{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/22866"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/22866","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An algorithm for generating ship schedules for a crisis deployment problem","abstract":"A deployment is the movement of armed forces from their home bases to their strategic locations. The movement of these forces usually involves the transportation of military personnel as well as equipment and supplies. In a crisis situation, it is essential that the deployment is carried out in a expeditious manner. This study considers the problem of constructing a deployment plan for sealift assets which transport military personnel, equipment, and supplies to their designated locations in the least amount of time. In the construction of such a plan, feasible transportation schedules for each asset must be specified. When the number of movement requirements is large, the problem of arranging schedules for the assets is nontrivial. This thesis, therefore, describes an algorithm to generate these schedules. Based on several examples, this algorithm is shown to be effective and can be used in conjunction with algorithms for solving the overall deployment problem as well.","abstract_html":"A deployment is the movement of armed forces from their home bases to their strategic locations. The movement of these forces usually involves the transportation of military personnel as well as equipment and supplies. In a crisis situation, it is essential that the deployment is carried out in a expeditious manner. This study considers the problem of constructing a deployment plan for sealift assets which transport military personnel, equipment, and supplies to their designated locations in the least amount of time. In the construction of such a plan, feasible transportation schedules for each asset must be specified. When the number of movement requirements is large, the problem of arranging schedules for the assets is nontrivial. This thesis, therefore, describes an algorithm to generate these schedules. Based on several examples, this algorithm is shown to be effective and can be used in conjunction with algorithms for solving the overall deployment problem as well.","abstract_has_math":false,"creators":["Buvik, Svein"],"institution":"Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":null,"school":null,"contributors":[],"advisors":["Lawphongpanich, Siriphong"],"committee_chairs":[],"committee_members":["Rosenthal, Richard"],"year":1988,"date_issued":"1988-09","date_published":"1988-09","updated_at":"2026-11-21T23:35:49Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/22866","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/22866","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F22866","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F22866","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Lawphongpanich, Siriphong"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Rosenthal, Richard"]},{"key":"dc:creator","label":"Author","values":["Buvik, Svein"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T18:05:37Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T18:05:37Z"]},{"key":"dc:date.issued","label":"Date","values":["1988-09"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Crisis Deployment","Deployment Plan","Schedule Generator","Dantzig-Wolfe Decomposition","Ship Schedule"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/22866"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["A deployment is the movement of armed forces from their home bases to their strategic locations. The movement of these forces usually involves the transportation of military personnel as well as equipment and supplies. In a crisis situation, it is essential that the deployment is carried out in a expeditious manner. This study considers the problem of constructing a deployment plan for sealift assets which transport military personnel, equipment, and supplies to their designated locations in the least amount of time. In the construction of such a plan, feasible transportation schedules for each asset must be specified. When the number of movement requirements is large, the problem of arranging schedules for the assets is nontrivial. This thesis, therefore, describes an algorithm to generate these schedules. Based on several examples, this algorithm is shown to be effective and can be used in conjunction with algorithms for solving the overall deployment problem as well."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/anlgorithmforgen1094522866"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["40 p."]},{"key":"dc:title","label":"Title","values":["An algorithm for generating ship schedules for a crisis deployment problem"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, Royal Norwegian Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Lawphongpanich, Siriphong"],"dc:contributor.committeemember":["Rosenthal, Richard"],"dc:creator":["Buvik, Svein"],"dc:date.accessioned":["2012-11-27T18:05:37Z"],"dc:date.available":["2012-11-27T18:05:37Z"],"dc:date.issued":["1988-09"],"dc:description.abstract":["A deployment is the movement of armed forces from their home bases to their strategic locations. The movement of these forces usually involves the transportation of military personnel as well as equipment and supplies. In a crisis situation, it is essential that the deployment is carried out in a expeditious manner. This study considers the problem of constructing a deployment plan for sealift assets which transport military personnel, equipment, and supplies to their designated locations in the least amount of time. In the construction of such a plan, feasible transportation schedules for each asset must be specified. When the number of movement requirements is large, the problem of arranging schedules for the assets is nontrivial. This thesis, therefore, describes an algorithm to generate these schedules. Based on several examples, this algorithm is shown to be effective and can be used in conjunction with algorithms for solving the overall deployment problem as well."],"dc:description.uri":["http://archive.org/details/anlgorithmforgen1094522866"],"dc:format.extent":["40 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/22866"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Crisis Deployment","Deployment Plan","Schedule Generator","Dantzig-Wolfe Decomposition","Ship Schedule"],"dc:title":["An algorithm for generating ship schedules for a crisis deployment problem"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, Royal Norwegian Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:35:49Z"}