{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/21736"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/21736","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The construction contractor performance evaluation as a control mechanism","abstract":"This study examined the Naval Facilities Engineering Command's current use of construction contractor performance evaluations (SF 1420) from the viewpoint of accepted control and measurement theory. Surveys of field contract administrators, supervisory civil engineers, field contract specialists, and construction contractors were completed to assess their use of and views about the evaluations. The study concluded that: (1) NAVFAC lacks standards of performance to describe the distinction between satisfactory, outstanding, and unsatisfactory performances (2) Contractors are not generally aware of the evaluation process; (3) Evaluations are not used to provide contractors feedback; (4) Evaluators are not well trained; (5) Evaluations are not fully utilized; (6) The data base of evaluation information is inadequate. The study recommends that: (1) NAVFAC issue a policy statement to contractors to clarify the evaluations uses, standards, and performance elements; (2) interim evaluations be issued to provide contractors feedback; (3) contractors receive copies of all their evaluations; (4) evaluators receive uniform training on completion of evaluations; (5) SF 1420 be modified to allow for a more specific evaluation.","abstract_html":"This study examined the Naval Facilities Engineering Command&#x27;s current use of construction contractor performance evaluations (SF 1420) from the viewpoint of accepted control and measurement theory. Surveys of field contract administrators, supervisory civil engineers, field contract specialists, and construction contractors were completed to assess their use of and views about the evaluations. The study concluded that: (1) NAVFAC lacks standards of performance to describe the distinction between satisfactory, outstanding, and unsatisfactory performances (2) Contractors are not generally aware of the evaluation process; (3) Evaluations are not used to provide contractors feedback; (4) Evaluators are not well trained; (5) Evaluations are not fully utilized; (6) The data base of evaluation information is inadequate. The study recommends that: (1) NAVFAC issue a policy statement to contractors to clarify the evaluations uses, standards, and performance elements; (2) interim evaluations be issued to provide contractors feedback; (3) contractors receive copies of all their evaluations; (4) evaluators receive uniform training on completion of evaluations; (5) SF 1420 be modified to allow for a more specific evaluation.","abstract_has_math":false,"creators":["Iselin, Steven Richard"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Moses, Douglas","Smith, Raymond W."],"committee_chairs":[],"committee_members":[],"year":1986,"date_issued":"1986-12","date_published":"1986-12","updated_at":"2026-11-19T06:23:09Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/21736","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/21736","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F21736","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F21736","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Moses, Douglas","Smith, Raymond W."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:creator","label":"Author","values":["Iselin, Steven Richard"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:15:47Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:15:47Z"]},{"key":"dc:date.issued","label":"Date","values":["1986-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["4c1daf68-6f22-4a48-b9e3-ce46727a1aca"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Evaluations","Construction","Appraisals"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/21736"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This study examined the Naval Facilities Engineering Command's current use of construction contractor performance evaluations (SF 1420) from the viewpoint of accepted control and measurement theory. Surveys of field contract administrators, supervisory civil engineers, field contract specialists, and construction contractors were completed to assess their use of and views about the evaluations. The study concluded that: (1) NAVFAC lacks standards of performance to describe the distinction between satisfactory, outstanding, and unsatisfactory performances (2) Contractors are not generally aware of the evaluation process; (3) Evaluations are not used to provide contractors feedback; (4) Evaluators are not well trained; (5) Evaluations are not fully utilized; (6) The data base of evaluation information is inadequate. The study recommends that: (1) NAVFAC issue a policy statement to contractors to clarify the evaluations uses, standards, and performance elements; (2) interim evaluations be issued to provide contractors feedback; (3) contractors receive copies of all their evaluations; (4) evaluators receive uniform training on completion of evaluations; (5) SF 1420 be modified to allow for a more specific evaluation."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/theconstructionc1094521736"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["92 p."]},{"key":"dc:title","label":"Title","values":["The construction contractor performance evaluation as a control mechanism"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Moses, Douglas","Smith, Raymond W."],"dc:contributor.department":["Administrative Sciences"],"dc:creator":["Iselin, Steven Richard"],"dc:date.accessioned":["2012-11-27T00:15:47Z"],"dc:date.available":["2012-11-27T00:15:47Z"],"dc:date.issued":["1986-12"],"dc:description.abstract":["This study examined the Naval Facilities Engineering Command's current use of construction contractor performance evaluations (SF 1420) from the viewpoint of accepted control and measurement theory. Surveys of field contract administrators, supervisory civil engineers, field contract specialists, and construction contractors were completed to assess their use of and views about the evaluations. The study concluded that: (1) NAVFAC lacks standards of performance to describe the distinction between satisfactory, outstanding, and unsatisfactory performances (2) Contractors are not generally aware of the evaluation process; (3) Evaluations are not used to provide contractors feedback; (4) Evaluators are not well trained; (5) Evaluations are not fully utilized; (6) The data base of evaluation information is inadequate. The study recommends that: (1) NAVFAC issue a policy statement to contractors to clarify the evaluations uses, standards, and performance elements; (2) interim evaluations be issued to provide contractors feedback; (3) contractors receive copies of all their evaluations; (4) evaluators receive uniform training on completion of evaluations; (5) SF 1420 be modified to allow for a more specific evaluation."],"dc:description.uri":["http://archive.org/details/theconstructionc1094521736"],"dc:format.extent":["92 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/21736"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["4c1daf68-6f22-4a48-b9e3-ce46727a1aca"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Evaluations","Construction","Appraisals"],"dc:title":["The construction contractor performance evaluation as a control mechanism"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:23:09Z"}