{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/2384"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/2384","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Lean implementation at White Sands Missile Range a case study of lean thinking applied in a government organization","abstract":"In this Joint Applied Project, we study application of lean thinking at White Sands Missile Range, an Army Major Range and Test Facility Base (MRTFB), tasked with developmental Test and Evaluation (T and E) as its primary mission. We interviewed a representative segment of leaders, managers, and working level lean implementers, and surveyed 285 participants in lean events at White Sands. We employed a comprehensive, uniform set of questions in those interviews and surveys to gain insight into significant expectations, questions, issues, concerns, difficulties, constraints, and uniquely governmental situations and circumstance related to this implementation. We organized and analyzed a massive and significant resulting data set around emerging themes including linkage between lean and personnel cuts, management support of lean, small incremental benefit versus large bottom-line impact, process documentation, metrics and measurement, vision, urgency, and goals, uniquely governmental issues, and the lean process itself. We offer relevant conclusions and recommendations, based on those themes, which may significantly aid similar government organization who are currently, or expectantly, engaged in lean implementations or other process improvement efforts. We offer those conclusions and recommendations as academic and neutral examinations of real issues associated with an actual lean implementation. Notwithstanding the difficulties and complexities that we have examined in this study, we find an overwhelming majority of our participants believe there was broad incremental benefit from lean, that its cost was warranted and necessary, and that it absolutely should continue to be used as a tool to achieve greater efficiency, quality, and effectiveness in government business processes.","abstract_html":"In this Joint Applied Project, we study application of lean thinking at White Sands Missile Range, an Army Major Range and Test Facility Base (MRTFB), tasked with developmental Test and Evaluation (T and E) as its primary mission. We interviewed a representative segment of leaders, managers, and working level lean implementers, and surveyed 285 participants in lean events at White Sands. We employed a comprehensive, uniform set of questions in those interviews and surveys to gain insight into significant expectations, questions, issues, concerns, difficulties, constraints, and uniquely governmental situations and circumstance related to this implementation. We organized and analyzed a massive and significant resulting data set around emerging themes including linkage between lean and personnel cuts, management support of lean, small incremental benefit versus large bottom-line impact, process documentation, metrics and measurement, vision, urgency, and goals, uniquely governmental issues, and the lean process itself. We offer relevant conclusions and recommendations, based on those themes, which may significantly aid similar government organization who are currently, or expectantly, engaged in lean implementations or other process improvement efforts. We offer those conclusions and recommendations as academic and neutral examinations of real issues associated with an actual lean implementation. Notwithstanding the difficulties and complexities that we have examined in this study, we find an overwhelming majority of our participants believe there was broad incremental benefit from lean, that its cost was warranted and necessary, and that it absolutely should continue to be used as a tool to achieve greater efficiency, quality, and effectiveness in government business processes.","abstract_has_math":false,"creators":["Telles, David D.","Garcia, Michael S.","Bissell, Daniel C."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":null,"school":"Graduate School of Business and Public Policy (GSBPP)","contributors":[],"advisors":["Boudreau, Michael","Doerr, Kenneth H."],"committee_chairs":[],"committee_members":[],"year":2006,"date_issued":"2006-12","date_published":"2006-12","updated_at":"2026-11-26T00:19:05Z","subjects":["Commerce","Databases","Leadership"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["80947064"],"render_values":[{"text":"80947064","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/2384","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/2384","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F2384","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F2384","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Boudreau, Michael","Doerr, Kenneth H."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program","Naval Postgraduate School (U.S.)"]},{"key":"dc:contributor.school","label":"School","values":["Graduate School of Business and Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Telles, David D.","Garcia, Michael S.","Bissell, Daniel C."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:35:02Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:35:02Z"]},{"key":"dc:date.issued","label":"Date","values":["2006-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Commerce","Databases","Leadership"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["80947064"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/2384"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Joint Applied Project"]},{"key":"dc:description.abstract","label":"Abstract","values":["In this Joint Applied Project, we study application of lean thinking at White Sands Missile Range, an Army Major Range and Test Facility Base (MRTFB), tasked with developmental Test and Evaluation (T and E) as its primary mission. We interviewed a representative segment of leaders, managers, and working level lean implementers, and surveyed 285 participants in lean events at White Sands. We employed a comprehensive, uniform set of questions in those interviews and surveys to gain insight into significant expectations, questions, issues, concerns, difficulties, constraints, and uniquely governmental situations and circumstance related to this implementation. We organized and analyzed a massive and significant resulting data set around emerging themes including linkage between lean and personnel cuts, management support of lean, small incremental benefit versus large bottom-line impact, process documentation, metrics and measurement, vision, urgency, and goals, uniquely governmental issues, and the lean process itself. We offer relevant conclusions and recommendations, based on those themes, which may significantly aid similar government organization who are currently, or expectantly, engaged in lean implementations or other process improvement efforts. We offer those conclusions and recommendations as academic and neutral examinations of real issues associated with an actual lean implementation. Notwithstanding the difficulties and complexities that we have examined in this study, we find an overwhelming majority of our participants believe there was broad incremental benefit from lean, that its cost was warranted and necessary, and that it absolutely should continue to be used as a tool to achieve greater efficiency, quality, and effectiveness in government business processes."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/leimplementation109452384"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xii, 95 p. : ill. ;"]},{"key":"dc:title","label":"Title","values":["Lean implementation at White Sands Missile Range a case study of lean thinking applied in a government organization"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:etd.verified","label":"Local Etd Verified","values":["no"]}]}],"canonical_facts":{"dc:contributor.advisor":["Boudreau, Michael","Doerr, Kenneth H."],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program","Naval Postgraduate School (U.S.)"],"dc:contributor.school":["Graduate School of Business and Public Policy (GSBPP)"],"dc:creator":["Telles, David D.","Garcia, Michael S.","Bissell, Daniel C."],"dc:date.accessioned":["2012-03-14T17:35:02Z"],"dc:date.available":["2012-03-14T17:35:02Z"],"dc:date.issued":["2006-12"],"dc:description":["Joint Applied Project"],"dc:description.abstract":["In this Joint Applied Project, we study application of lean thinking at White Sands Missile Range, an Army Major Range and Test Facility Base (MRTFB), tasked with developmental Test and Evaluation (T and E) as its primary mission. We interviewed a representative segment of leaders, managers, and working level lean implementers, and surveyed 285 participants in lean events at White Sands. We employed a comprehensive, uniform set of questions in those interviews and surveys to gain insight into significant expectations, questions, issues, concerns, difficulties, constraints, and uniquely governmental situations and circumstance related to this implementation. We organized and analyzed a massive and significant resulting data set around emerging themes including linkage between lean and personnel cuts, management support of lean, small incremental benefit versus large bottom-line impact, process documentation, metrics and measurement, vision, urgency, and goals, uniquely governmental issues, and the lean process itself. We offer relevant conclusions and recommendations, based on those themes, which may significantly aid similar government organization who are currently, or expectantly, engaged in lean implementations or other process improvement efforts. We offer those conclusions and recommendations as academic and neutral examinations of real issues associated with an actual lean implementation. Notwithstanding the difficulties and complexities that we have examined in this study, we find an overwhelming majority of our participants believe there was broad incremental benefit from lean, that its cost was warranted and necessary, and that it absolutely should continue to be used as a tool to achieve greater efficiency, quality, and effectiveness in government business processes."],"dc:description.uri":["http://archive.org/details/leimplementation109452384"],"dc:format.extent":["xii, 95 p. : ill. ;"],"dc:identifier.oclc":["80947064"],"dc:identifier.uri":["https://hdl.handle.net/10945/2384"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.lcsh":["Commerce","Databases","Leadership"],"dc:title":["Lean implementation at White Sands Missile Range a case study of lean thinking applied in a government organization"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:etd.verified":["no"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:19:05Z"}