{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/24328"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/24328","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A study of construction contract modification: causes and impacts","abstract":"This paper discusses contract modification in public and private construction contracts. Previous studies on the same subject were limited to one type of organization, i.e., public contracts. This paper will cover both types of contracts and identify their differences. The problems of contract modification or change order are addressed in Chapter I. Contract modification terms in private contracts lack consistency in use while federal terminologies are easier to extract since one standard document, the Federal Acquisition Regulation (FAR), is used. Chapter II and Chapter III identify these differences. Chapter II discusses contract modification in private industry. The major discussion, however, is in the use of standard documents by the American Institute of Architects (AIA). Chapter III is contract modification in federal contracts. Chapter IV and V look at the different causes and impacts of contract modification. Chapter VI is a report on an independent study conducted at four Naval installations on contract modification. Chapter VII contains recommendations and conclusions of this study.","abstract_html":"This paper discusses contract modification in public and private construction contracts. Previous studies on the same subject were limited to one type of organization, i.e., public contracts. This paper will cover both types of contracts and identify their differences. The problems of contract modification or change order are addressed in Chapter I. Contract modification terms in private contracts lack consistency in use while federal terminologies are easier to extract since one standard document, the Federal Acquisition Regulation (FAR), is used. Chapter II and Chapter III identify these differences. Chapter II discusses contract modification in private industry. The major discussion, however, is in the use of standard documents by the American Institute of Architects (AIA). Chapter III is contract modification in federal contracts. Chapter IV and V look at the different causes and impacts of contract modification. Chapter VI is a report on an independent study conducted at four Naval installations on contract modification. Chapter VII contains recommendations and conclusions of this study.","abstract_has_math":false,"creators":["Gatchalian, Donald H."],"institution":"Georgia Institute of Technology","degree_name":"Master of Science in Civil Engineering","degree_level":"Masters","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1990,"date_issued":"1990-08","date_published":"1990-08","updated_at":"2026-11-19T06:26:20Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/24328","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/24328","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F24328","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Gatchalian, Donald H."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-12-13T18:43:58Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-12-13T18:43:58Z"]},{"key":"dc:date.issued","label":"Date","values":["1990-08"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Civil Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Georgia Institute of Technology"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/24328"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This paper discusses contract modification in public and private construction contracts. Previous studies on the same subject were limited to one type of organization, i.e., public contracts. This paper will cover both types of contracts and identify their differences. The problems of contract modification or change order are addressed in Chapter I. Contract modification terms in private contracts lack consistency in use while federal terminologies are easier to extract since one standard document, the Federal Acquisition Regulation (FAR), is used. Chapter II and Chapter III identify these differences. Chapter II discusses contract modification in private industry. The major discussion, however, is in the use of standard documents by the American Institute of Architects (AIA). Chapter III is contract modification in federal contracts. Chapter IV and V look at the different causes and impacts of contract modification. Chapter VI is a report on an independent study conducted at four Naval installations on contract modification. Chapter VII contains recommendations and conclusions of this study."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/astudyofconstruc1094524328"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["401 p."]},{"key":"dc:title","label":"Title","values":["A study of construction contract modification: causes and impacts"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Gatchalian, Donald H."],"dc:date.accessioned":["2012-12-13T18:43:58Z"],"dc:date.available":["2012-12-13T18:43:58Z"],"dc:date.issued":["1990-08"],"dc:description.abstract":["This paper discusses contract modification in public and private construction contracts. Previous studies on the same subject were limited to one type of organization, i.e., public contracts. This paper will cover both types of contracts and identify their differences. The problems of contract modification or change order are addressed in Chapter I. Contract modification terms in private contracts lack consistency in use while federal terminologies are easier to extract since one standard document, the Federal Acquisition Regulation (FAR), is used. Chapter II and Chapter III identify these differences. Chapter II discusses contract modification in private industry. The major discussion, however, is in the use of standard documents by the American Institute of Architects (AIA). Chapter III is contract modification in federal contracts. Chapter IV and V look at the different causes and impacts of contract modification. Chapter VI is a report on an independent study conducted at four Naval installations on contract modification. Chapter VII contains recommendations and conclusions of this study."],"dc:description.uri":["http://archive.org/details/astudyofconstruc1094524328"],"dc:format.extent":["401 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/24328"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["A study of construction contract modification: causes and impacts"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Civil Engineering"],"thesis:institution_name":["Georgia Institute of Technology"]},"updated_at":"2026-11-19T06:26:20Z"}