{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/23352"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/23352","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The post-award costs of contracting out: the U.S. Navy's implementation of OMB Circular A-76","abstract":"The Commercial Activities program as delineated by OMB Circular A-76 has been controversial since its inception. One area of continuing controversy is the accuracy of pre-award cost estimates for estimating post-award program savings in operations that are contracted out. This thesis examines the post-award result of contracting out and identifies those costs that are either underestimated or not accounted for in the cost comparison process. Research was conducted on 14 West Coast activities that contracted out a food service operation, storage and warehousing operation, or both under a multi-function contract. The issues identified by the study include: the need for post-award guidance and policy, the need for increased claimant guidance at the field level, the absence of an adequate cost accounting system and post-award program controls, the need for increased contract administration staffing, a problem with budget flexibility at activities that have contracted out and continuing problems with performance definition.","abstract_html":"The Commercial Activities program as delineated by OMB Circular A-76 has been controversial since its inception. One area of continuing controversy is the accuracy of pre-award cost estimates for estimating post-award program savings in operations that are contracted out. This thesis examines the post-award result of contracting out and identifies those costs that are either underestimated or not accounted for in the cost comparison process. Research was conducted on 14 West Coast activities that contracted out a food service operation, storage and warehousing operation, or both under a multi-function contract. The issues identified by the study include: the need for post-award guidance and policy, the need for increased claimant guidance at the field level, the absence of an adequate cost accounting system and post-award program controls, the need for increased contract administration staffing, a problem with budget flexibility at activities that have contracted out and continuing problems with performance definition.","abstract_has_math":false,"creators":["Cole, Nancy Sage","Cole, Charles Pegram, Jr."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Carrick, Paul M."],"committee_chairs":[],"committee_members":["Jones, Larry R."],"year":1988,"date_issued":"1988-06","date_published":"1988-06","updated_at":"2026-11-20T22:02:57Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/23352","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/23352","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F23352","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Carrick, Paul M."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Jones, Larry R."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Cole, Nancy Sage","Cole, Charles Pegram, Jr."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1988"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T18:18:21Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T18:18:21Z"]},{"key":"dc:date.issued","label":"Date","values":["1988-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["OMB Circular A-76","Commercial activities (CA)","Contracting out","Privatization"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/23352"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Commercial Activities program as delineated by OMB Circular A-76 has been controversial since its inception. One area of continuing controversy is the accuracy of pre-award cost estimates for estimating post-award program savings in operations that are contracted out. This thesis examines the post-award result of contracting out and identifies those costs that are either underestimated or not accounted for in the cost comparison process. Research was conducted on 14 West Coast activities that contracted out a food service operation, storage and warehousing operation, or both under a multi-function contract. The issues identified by the study include: the need for post-award guidance and policy, the need for increased claimant guidance at the field level, the absence of an adequate cost accounting system and post-award program controls, the need for increased contract administration staffing, a problem with budget flexibility at activities that have contracted out and continuing problems with performance definition."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/thepostawardcost1094523352"]},{"key":"dc:title","label":"Title","values":["The post-award costs of contracting out: the U.S. Navy's implementation of OMB Circular A-76"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Carrick, Paul M."],"dc:contributor.committeemember":["Jones, Larry R."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Cole, Nancy Sage","Cole, Charles Pegram, Jr."],"dc:date":["June 1988"],"dc:date.accessioned":["2012-11-27T18:18:21Z"],"dc:date.available":["2012-11-27T18:18:21Z"],"dc:date.issued":["1988-06"],"dc:description.abstract":["The Commercial Activities program as delineated by OMB Circular A-76 has been controversial since its inception. One area of continuing controversy is the accuracy of pre-award cost estimates for estimating post-award program savings in operations that are contracted out. This thesis examines the post-award result of contracting out and identifies those costs that are either underestimated or not accounted for in the cost comparison process. Research was conducted on 14 West Coast activities that contracted out a food service operation, storage and warehousing operation, or both under a multi-function contract. The issues identified by the study include: the need for post-award guidance and policy, the need for increased claimant guidance at the field level, the absence of an adequate cost accounting system and post-award program controls, the need for increased contract administration staffing, a problem with budget flexibility at activities that have contracted out and continuing problems with performance definition."],"dc:description.uri":["http://archive.org/details/thepostawardcost1094523352"],"dc:identifier.uri":["https://hdl.handle.net/10945/23352"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["OMB Circular A-76","Commercial activities (CA)","Contracting out","Privatization"],"dc:subject.lcsh":["Management"],"dc:title":["The post-award costs of contracting out: the U.S. Navy's implementation of OMB Circular A-76"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:02:57Z"}