{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/23793"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/23793","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Total Quality Management : a management philosophy for providing high quality construction","abstract":"Total Quality Management (TQM) is not a new concept. However, its use in my construction company is. Only recently (within the past ten years or so) have American companies started to realize the potential of TQM as a means of ensuring high quality products and services. With this realization has come implementation in manufacturing and service companies. A commercial construction company, like any other business, must provide a top quality finished product to its customer if it intends to stay in business. TQM is one way to work to that end. This report explores the quality problems facing my fictitious construction company, which I believe are fairly typical among the commercial construction industry, existing management methods, and the TQM method to ensure top quality production. It will be shown why I believe TQM or a variation thereof is the best method for controlling the quality of products and service during the construction process. Under the philosophy of TQM, we build quality into the finished product","abstract_html":"Total Quality Management (TQM) is not a new concept. However, its use in my construction company is. Only recently (within the past ten years or so) have American companies started to realize the potential of TQM as a means of ensuring high quality products and services. With this realization has come implementation in manufacturing and service companies. A commercial construction company, like any other business, must provide a top quality finished product to its customer if it intends to stay in business. TQM is one way to work to that end. This report explores the quality problems facing my fictitious construction company, which I believe are fairly typical among the commercial construction industry, existing management methods, and the TQM method to ensure top quality production. It will be shown why I believe TQM or a variation thereof is the best method for controlling the quality of products and service during the construction process. Under the philosophy of TQM, we build quality into the finished product","abstract_has_math":false,"creators":["Beckwith, Paul D."],"institution":"University of Maryland","degree_name":"Master of Science in Civil Engineering","degree_level":"Masters","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1992,"date_issued":"1992","date_published":"1992","updated_at":"2026-11-19T06:25:22Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn318075838"],"render_values":[{"text":"ocn318075838","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/23793","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/23793","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F23793","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F23793","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Beckwith, Paul D."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-29T16:15:33Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-29T16:15:33Z"]},{"key":"dc:date.issued","label":"Date","values":["1992"]},{"key":"dc:publisher","label":"Institution","values":["University of Maryland"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Civil Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Maryland"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn318075838"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/23793"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Total Quality Management (TQM) is not a new concept. However, its use in my construction company is. Only recently (within the past ten years or so) have American companies started to realize the potential of TQM as a means of ensuring high quality products and services. With this realization has come implementation in manufacturing and service companies. A commercial construction company, like any other business, must provide a top quality finished product to its customer if it intends to stay in business. TQM is one way to work to that end. This report explores the quality problems facing my fictitious construction company, which I believe are fairly typical among the commercial construction industry, existing management methods, and the TQM method to ensure top quality production. It will be shown why I believe TQM or a variation thereof is the best method for controlling the quality of products and service during the construction process. Under the philosophy of TQM, we build quality into the finished product"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/totalqualitymana1094523793"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["43 p."]},{"key":"dc:title","label":"Title","values":["Total Quality Management : a management philosophy for providing high quality construction"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Beckwith, Paul D."],"dc:date.accessioned":["2012-11-29T16:15:33Z"],"dc:date.available":["2012-11-29T16:15:33Z"],"dc:date.issued":["1992"],"dc:description.abstract":["Total Quality Management (TQM) is not a new concept. However, its use in my construction company is. Only recently (within the past ten years or so) have American companies started to realize the potential of TQM as a means of ensuring high quality products and services. With this realization has come implementation in manufacturing and service companies. A commercial construction company, like any other business, must provide a top quality finished product to its customer if it intends to stay in business. TQM is one way to work to that end. This report explores the quality problems facing my fictitious construction company, which I believe are fairly typical among the commercial construction industry, existing management methods, and the TQM method to ensure top quality production. It will be shown why I believe TQM or a variation thereof is the best method for controlling the quality of products and service during the construction process. Under the philosophy of TQM, we build quality into the finished product"],"dc:description.uri":["http://archive.org/details/totalqualitymana1094523793"],"dc:format.extent":["43 p."],"dc:identifier.oclc":["ocn318075838"],"dc:identifier.uri":["https://hdl.handle.net/10945/23793"],"dc:publisher":["University of Maryland"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Total Quality Management : a management philosophy for providing high quality construction"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Civil Engineering"],"thesis:institution_name":["University of Maryland"]},"updated_at":"2026-11-19T06:25:22Z"}