{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/22634"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/22634","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The application of cost-benefit analysis in raising the noncompetitve small purchase threshold.","abstract":"The purpose of this thesis is to determine the economic impact of a proposed acquisition policy change. As an interim measure, a class deviation to the Federal Acquisition Regulation was issued 4 June 1987. The change increases the small purchase noncompetitive threshold from $1,000 to $2,500 for a test period of one year. This deviation was issued after the research commenced but before this report was issued. The primary reason for this change is to reduce the administrative cost associated with obtaining competition. Consequently, the government should be prepared to make a trade-off between the administrative cost of competing and any savings realized from competition. Using the data collected from two field activities, NAS Point Mugu and NWC China Lake, an analysis was conducted to determine the costs and benefits associated with increasing this threshold. This research will focus on administrative order costs, shortage costs, procurement administrative lead time, and productivity of acquisition personnel. This thesis will conclude with observations about the noncompetitive threshold and make recommendations concerning a policy change.","abstract_html":"The purpose of this thesis is to determine the economic impact of a proposed acquisition policy change. As an interim measure, a class deviation to the Federal Acquisition Regulation was issued 4 June 1987. The change increases the small purchase noncompetitive threshold from $1,000 to $2,500 for a test period of one year. This deviation was issued after the research commenced but before this report was issued. The primary reason for this change is to reduce the administrative cost associated with obtaining competition. Consequently, the government should be prepared to make a trade-off between the administrative cost of competing and any savings realized from competition. Using the data collected from two field activities, NAS Point Mugu and NWC China Lake, an analysis was conducted to determine the costs and benefits associated with increasing this threshold. This research will focus on administrative order costs, shortage costs, procurement administrative lead time, and productivity of acquisition personnel. This thesis will conclude with observations about the noncompetitive threshold and make recommendations concerning a policy change.","abstract_has_math":true,"creators":["Howard, Robert Leo III."],"institution":"Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Carrick, Paul M."],"committee_chairs":[],"committee_members":["Smith, Raymond W."],"year":1987,"date_issued":"1987-09","date_published":"1987-09","updated_at":"2026-11-19T21:58:37Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/22634","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/22634","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F22634","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F22634","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Carrick, Paul M."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Smith, Raymond W."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Howard, Robert Leo III."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["September 1987"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:27:50Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:27:50Z"]},{"key":"dc:date.issued","label":"Date","values":["1987-09"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["small purchase noncompetitive threshold","increase to"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/22634"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this thesis is to determine the economic impact of a proposed acquisition policy change. As an interim measure, a class deviation to the Federal Acquisition Regulation was issued 4 June 1987. The change increases the small purchase noncompetitive threshold from $1,000 to $2,500 for a test period of one year. This deviation was issued after the research commenced but before this report was issued. The primary reason for this change is to reduce the administrative cost associated with obtaining competition. Consequently, the government should be prepared to make a trade-off between the administrative cost of competing and any savings realized from competition. Using the data collected from two field activities, NAS Point Mugu and NWC China Lake, an analysis was conducted to determine the costs and benefits associated with increasing this threshold. This research will focus on administrative order costs, shortage costs, procurement administrative lead time, and productivity of acquisition personnel. This thesis will conclude with observations about the noncompetitive threshold and make recommendations concerning a policy change."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/thepplicationofc1094522634"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["53 p."]},{"key":"dc:title","label":"Title","values":["The application of cost-benefit analysis in raising the noncompetitve small purchase threshold."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Carrick, Paul M."],"dc:contributor.committeemember":["Smith, Raymond W."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Howard, Robert Leo III."],"dc:date":["September 1987"],"dc:date.accessioned":["2012-11-27T00:27:50Z"],"dc:date.available":["2012-11-27T00:27:50Z"],"dc:date.issued":["1987-09"],"dc:description.abstract":["The purpose of this thesis is to determine the economic impact of a proposed acquisition policy change. As an interim measure, a class deviation to the Federal Acquisition Regulation was issued 4 June 1987. The change increases the small purchase noncompetitive threshold from $1,000 to $2,500 for a test period of one year. This deviation was issued after the research commenced but before this report was issued. The primary reason for this change is to reduce the administrative cost associated with obtaining competition. Consequently, the government should be prepared to make a trade-off between the administrative cost of competing and any savings realized from competition. Using the data collected from two field activities, NAS Point Mugu and NWC China Lake, an analysis was conducted to determine the costs and benefits associated with increasing this threshold. This research will focus on administrative order costs, shortage costs, procurement administrative lead time, and productivity of acquisition personnel. This thesis will conclude with observations about the noncompetitive threshold and make recommendations concerning a policy change."],"dc:description.uri":["http://archive.org/details/thepplicationofc1094522634"],"dc:format.extent":["53 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/22634"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["small purchase noncompetitive threshold","increase to"],"dc:subject.lcsh":["Management"],"dc:title":["The application of cost-benefit analysis in raising the noncompetitve small purchase threshold."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T21:58:37Z"}