{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/24122"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/24122","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Assessing the possible return on investment resulting from upgrading a subsystem.","abstract":"This thesis develops a decision aid to assist in assessing the cost effectiveness of upgrading a subsystem. The procedures developed in this thesis are to estimate the time of onset and the magnitude of the degradation of a subsystem and to estimate the best time to upgrade the subsystem. Two procedures are considered to estimate the time of onset of subsystem degradation and the magnitude of the degradation. One is maximum likelihood; the other is a Bayesian procedure. These estimates are then used in a cost model to estimate the cost of remaining with the current subsystem for the remaining planned lifetime of the system. A comparison of this cost with that of investing in the upgraded subsystem can be used to obtain a best time to invest in the upgraded subsystem. Procedures to assess the uncertainty of the cost advantage of upgrading the subsystem are also studied to give further information to the decision maker.","abstract_html":"This thesis develops a decision aid to assist in assessing the cost effectiveness of upgrading a subsystem. The procedures developed in this thesis are to estimate the time of onset and the magnitude of the degradation of a subsystem and to estimate the best time to upgrade the subsystem. Two procedures are considered to estimate the time of onset of subsystem degradation and the magnitude of the degradation. One is maximum likelihood; the other is a Bayesian procedure. These estimates are then used in a cost model to estimate the cost of remaining with the current subsystem for the remaining planned lifetime of the system. A comparison of this cost with that of investing in the upgraded subsystem can be used to obtain a best time to invest in the upgraded subsystem. Procedures to assess the uncertainty of the cost advantage of upgrading the subsystem are also studied to give further information to the decision maker.","abstract_has_math":false,"creators":["Chang, Tun-Jen"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research","school":"Naval Postgraduate School","contributors":[],"advisors":["Gaver, Donald P.","Jacobs, Patricia A."],"committee_chairs":[],"committee_members":[],"year":1993,"date_issued":"1993-03","date_published":"1993-03","updated_at":"2026-11-19T06:26:20Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/24122","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/24122","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F24122","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F24122","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Gaver, Donald P.","Jacobs, Patricia A."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research"]},{"key":"dc:contributor.school","label":"School","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Chang, Tun-Jen"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-29T16:20:39Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-29T16:20:39Z"]},{"key":"dc:date.issued","label":"Date","values":["1993-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/24122"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis develops a decision aid to assist in assessing the cost effectiveness of upgrading a subsystem. The procedures developed in this thesis are to estimate the time of onset and the magnitude of the degradation of a subsystem and to estimate the best time to upgrade the subsystem. Two procedures are considered to estimate the time of onset of subsystem degradation and the magnitude of the degradation. One is maximum likelihood; the other is a Bayesian procedure. These estimates are then used in a cost model to estimate the cost of remaining with the current subsystem for the remaining planned lifetime of the system. A comparison of this cost with that of investing in the upgraded subsystem can be used to obtain a best time to invest in the upgraded subsystem. Procedures to assess the uncertainty of the cost advantage of upgrading the subsystem are also studied to give further information to the decision maker."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/assessingpossibl1094524122"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["119 p."]},{"key":"dc:title","label":"Title","values":["Assessing the possible return on investment resulting from upgrading a subsystem."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, Chinese Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Gaver, Donald P.","Jacobs, Patricia A."],"dc:contributor.department":["Operations Research"],"dc:contributor.school":["Naval Postgraduate School"],"dc:creator":["Chang, Tun-Jen"],"dc:date.accessioned":["2012-11-29T16:20:39Z"],"dc:date.available":["2012-11-29T16:20:39Z"],"dc:date.issued":["1993-03"],"dc:description.abstract":["This thesis develops a decision aid to assist in assessing the cost effectiveness of upgrading a subsystem. The procedures developed in this thesis are to estimate the time of onset and the magnitude of the degradation of a subsystem and to estimate the best time to upgrade the subsystem. Two procedures are considered to estimate the time of onset of subsystem degradation and the magnitude of the degradation. One is maximum likelihood; the other is a Bayesian procedure. These estimates are then used in a cost model to estimate the cost of remaining with the current subsystem for the remaining planned lifetime of the system. A comparison of this cost with that of investing in the upgraded subsystem can be used to obtain a best time to invest in the upgraded subsystem. Procedures to assess the uncertainty of the cost advantage of upgrading the subsystem are also studied to give further information to the decision maker."],"dc:description.uri":["http://archive.org/details/assessingpossibl1094524122"],"dc:format.extent":["119 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/24122"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:title":["Assessing the possible return on investment resulting from upgrading a subsystem."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, Chinese Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:26:20Z"}