{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/21801"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/21801","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Early delivery of purchased material: a DOD problem","abstract":"The issue of early deliveries and their consequences for the Navy are new concepts which depart rather significantly from customary government thinking, where late delivery is the primary concern. The government normally accepts supplies when they are delivered, even if earlier than required. This thesis investigated whether or not early deliveries do in fact occur, and if so, whether they are a significant problem for the government.","abstract_html":"The issue of early deliveries and their consequences for the Navy are new concepts which depart rather significantly from customary government thinking, where late delivery is the primary concern. The government normally accepts supplies when they are delivered, even if earlier than required. This thesis investigated whether or not early deliveries do in fact occur, and if so, whether they are a significant problem for the government.","abstract_has_math":false,"creators":["Burleigh, Gerald A."],"institution":"Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Management","school":"Naval Postgraduate School","contributors":[],"advisors":["Moore, Thomas P."],"committee_chairs":[],"committee_members":["Smith, Ray"],"year":1986,"date_issued":"1986-12","date_published":"1986-12","updated_at":"2026-11-20T22:12:57Z","subjects":["Management"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/21801","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/21801","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F21801","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Moore, Thomas P."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Smith, Ray"]},{"key":"dc:contributor.department","label":"Department","values":["Management"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:contributor.school","label":"School","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Burleigh, Gerald A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:16:19Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:16:19Z"]},{"key":"dc:date.issued","label":"Date","values":["1986-12"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Early Delivery","Required Delivery Date (RDD)","Shelf -life","Inventory Managers","Production Lead Time (PLT)","Holding Costs"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/21801"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The issue of early deliveries and their consequences for the Navy are new concepts which depart rather significantly from customary government thinking, where late delivery is the primary concern. The government normally accepts supplies when they are delivered, even if earlier than required. This thesis investigated whether or not early deliveries do in fact occur, and if so, whether they are a significant problem for the government."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/earlydeliveryofp1094521801"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["96 p."]},{"key":"dc:title","label":"Title","values":["Early delivery of purchased material: a DOD problem"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, Supply Corps, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Moore, Thomas P."],"dc:contributor.committeemember":["Smith, Ray"],"dc:contributor.department":["Management"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:contributor.school":["Naval Postgraduate School"],"dc:creator":["Burleigh, Gerald A."],"dc:date.accessioned":["2012-11-27T00:16:19Z"],"dc:date.available":["2012-11-27T00:16:19Z"],"dc:date.issued":["1986-12"],"dc:description.abstract":["The issue of early deliveries and their consequences for the Navy are new concepts which depart rather significantly from customary government thinking, where late delivery is the primary concern. The government normally accepts supplies when they are delivered, even if earlier than required. This thesis investigated whether or not early deliveries do in fact occur, and if so, whether they are a significant problem for the government."],"dc:description.uri":["http://archive.org/details/earlydeliveryofp1094521801"],"dc:format.extent":["96 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/21801"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Early Delivery","Required Delivery Date (RDD)","Shelf -life","Inventory Managers","Production Lead Time (PLT)","Holding Costs"],"dc:subject.lcsh":["Management"],"dc:title":["Early delivery of purchased material: a DOD problem"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, Supply Corps, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:12:57Z"}