{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/21644"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/21644","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of the cost-volume relationships within the aircraft program of the Naval Air Rework Facility, Alameda, California","abstract":"The purpose of this research project is to examine the cost behavior of the Naval Air Rework Facility, Alameda, California, aircraft program in relation to variations in aircraft rework workloads, and to develop cost-volume relationships useable in support of pricing and workload decisions. Analysis of four years of quarterly direct and indirect cost data provided the base from which total cost-volume models were derived for the four aircraft program segments (A-6, P-3, S-3, and A-3). The results of this study indicate that significant cost-volume relationships exist not only with the direct costs but also with many associated indirect aircraft program costs. The study further suggests that other factors, such as rate and direction of volume changes and levels of personnel strengths, may have predictable affects on aircraft reworks costs.","abstract_html":"The purpose of this research project is to examine the cost behavior of the Naval Air Rework Facility, Alameda, California, aircraft program in relation to variations in aircraft rework workloads, and to develop cost-volume relationships useable in support of pricing and workload decisions. Analysis of four years of quarterly direct and indirect cost data provided the base from which total cost-volume models were derived for the four aircraft program segments (A-6, P-3, S-3, and A-3). The results of this study indicate that significant cost-volume relationships exist not only with the direct costs but also with many associated indirect aircraft program costs. The study further suggests that other factors, such as rate and direction of volume changes and levels of personnel strengths, may have predictable affects on aircraft reworks costs.","abstract_has_math":false,"creators":["Ferriman, Robert L."],"institution":"Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Liao, Shu S."],"committee_chairs":[],"committee_members":["Greer, Will R., Jr."],"year":1986,"date_issued":"1986-06","date_published":"1986-06","updated_at":"2026-11-20T22:04:51Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/21644","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/21644","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F21644","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F21644","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Liao, Shu S."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Greer, Will R., Jr."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Ferriman, Robert L."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1986"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:15:04Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:15:04Z"]},{"key":"dc:date.issued","label":"Date","values":["1986-06"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["cost-volume analysis","CVP analysis","aircraft costs","break-even analysis","NARF","Naval Air Rework Facility"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/21644"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this research project is to examine the cost behavior of the Naval Air Rework Facility, Alameda, California, aircraft program in relation to variations in aircraft rework workloads, and to develop cost-volume relationships useable in support of pricing and workload decisions. Analysis of four years of quarterly direct and indirect cost data provided the base from which total cost-volume models were derived for the four aircraft program segments (A-6, P-3, S-3, and A-3). The results of this study indicate that significant cost-volume relationships exist not only with the direct costs but also with many associated indirect aircraft program costs. The study further suggests that other factors, such as rate and direction of volume changes and levels of personnel strengths, may have predictable affects on aircraft reworks costs."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofcostv1094521644"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["127 p."]},{"key":"dc:title","label":"Title","values":["An analysis of the cost-volume relationships within the aircraft program of the Naval Air Rework Facility, Alameda, California"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Liao, Shu S."],"dc:contributor.committeemember":["Greer, Will R., Jr."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Ferriman, Robert L."],"dc:date":["June 1986"],"dc:date.accessioned":["2012-11-27T00:15:04Z"],"dc:date.available":["2012-11-27T00:15:04Z"],"dc:date.issued":["1986-06"],"dc:description.abstract":["The purpose of this research project is to examine the cost behavior of the Naval Air Rework Facility, Alameda, California, aircraft program in relation to variations in aircraft rework workloads, and to develop cost-volume relationships useable in support of pricing and workload decisions. Analysis of four years of quarterly direct and indirect cost data provided the base from which total cost-volume models were derived for the four aircraft program segments (A-6, P-3, S-3, and A-3). The results of this study indicate that significant cost-volume relationships exist not only with the direct costs but also with many associated indirect aircraft program costs. The study further suggests that other factors, such as rate and direction of volume changes and levels of personnel strengths, may have predictable affects on aircraft reworks costs."],"dc:description.uri":["http://archive.org/details/annalysisofcostv1094521644"],"dc:format.extent":["127 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/21644"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["cost-volume analysis","CVP analysis","aircraft costs","break-even analysis","NARF","Naval Air Rework Facility"],"dc:subject.lcsh":["Management"],"dc:title":["An analysis of the cost-volume relationships within the aircraft program of the Naval Air Rework Facility, Alameda, California"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:04:51Z"}