{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/21649"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/21649","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of government furnished material (GFM)--in new construction ships.","abstract":"This thesis discusses the supply support process for new construction ships, the feasibility, cost and impact of maximizing the use of the Navy supply system for repair parts and equipage, and provides regression models for use in program budget formulation and execution. The discussion includes the criteria for determining contractor versus government furnished equipment and material. The report also presents the results of a test case involving the transfer of parts procurement responsibility from the contractor to the Government.","abstract_html":"This thesis discusses the supply support process for new construction ships, the feasibility, cost and impact of maximizing the use of the Navy supply system for repair parts and equipage, and provides regression models for use in program budget formulation and execution. The discussion includes the criteria for determining contractor versus government furnished equipment and material. The report also presents the results of a test case involving the transfer of parts procurement responsibility from the contractor to the Government.","abstract_has_math":false,"creators":["Masters, Paul John"],"institution":"Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Boger, Dan C."],"committee_chairs":[],"committee_members":["Sullivan, Timothy J."],"year":1986,"date_issued":"1986-12","date_published":"1986-12","updated_at":"2026-11-20T22:13:10Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/21649","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/21649","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F21649","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F21649","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Boger, Dan C."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Sullivan, Timothy J."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:creator","label":"Author","values":["Masters, Paul John"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1986"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:15:07Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:15:07Z"]},{"key":"dc:date.issued","label":"Date","values":["1986-12"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["supply support","outfitting","provisioning","outfitting models","government furnished material"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/21649"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis discusses the supply support process for new construction ships, the feasibility, cost and impact of maximizing the use of the Navy supply system for repair parts and equipage, and provides regression models for use in program budget formulation and execution. The discussion includes the criteria for determining contractor versus government furnished equipment and material. The report also presents the results of a test case involving the transfer of parts procurement responsibility from the contractor to the Government."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofgover1094521649"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["93 p."]},{"key":"dc:title","label":"Title","values":["An analysis of government furnished material (GFM)--in new construction ships."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Boger, Dan C."],"dc:contributor.committeemember":["Sullivan, Timothy J."],"dc:contributor.department":["Administrative Sciences"],"dc:creator":["Masters, Paul John"],"dc:date":["December 1986"],"dc:date.accessioned":["2012-11-27T00:15:07Z"],"dc:date.available":["2012-11-27T00:15:07Z"],"dc:date.issued":["1986-12"],"dc:description.abstract":["This thesis discusses the supply support process for new construction ships, the feasibility, cost and impact of maximizing the use of the Navy supply system for repair parts and equipage, and provides regression models for use in program budget formulation and execution. The discussion includes the criteria for determining contractor versus government furnished equipment and material. The report also presents the results of a test case involving the transfer of parts procurement responsibility from the contractor to the Government."],"dc:description.uri":["http://archive.org/details/annalysisofgover1094521649"],"dc:format.extent":["93 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/21649"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["supply support","outfitting","provisioning","outfitting models","government furnished material"],"dc:subject.lcsh":["Management"],"dc:title":["An analysis of government furnished material (GFM)--in new construction ships."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:13:10Z"}