­ity's willingness to fairly evaluate VECPs is the most significant influence on a contractor's motivation to submit VECPs.","abstract_html":"The purpose of this thesis is to determine how the Department of Defense value engineering policies and processing procedures affect a contractor&#x27;s motivation to submit value engineering change proposals. A comparative analysis of the DOD Value Engineering Program with private industry&#x27;s value analysis program and also an examination of how the Hughes Aircraft Company has used the DOD Value Engineering Program, resulted in three conclusions. The first conclusion is that the incentives offered by the DOD Value Engineering Program have been found by private industry to be ineffective in attracting supplier participation in value analysis. The second conclusion is that delays in incorporating the VECP in the end-item significantly reduces a contractor&#x27; s motivation to submit future VECPs. The third conclusion is that the contractor&#x27;s perception of the government buying activ­ity&#x27;s willingness to fairly evaluate VECPs is the most significant influence on a contractor&#x27;s motivation to submit VECPs.","abstract_has_math":false,"creators":["Given, Gary George"],"institution":"Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Carrick, Paul M."],"committee_chairs":[],"committee_members":["Smith, R.W."],"year":1985,"date_issued":"1985-12","date_published":"1985-12","updated_at":"2026-11-19T21:59:46Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/21356","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/21356","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F21356","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F21356","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Carrick, Paul M."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Smith, R.W."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Given, Gary George"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1985"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:01:33Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:01:33Z"]},{"key":"dc:date.issued","label":"Date","values":["1985-12"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Value engineering","VECP"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/21356"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this thesis is to determine how the Department of Defense value engineering policies and processing procedures affect a contractor's motivation to submit value engineering change proposals. A comparative analysis of the DOD Value Engineering Program with private industry's value analysis program and also an examination of how the Hughes Aircraft Company has used the DOD Value Engineering Program, resulted in three conclusions. The first conclusion is that the incentives offered by the DOD Value Engineering Program have been found by private industry to be ineffective in attracting supplier participation in value analysis. The second conclusion is that delays in incorporating the VECP in the end-item significantly reduces a contractor' s motivation to submit future VECPs. The third conclusion is that the contractor's perception of the government buying activ­ity's willingness to fairly evaluate VECPs is the most significant influence on a contractor's motivation to submit VECPs."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/governmentmanage1094521356"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["64 p."]},{"key":"dc:title","label":"Title","values":["Government management of contractor submission of value engineering change proposals"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Carrick, Paul M."],"dc:contributor.committeemember":["Smith, R.W."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Given, Gary George"],"dc:date":["December 1985"],"dc:date.accessioned":["2012-11-27T00:01:33Z"],"dc:date.available":["2012-11-27T00:01:33Z"],"dc:date.issued":["1985-12"],"dc:description.abstract":["The purpose of this thesis is to determine how the Department of Defense value engineering policies and processing procedures affect a contractor's motivation to submit value engineering change proposals. A comparative analysis of the DOD Value Engineering Program with private industry's value analysis program and also an examination of how the Hughes Aircraft Company has used the DOD Value Engineering Program, resulted in three conclusions. The first conclusion is that the incentives offered by the DOD Value Engineering Program have been found by private industry to be ineffective in attracting supplier participation in value analysis. The second conclusion is that delays in incorporating the VECP in the end-item significantly reduces a contractor' s motivation to submit future VECPs. The third conclusion is that the contractor's perception of the government buying activ­ity's willingness to fairly evaluate VECPs is the most significant influence on a contractor's motivation to submit VECPs."],"dc:description.uri":["http://archive.org/details/governmentmanage1094521356"],"dc:format.extent":["64 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/21356"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Value engineering","VECP"],"dc:subject.lcsh":["Management"],"dc:title":["Government management of contractor submission of value engineering change proposals"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T21:59:46Z"}