{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/21876"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/21876","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Fundamental Automated Scheduling System \"FASS\" a second look","abstract":"This research addresses the problems associated with integrating the Fundamental Automated Scheduling System (FASS), a PERT/CPM based overhaul scheduling device, into U.S. Naval Shipyards. Considered is the problem of how to effectively integrate FASS into all eight shipyards. The mission, organization, duties, and constraints of Naval shipyards are first described then the background concerning the requirements for the system is developed. the discussion then shifts to the implementation of the system in the shipyards and how each shipyard is utilizing its version of FASS. Finally, a summary of recommended actions and suggestions for further research is provided.","abstract_html":"This research addresses the problems associated with integrating the Fundamental Automated Scheduling System (FASS), a PERT/CPM based overhaul scheduling device, into U.S. Naval Shipyards. Considered is the problem of how to effectively integrate FASS into all eight shipyards. The mission, organization, duties, and constraints of Naval shipyards are first described then the background concerning the requirements for the system is developed. the discussion then shifts to the implementation of the system in the shipyards and how each shipyard is utilizing its version of FASS. Finally, a summary of recommended actions and suggestions for further research is provided.","abstract_has_math":false,"creators":["Cole, John F.","Macdonald, Peter"],"institution":"Naval Postgraduate School","degree_name":"M.S. in Information Systems","degree_level":"Masters","degree_discipline":"Information Systems","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["Lyons, Norman R."],"committee_chairs":[],"committee_members":["Moore, T. P."],"year":1993,"date_issued":"1993-09","date_published":"1993-09","updated_at":"2026-11-21T22:35:22Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/21876","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/21876","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F21876","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F21876","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Lyons, Norman R."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Moore, T. P."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Cole, John F.","Macdonald, Peter"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1986"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:16:51Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:16:51Z"]},{"key":"dc:date.issued","label":"Date","values":["1993-09"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Information Systems"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Information Systems"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Automatic scheduling","Scheduling systems","FASS shipyard scheduling","Cost/schedule control system"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/21876"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research addresses the problems associated with integrating the Fundamental Automated Scheduling System (FASS), a PERT/CPM based overhaul scheduling device, into U.S. Naval Shipyards. Considered is the problem of how to effectively integrate FASS into all eight shipyards. The mission, organization, duties, and constraints of Naval shipyards are first described then the background concerning the requirements for the system is developed. the discussion then shifts to the implementation of the system in the shipyards and how each shipyard is utilizing its version of FASS. Finally, a summary of recommended actions and suggestions for further research is provided."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/fundamentalautom1094521876"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["64 p."]},{"key":"dc:title","label":"Title","values":["Fundamental Automated Scheduling System \"FASS\" a second look"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Lyons, Norman R."],"dc:contributor.committeemember":["Moore, T. P."],"dc:contributor.department":["Department of Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Cole, John F.","Macdonald, Peter"],"dc:date":["December 1986"],"dc:date.accessioned":["2012-11-27T00:16:51Z"],"dc:date.available":["2012-11-27T00:16:51Z"],"dc:date.issued":["1993-09"],"dc:description.abstract":["This research addresses the problems associated with integrating the Fundamental Automated Scheduling System (FASS), a PERT/CPM based overhaul scheduling device, into U.S. Naval Shipyards. Considered is the problem of how to effectively integrate FASS into all eight shipyards. The mission, organization, duties, and constraints of Naval shipyards are first described then the background concerning the requirements for the system is developed. the discussion then shifts to the implementation of the system in the shipyards and how each shipyard is utilizing its version of FASS. Finally, a summary of recommended actions and suggestions for further research is provided."],"dc:description.uri":["http://archive.org/details/fundamentalautom1094521876"],"dc:format.extent":["64 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/21876"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Automatic scheduling","Scheduling systems","FASS shipyard scheduling","Cost/schedule control system"],"dc:subject.lcsh":["Management"],"dc:title":["Fundamental Automated Scheduling System \"FASS\" a second look"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Information Systems"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Information Systems"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:35:22Z"}