{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/22642"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/22642","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Application of warranties in the procurement of spare parts at the Navy Field Contracting System level.","abstract":"The objectives of this research were to identify and discuss the background of current warranty policy and its application to the acquisition of spare parts within the Navy Field Contracting System, specifically the Navy Aviation Supply Office and the Navy Ships Parts Control Center. As a result of this research, the conclusions are as follows: 1) Navy policies on warranty development and implementation must be definitized, 2) Spare parts warranty form development should utilize the same decision process as used for weapon system warranties, 3) Weapon systems warranties ultimately drive the type of warranty coverage for spare parts, and 4) Pending a formalized administration and centralized data collection system, spare parts warranties should specify coverage for Materials and Workmanship defects, unless a more complex warranty is dictated by the weapon system program office.","abstract_html":"The objectives of this research were to identify and discuss the background of current warranty policy and its application to the acquisition of spare parts within the Navy Field Contracting System, specifically the Navy Aviation Supply Office and the Navy Ships Parts Control Center. As a result of this research, the conclusions are as follows: 1) Navy policies on warranty development and implementation must be definitized, 2) Spare parts warranty form development should utilize the same decision process as used for weapon system warranties, 3) Weapon systems warranties ultimately drive the type of warranty coverage for spare parts, and 4) Pending a formalized administration and centralized data collection system, spare parts warranties should specify coverage for Materials and Workmanship defects, unless a more complex warranty is dictated by the weapon system program office.","abstract_has_math":false,"creators":["Deschauer, Richard M."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["Lamm, David V."],"committee_chairs":[],"committee_members":["Smith, R.W."],"year":1987,"date_issued":"1987","date_published":"1987","updated_at":"2026-11-20T22:20:29Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/22642","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/22642","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F22642","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F22642","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Lamm, David V."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Smith, R.W."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Deschauer, Richard M."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1987"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:27:53Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:27:53Z"]},{"key":"dc:date.issued","label":"Date","values":["1987"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Acquisition","Warranty","Guarantee","Spare parts","Contracting","Breakout","U.S. Navy","Material"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/22642"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The objectives of this research were to identify and discuss the background of current warranty policy and its application to the acquisition of spare parts within the Navy Field Contracting System, specifically the Navy Aviation Supply Office and the Navy Ships Parts Control Center. As a result of this research, the conclusions are as follows: 1) Navy policies on warranty development and implementation must be definitized, 2) Spare parts warranty form development should utilize the same decision process as used for weapon system warranties, 3) Weapon systems warranties ultimately drive the type of warranty coverage for spare parts, and 4) Pending a formalized administration and centralized data collection system, spare parts warranties should specify coverage for Materials and Workmanship defects, unless a more complex warranty is dictated by the weapon system program office."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/applicationofwar1094522642"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["155 p."]},{"key":"dc:title","label":"Title","values":["Application of warranties in the procurement of spare parts at the Navy Field Contracting System level."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Lamm, David V."],"dc:contributor.committeemember":["Smith, R.W."],"dc:contributor.department":["Department of Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Deschauer, Richard M."],"dc:date":["June 1987"],"dc:date.accessioned":["2012-11-27T00:27:53Z"],"dc:date.available":["2012-11-27T00:27:53Z"],"dc:date.issued":["1987"],"dc:description.abstract":["The objectives of this research were to identify and discuss the background of current warranty policy and its application to the acquisition of spare parts within the Navy Field Contracting System, specifically the Navy Aviation Supply Office and the Navy Ships Parts Control Center. As a result of this research, the conclusions are as follows: 1) Navy policies on warranty development and implementation must be definitized, 2) Spare parts warranty form development should utilize the same decision process as used for weapon system warranties, 3) Weapon systems warranties ultimately drive the type of warranty coverage for spare parts, and 4) Pending a formalized administration and centralized data collection system, spare parts warranties should specify coverage for Materials and Workmanship defects, unless a more complex warranty is dictated by the weapon system program office."],"dc:description.uri":["http://archive.org/details/applicationofwar1094522642"],"dc:format.extent":["155 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/22642"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Acquisition","Warranty","Guarantee","Spare parts","Contracting","Breakout","U.S. Navy","Material"],"dc:subject.lcsh":["Management"],"dc:title":["Application of warranties in the procurement of spare parts at the Navy Field Contracting System level."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:20:29Z"}