{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/24089"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/24089","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The use of life cycle costing for the acquisition of non-major systems at the Naval Regional Contracting Center, Detachment, Long Beach, CA","abstract":"The use of Life Cycle Costing (LCC) has many potential benefits for the Government. These benefits range from reduced total ownership costs to increased reliability to improved maintainability. However, prior to applying the LCC technique, an analysis should be conducted to determine its usefulness. Consequently, the purpose of this thesis is to assess the applicability of the LCC concept to the purchase of non-major systems at the Naval Regional Contracting Center (NRCC) Detachment, Long Beach. The primary method of achieving this objective was through modifying the Graham LCC Decision Model for Spare Parts so that the Model could evaluate the usefulness of LCC for the purchase of a particular non-major system. Through the use of the Modified Graham LCC Decision Model, telephone and personal interviews, and a thorough literature review, the researcher found the usefulness of Life Cycle Costing for the acquisition of non-major systems at the NRCC, Detachment to be very limited.","abstract_html":"The use of Life Cycle Costing (LCC) has many potential benefits for the Government. These benefits range from reduced total ownership costs to increased reliability to improved maintainability. However, prior to applying the LCC technique, an analysis should be conducted to determine its usefulness. Consequently, the purpose of this thesis is to assess the applicability of the LCC concept to the purchase of non-major systems at the Naval Regional Contracting Center (NRCC) Detachment, Long Beach. The primary method of achieving this objective was through modifying the Graham LCC Decision Model for Spare Parts so that the Model could evaluate the usefulness of LCC for the purchase of a particular non-major system. Through the use of the Modified Graham LCC Decision Model, telephone and personal interviews, and a thorough literature review, the researcher found the usefulness of Life Cycle Costing for the acquisition of non-major systems at the NRCC, Detachment to be very limited.","abstract_has_math":false,"creators":["Tucker, R. Forrest"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["Matsushima, Rodney F.","Zirschky, Stephen"],"committee_chairs":[],"committee_members":[],"year":1992,"date_issued":"1992-06","date_published":"1992-06","updated_at":"2026-11-21T23:32:18Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/24089","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/24089","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F24089","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F24089","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Matsushima, Rodney F.","Zirschky, Stephen"]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Tucker, R. Forrest"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1992"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-29T16:19:37Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-29T16:19:37Z"]},{"key":"dc:date.issued","label":"Date","values":["1992-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Life cycle costing","Life cycle cost","Non-major systems","Procurement","Decision models"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/24089"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The use of Life Cycle Costing (LCC) has many potential benefits for the Government. These benefits range from reduced total ownership costs to increased reliability to improved maintainability. However, prior to applying the LCC technique, an analysis should be conducted to determine its usefulness. Consequently, the purpose of this thesis is to assess the applicability of the LCC concept to the purchase of non-major systems at the Naval Regional Contracting Center (NRCC) Detachment, Long Beach. The primary method of achieving this objective was through modifying the Graham LCC Decision Model for Spare Parts so that the Model could evaluate the usefulness of LCC for the purchase of a particular non-major system. Through the use of the Modified Graham LCC Decision Model, telephone and personal interviews, and a thorough literature review, the researcher found the usefulness of Life Cycle Costing for the acquisition of non-major systems at the NRCC, Detachment to be very limited."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/theuseoflifecycl1094524089"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["136 p."]},{"key":"dc:title","label":"Title","values":["The use of life cycle costing for the acquisition of non-major systems at the Naval Regional Contracting Center, Detachment, Long Beach, CA"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Matsushima, Rodney F.","Zirschky, Stephen"],"dc:contributor.department":["Department of Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Tucker, R. Forrest"],"dc:date":["June 1992"],"dc:date.accessioned":["2012-11-29T16:19:37Z"],"dc:date.available":["2012-11-29T16:19:37Z"],"dc:date.issued":["1992-06"],"dc:description.abstract":["The use of Life Cycle Costing (LCC) has many potential benefits for the Government. These benefits range from reduced total ownership costs to increased reliability to improved maintainability. However, prior to applying the LCC technique, an analysis should be conducted to determine its usefulness. Consequently, the purpose of this thesis is to assess the applicability of the LCC concept to the purchase of non-major systems at the Naval Regional Contracting Center (NRCC) Detachment, Long Beach. The primary method of achieving this objective was through modifying the Graham LCC Decision Model for Spare Parts so that the Model could evaluate the usefulness of LCC for the purchase of a particular non-major system. Through the use of the Modified Graham LCC Decision Model, telephone and personal interviews, and a thorough literature review, the researcher found the usefulness of Life Cycle Costing for the acquisition of non-major systems at the NRCC, Detachment to be very limited."],"dc:description.uri":["http://archive.org/details/theuseoflifecycl1094524089"],"dc:format.extent":["136 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/24089"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Life cycle costing","Life cycle cost","Non-major systems","Procurement","Decision models"],"dc:title":["The use of life cycle costing for the acquisition of non-major systems at the Naval Regional Contracting Center, Detachment, Long Beach, CA"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:32:18Z"}