{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/22986"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/22986","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Constraints placed on Marine Corps ammunition requirements by the PPBS","abstract":"The purpose of this report is to determine whether the products of the Planning, Programming and Budgeting System (PPBS) are worthwhile, they must be measured against some form of output. The prepositioned War Reserve (PWR) of the Marine Corps is a measure of sustainability: a desired output of the PPBS. This thesis investigated the PPBS, the Marine Corps programming methodology and ammunition requirement generation to determine whether these processes artificially constrain ammunition purchases. This thesis suggests that the constraints placed on ammunition requirements are related to the lack of long-range strategic goals, inadequate planning in the PPBS and the inherent weaknesses of program budgeting. (sdw)","abstract_html":"The purpose of this report is to determine whether the products of the Planning, Programming and Budgeting System (PPBS) are worthwhile, they must be measured against some form of output. The prepositioned War Reserve (PWR) of the Marine Corps is a measure of sustainability: a desired output of the PPBS. This thesis investigated the PPBS, the Marine Corps programming methodology and ammunition requirement generation to determine whether these processes artificially constrain ammunition purchases. This thesis suggests that the constraints placed on ammunition requirements are related to the lack of long-range strategic goals, inadequate planning in the PPBS and the inherent weaknesses of program budgeting. (sdw)","abstract_has_math":false,"creators":["Burlingham, Donald Michael"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["McCaffery, Jerry L."],"committee_chairs":[],"committee_members":["Liao, Shu S."],"year":1988,"date_issued":"1988-06","date_published":"1988-06","updated_at":"2026-11-21T23:40:11Z","subjects":["Management"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/22986","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/22986","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F22986","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F22986","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["McCaffery, Jerry L."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Liao, Shu S."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Burlingham, Donald Michael"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T18:06:33Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T18:06:33Z"]},{"key":"dc:date.issued","label":"Date","values":["1988-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["PPBS","Marine Corps POM Process","Ammunition Requirements"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/22986"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this report is to determine whether the products of the Planning, Programming and Budgeting System (PPBS) are worthwhile, they must be measured against some form of output. The prepositioned War Reserve (PWR) of the Marine Corps is a measure of sustainability: a desired output of the PPBS. This thesis investigated the PPBS, the Marine Corps programming methodology and ammunition requirement generation to determine whether these processes artificially constrain ammunition purchases. This thesis suggests that the constraints placed on ammunition requirements are related to the lack of long-range strategic goals, inadequate planning in the PPBS and the inherent weaknesses of program budgeting. (sdw)","To determine whether the products of the Planning, Programming and Budgeting System (PPBS) are worthwhile, they must be measured against some form of output. The Prepositioned War Reserve (PWR) of the Marine Corps is a measure of sustainability: a desired output of the PPBS. This thesis investigated the PPBS, the Marine Corps programming methodology and ammunition requirement generation to determine whether these processes artificially constrain ammunition purchases. This thesis suggests that the constraints placed on ammunition requirements are related to the lack of longrange strategic goals, inadequate planning in the PPBS and the inherent weaknesses of program budgeting."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/constraintsplace1094522986"]},{"key":"dc:title","label":"Title","values":["Constraints placed on Marine Corps ammunition requirements by the PPBS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["McCaffery, Jerry L."],"dc:contributor.committeemember":["Liao, Shu S."],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Burlingham, Donald Michael"],"dc:date.accessioned":["2012-11-27T18:06:33Z"],"dc:date.available":["2012-11-27T18:06:33Z"],"dc:date.issued":["1988-06"],"dc:description.abstract":["The purpose of this report is to determine whether the products of the Planning, Programming and Budgeting System (PPBS) are worthwhile, they must be measured against some form of output. The prepositioned War Reserve (PWR) of the Marine Corps is a measure of sustainability: a desired output of the PPBS. This thesis investigated the PPBS, the Marine Corps programming methodology and ammunition requirement generation to determine whether these processes artificially constrain ammunition purchases. This thesis suggests that the constraints placed on ammunition requirements are related to the lack of long-range strategic goals, inadequate planning in the PPBS and the inherent weaknesses of program budgeting. (sdw)","To determine whether the products of the Planning, Programming and Budgeting System (PPBS) are worthwhile, they must be measured against some form of output. The Prepositioned War Reserve (PWR) of the Marine Corps is a measure of sustainability: a desired output of the PPBS. This thesis investigated the PPBS, the Marine Corps programming methodology and ammunition requirement generation to determine whether these processes artificially constrain ammunition purchases. This thesis suggests that the constraints placed on ammunition requirements are related to the lack of longrange strategic goals, inadequate planning in the PPBS and the inherent weaknesses of program budgeting."],"dc:description.uri":["http://archive.org/details/constraintsplace1094522986"],"dc:identifier.uri":["https://hdl.handle.net/10945/22986"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["PPBS","Marine Corps POM Process","Ammunition Requirements"],"dc:subject.lcsh":["Management"],"dc:title":["Constraints placed on Marine Corps ammunition requirements by the PPBS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Marine Corps"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:40:11Z"}