{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/21724"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/21724","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A comprehensive review of the time aspect of construction delay claims.","abstract":null,"abstract_html":null,"abstract_has_math":false,"creators":["Aucremanne, F. F."],"institution":"Georgia Institute of Technology","degree_name":"M.S. in Civil Engineering","degree_level":"Masters","degree_discipline":"Civil Engineering","degree_department":"NA","school":"NA","contributors":[],"advisors":[],"committee_chairs":[],"committee_members":["NA"],"year":1986,"date_issued":"1986","date_published":"1986","updated_at":"2026-11-21T22:40:21Z","subjects":["Civil engineering"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn641009971"],"render_values":[{"text":"ocn641009971","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/21724","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/21724","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F21724","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F21724","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeemember","label":"Committee Member","values":["NA"]},{"key":"dc:contributor.department","label":"Department","values":["NA"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["NA"]},{"key":"dc:contributor.school","label":"School","values":["NA"]},{"key":"dc:creator","label":"Author","values":["Aucremanne, F. F."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:15:42Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:15:42Z"]},{"key":"dc:date.issued","label":"Date","values":["1986"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Civil Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Georgia Institute of Technology"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["NA"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Civil engineering"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn641009971"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/21724"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/acomprehensivere1094521724"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["63, [87] leaves."]},{"key":"dc:title","label":"Title","values":["A comprehensive review of the time aspect of construction delay claims."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.committeemember":["NA"],"dc:contributor.department":["NA"],"dc:contributor.other":["NA"],"dc:contributor.school":["NA"],"dc:creator":["Aucremanne, F. F."],"dc:date.accessioned":["2012-11-27T00:15:42Z"],"dc:date.available":["2012-11-27T00:15:42Z"],"dc:date.issued":["1986"],"dc:description.award":["NA"],"dc:description.uri":["http://archive.org/details/acomprehensivere1094521724"],"dc:format.extent":["63, [87] leaves."],"dc:identifier.oclc":["ocn641009971"],"dc:identifier.uri":["https://hdl.handle.net/10945/21724"],"dc:subject.keyword":["NA"],"dc:subject.lcsh":["Civil engineering"],"dc:title":["A comprehensive review of the time aspect of construction delay claims."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Civil Engineering"],"thesis:institution_name":["Georgia Institute of Technology"]},"updated_at":"2026-11-21T22:40:21Z"}