{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/22608"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/22608","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analysis of construction design estimation practices at Public Works Center","abstract":"The purpose of this study was to develop a statistically validated predictive model for construction design man-hours to aid in the decision-making process for assigning projects to PWC engineers and Architect-Engineer firms. This study was performed at PWC, Great Lakes and consisted of personnel interviews and the compilation of a database from internal reports. Although a predictive model was not developed, it was discovered that the design man-hours estimation procedure is inaccurate and causes PWC to hold customer funds that could be used for other purposes. A decision-making model was developed to assist in assigning project to in-house design resources or to Architect-Engineer firms. In addition, significant cost savings are already being realized through the use of the Computer Aided Design and Drafting System, with greater savings projected when the system is fully installed.","abstract_html":"The purpose of this study was to develop a statistically validated predictive model for construction design man-hours to aid in the decision-making process for assigning projects to PWC engineers and Architect-Engineer firms. This study was performed at PWC, Great Lakes and consisted of personnel interviews and the compilation of a database from internal reports. Although a predictive model was not developed, it was discovered that the design man-hours estimation procedure is inaccurate and causes PWC to hold customer funds that could be used for other purposes. A decision-making model was developed to assist in assigning project to in-house design resources or to Architect-Engineer firms. In addition, significant cost savings are already being realized through the use of the Computer Aided Design and Drafting System, with greater savings projected when the system is fully installed.","abstract_has_math":false,"creators":["George, Stephen L."],"institution":"Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Fremgen, James"],"committee_chairs":[],"committee_members":["Duke, James R."],"year":1987,"date_issued":"1987-03","date_published":"1987-03","updated_at":"2026-11-20T22:01:37Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/22608","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/22608","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F22608","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F22608","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Fremgen, James"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Duke, James R."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["George, Stephen L."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["March 1987"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:27:40Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:27:40Z"]},{"key":"dc:date.issued","label":"Date","values":["1987-03"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["PWC","A-E","Construction","Design","Cost","Decision-making"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/22608"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this study was to develop a statistically validated predictive model for construction design man-hours to aid in the decision-making process for assigning projects to PWC engineers and Architect-Engineer firms. This study was performed at PWC, Great Lakes and consisted of personnel interviews and the compilation of a database from internal reports. Although a predictive model was not developed, it was discovered that the design man-hours estimation procedure is inaccurate and causes PWC to hold customer funds that could be used for other purposes. A decision-making model was developed to assist in assigning project to in-house design resources or to Architect-Engineer firms. In addition, significant cost savings are already being realized through the use of the Computer Aided Design and Drafting System, with greater savings projected when the system is fully installed."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analysisofconstr1094522608"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["86 p."]},{"key":"dc:title","label":"Title","values":["Analysis of construction design estimation practices at Public Works Center"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Fremgen, James"],"dc:contributor.committeemember":["Duke, James R."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["George, Stephen L."],"dc:date":["March 1987"],"dc:date.accessioned":["2012-11-27T00:27:40Z"],"dc:date.available":["2012-11-27T00:27:40Z"],"dc:date.issued":["1987-03"],"dc:description.abstract":["The purpose of this study was to develop a statistically validated predictive model for construction design man-hours to aid in the decision-making process for assigning projects to PWC engineers and Architect-Engineer firms. This study was performed at PWC, Great Lakes and consisted of personnel interviews and the compilation of a database from internal reports. Although a predictive model was not developed, it was discovered that the design man-hours estimation procedure is inaccurate and causes PWC to hold customer funds that could be used for other purposes. A decision-making model was developed to assist in assigning project to in-house design resources or to Architect-Engineer firms. In addition, significant cost savings are already being realized through the use of the Computer Aided Design and Drafting System, with greater savings projected when the system is fully installed."],"dc:description.uri":["http://archive.org/details/analysisofconstr1094522608"],"dc:format.extent":["86 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/22608"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["PWC","A-E","Construction","Design","Cost","Decision-making"],"dc:subject.lcsh":["Management"],"dc:title":["Analysis of construction design estimation practices at Public Works Center"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:01:37Z"}