{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/23599"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/23599","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Cost estimation of software development and the implications for the program manager","abstract":"Cost estimation of computer software development is a critical problem for the Department of Defense. The acquisition of major weapons or hardware has been impacted cost overruns and schedule slippage in software development. Program managers are responsible for estimating a program's using the information provided by the contractor and the cost analysis divisions within the System Commands. This study first analyzes why variance exists between the different estimates for the same software project that are provided to the Program Manager as input to the budget estimate. This study then examines four methods that are used to understand and reduce the variance between the estimates to give the Program Manager more control over the software development cost estimation process. A set of five specific decision rules is developed for the Program Manager to implement in the cost estimation process. The intent of the study is to improve the accuracy of the cost estimate by reducing variance between the independently generated estimate submitted to the Program Manager.","abstract_html":"Cost estimation of computer software development is a critical problem for the Department of Defense. The acquisition of major weapons or hardware has been impacted cost overruns and schedule slippage in software development. Program managers are responsible for estimating a program&#x27;s using the information provided by the contractor and the cost analysis divisions within the System Commands. This study first analyzes why variance exists between the different estimates for the same software project that are provided to the Program Manager as input to the budget estimate. This study then examines four methods that are used to understand and reduce the variance between the estimates to give the Program Manager more control over the software development cost estimation process. A set of five specific decision rules is developed for the Program Manager to implement in the cost estimation process. The intent of the study is to improve the accuracy of the cost estimate by reducing variance between the independently generated estimate submitted to the Program Manager.","abstract_has_math":false,"creators":["Doyle, Glenn Cameron"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["San Miguel, Joseph G.","Sovereign, Michael G."],"committee_chairs":[],"committee_members":[],"year":1992,"date_issued":"1992-06","date_published":"1992-06","updated_at":"2026-11-21T22:50:11Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/23599","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/23599","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F23599","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F23599","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["San Miguel, Joseph G.","Sovereign, Michael G."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Doyle, Glenn Cameron"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1992"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-29T16:13:58Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-29T16:13:58Z"]},{"key":"dc:date.issued","label":"Date","values":["1992-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/23599"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Cost estimation of computer software development is a critical problem for the Department of Defense. The acquisition of major weapons or hardware has been impacted cost overruns and schedule slippage in software development. Program managers are responsible for estimating a program's using the information provided by the contractor and the cost analysis divisions within the System Commands. This study first analyzes why variance exists between the different estimates for the same software project that are provided to the Program Manager as input to the budget estimate. This study then examines four methods that are used to understand and reduce the variance between the estimates to give the Program Manager more control over the software development cost estimation process. A set of five specific decision rules is developed for the Program Manager to implement in the cost estimation process. The intent of the study is to improve the accuracy of the cost estimate by reducing variance between the independently generated estimate submitted to the Program Manager."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/costestimationof1094523599"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["137 p."]},{"key":"dc:title","label":"Title","values":["Cost estimation of software development and the implications for the program manager"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["San Miguel, Joseph G.","Sovereign, Michael G."],"dc:contributor.department":["Department of Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School"],"dc:creator":["Doyle, Glenn Cameron"],"dc:date":["June 1992"],"dc:date.accessioned":["2012-11-29T16:13:58Z"],"dc:date.available":["2012-11-29T16:13:58Z"],"dc:date.issued":["1992-06"],"dc:description.abstract":["Cost estimation of computer software development is a critical problem for the Department of Defense. The acquisition of major weapons or hardware has been impacted cost overruns and schedule slippage in software development. Program managers are responsible for estimating a program's using the information provided by the contractor and the cost analysis divisions within the System Commands. This study first analyzes why variance exists between the different estimates for the same software project that are provided to the Program Manager as input to the budget estimate. This study then examines four methods that are used to understand and reduce the variance between the estimates to give the Program Manager more control over the software development cost estimation process. A set of five specific decision rules is developed for the Program Manager to implement in the cost estimation process. The intent of the study is to improve the accuracy of the cost estimate by reducing variance between the independently generated estimate submitted to the Program Manager."],"dc:description.uri":["http://archive.org/details/costestimationof1094523599"],"dc:format.extent":["137 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/23599"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:title":["Cost estimation of software development and the implications for the program manager"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:50:11Z"}