{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/24323"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/24323","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Global settlement negotiation procedures, techniques and strategies for contracts in dispute","abstract":"In this report the negotiation procedures, techniques and strategies for attempting global settlement of a contract in dispute will be studied. A global settlement is one in which all outstanding issues of a contract are settled and agreed upon in a comprehensive change. No formal manual exists to guide the Government team through the global settlement procedure. Since the procedures of other departments or acquisition commands may vary, only the Naval Facilities Engineering Command contracting procedures, regulations and rules will be studied. The global negotiation is usually a higher level negotiation between senior acquisition officials and the principal compancy officers of the contractor. Therefore, inclusion of field personnel in the negotiations is limited, but the information and assistance they provide in preparing for the negotiation is essential. In developing this report, actual cas studies from the Officer in Charge of Construction (OICC), Naval Facilities Engineering Command Contracts, TRIDENT, St. Marys, Georgia were used.","abstract_html":"In this report the negotiation procedures, techniques and strategies for attempting global settlement of a contract in dispute will be studied. A global settlement is one in which all outstanding issues of a contract are settled and agreed upon in a comprehensive change. No formal manual exists to guide the Government team through the global settlement procedure. Since the procedures of other departments or acquisition commands may vary, only the Naval Facilities Engineering Command contracting procedures, regulations and rules will be studied. The global negotiation is usually a higher level negotiation between senior acquisition officials and the principal compancy officers of the contractor. Therefore, inclusion of field personnel in the negotiations is limited, but the information and assistance they provide in preparing for the negotiation is essential. In developing this report, actual cas studies from the Officer in Charge of Construction (OICC), Naval Facilities Engineering Command Contracts, TRIDENT, St. Marys, Georgia were used.","abstract_has_math":false,"creators":["Fanshaw, Charles W."],"institution":"University of Florida","degree_name":"Master of Science in Civil Engineering","degree_level":"Masters","degree_discipline":null,"degree_department":"Civil Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1990,"date_issued":"1990","date_published":"1990","updated_at":"2026-11-19T06:26:20Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/24323","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/24323","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F24323","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.department","label":"Department","values":["Civil Engineering"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Fanshaw, Charles W."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-12-13T18:43:56Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-12-13T18:43:56Z"]},{"key":"dc:date.issued","label":"Date","values":["1990"]},{"key":"dc:publisher","label":"Institution","values":["University of Florida"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Civil Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Florida"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/24323"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["CIVINS (Civilian Institutions) Thesis document"]},{"key":"dc:description.abstract","label":"Abstract","values":["In this report the negotiation procedures, techniques and strategies for attempting global settlement of a contract in dispute will be studied. A global settlement is one in which all outstanding issues of a contract are settled and agreed upon in a comprehensive change. No formal manual exists to guide the Government team through the global settlement procedure. Since the procedures of other departments or acquisition commands may vary, only the Naval Facilities Engineering Command contracting procedures, regulations and rules will be studied. The global negotiation is usually a higher level negotiation between senior acquisition officials and the principal compancy officers of the contractor. Therefore, inclusion of field personnel in the negotiations is limited, but the information and assistance they provide in preparing for the negotiation is essential. In developing this report, actual cas studies from the Officer in Charge of Construction (OICC), Naval Facilities Engineering Command Contracts, TRIDENT, St. Marys, Georgia were used."]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["U.S. Naval Postgraduate School, CIVINS program"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/globalsettlement1094524323"]},{"key":"dc:title","label":"Title","values":["Global settlement negotiation procedures, techniques and strategies for contracts in dispute"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.department":["Civil Engineering"],"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Fanshaw, Charles W."],"dc:date.accessioned":["2012-12-13T18:43:56Z"],"dc:date.available":["2012-12-13T18:43:56Z"],"dc:date.issued":["1990"],"dc:description":["CIVINS (Civilian Institutions) Thesis document"],"dc:description.abstract":["In this report the negotiation procedures, techniques and strategies for attempting global settlement of a contract in dispute will be studied. A global settlement is one in which all outstanding issues of a contract are settled and agreed upon in a comprehensive change. No formal manual exists to guide the Government team through the global settlement procedure. Since the procedures of other departments or acquisition commands may vary, only the Naval Facilities Engineering Command contracting procedures, regulations and rules will be studied. The global negotiation is usually a higher level negotiation between senior acquisition officials and the principal compancy officers of the contractor. Therefore, inclusion of field personnel in the negotiations is limited, but the information and assistance they provide in preparing for the negotiation is essential. In developing this report, actual cas studies from the Officer in Charge of Construction (OICC), Naval Facilities Engineering Command Contracts, TRIDENT, St. Marys, Georgia were used."],"dc:description.sponsorship":["U.S. Naval Postgraduate School, CIVINS program"],"dc:description.uri":["http://archive.org/details/globalsettlement1094524323"],"dc:identifier.uri":["https://hdl.handle.net/10945/24323"],"dc:publisher":["University of Florida"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:title":["Global settlement negotiation procedures, techniques and strategies for contracts in dispute"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Civil Engineering"],"thesis:institution_name":["University of Florida"]},"updated_at":"2026-11-19T06:26:20Z"}