{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/23916"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/23916","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The identification of early warning signals prior to contractor default","abstract":"The purpose of this thesis was to investigate the contract administration process, during contract performance, prior to the point at which a Termination for Default (T for D) decision is made. The objective of this thesis was to determine if there are systemic indicators that may provide early warning signals to contract administrators, during performance of the contract, that the contractor may fail in complying with the contractual obligations, thus being Terminated for Default. This research was limited to Fixed-price Supply-type contracts. The data for this research were obtained through literature research, telephone interviews and survey questionnaires conducted with various Defense Logistics Agency organizations. This thesis concluded by providing a \"Performance Indicator Management Model,\" developed by the researcher, based upon the data obtained from this research. This model focuses on the major areas of contract performance, monitored by contract administrators and provides the most effective indicators, which provide advance warning of contractor difficulty that may lead to default.","abstract_html":"The purpose of this thesis was to investigate the contract administration process, during contract performance, prior to the point at which a Termination for Default (T for D) decision is made. The objective of this thesis was to determine if there are systemic indicators that may provide early warning signals to contract administrators, during performance of the contract, that the contractor may fail in complying with the contractual obligations, thus being Terminated for Default. This research was limited to Fixed-price Supply-type contracts. The data for this research were obtained through literature research, telephone interviews and survey questionnaires conducted with various Defense Logistics Agency organizations. This thesis concluded by providing a &quot;Performance Indicator Management Model,&quot; developed by the researcher, based upon the data obtained from this research. This model focuses on the major areas of contract performance, monitored by contract administrators and provides the most effective indicators, which provide advance warning of contractor difficulty that may lead to default.","abstract_has_math":false,"creators":["Switlik, Roch A."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["Lamm, David V."],"committee_chairs":[],"committee_members":["Warmington, Jeffery"],"year":1992,"date_issued":"1992-12","date_published":"1992-12","updated_at":"2026-11-21T23:31:50Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/23916","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/23916","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F23916","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Lamm, David V."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Warmington, Jeffery"]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Switlik, Roch A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1992"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-29T16:18:23Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-29T16:18:23Z"]},{"key":"dc:date.issued","label":"Date","values":["1992-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/23916"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this thesis was to investigate the contract administration process, during contract performance, prior to the point at which a Termination for Default (T for D) decision is made. The objective of this thesis was to determine if there are systemic indicators that may provide early warning signals to contract administrators, during performance of the contract, that the contractor may fail in complying with the contractual obligations, thus being Terminated for Default. This research was limited to Fixed-price Supply-type contracts. The data for this research were obtained through literature research, telephone interviews and survey questionnaires conducted with various Defense Logistics Agency organizations. This thesis concluded by providing a \"Performance Indicator Management Model,\" developed by the researcher, based upon the data obtained from this research. This model focuses on the major areas of contract performance, monitored by contract administrators and provides the most effective indicators, which provide advance warning of contractor difficulty that may lead to default."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/theidentificatio1094523916"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["93 p."]},{"key":"dc:title","label":"Title","values":["The identification of early warning signals prior to contractor default"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Lamm, David V."],"dc:contributor.committeemember":["Warmington, Jeffery"],"dc:contributor.department":["Department of Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Switlik, Roch A."],"dc:date":["December 1992"],"dc:date.accessioned":["2012-11-29T16:18:23Z"],"dc:date.available":["2012-11-29T16:18:23Z"],"dc:date.issued":["1992-12"],"dc:description.abstract":["The purpose of this thesis was to investigate the contract administration process, during contract performance, prior to the point at which a Termination for Default (T for D) decision is made. The objective of this thesis was to determine if there are systemic indicators that may provide early warning signals to contract administrators, during performance of the contract, that the contractor may fail in complying with the contractual obligations, thus being Terminated for Default. This research was limited to Fixed-price Supply-type contracts. The data for this research were obtained through literature research, telephone interviews and survey questionnaires conducted with various Defense Logistics Agency organizations. This thesis concluded by providing a \"Performance Indicator Management Model,\" developed by the researcher, based upon the data obtained from this research. This model focuses on the major areas of contract performance, monitored by contract administrators and provides the most effective indicators, which provide advance warning of contractor difficulty that may lead to default."],"dc:description.uri":["http://archive.org/details/theidentificatio1094523916"],"dc:format.extent":["93 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/23916"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:title":["The identification of early warning signals prior to contractor default"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Army"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:31:50Z"}