{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/24380"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/24380","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A guide to resolving disputes over defective specifications","abstract":"This thesis investigated the legal criteria involved in resolving defective specification disputes. Appellate case law was researched to discover the rules used by the court systems to decide cases involving defective specifications. These rules were organized in flowchart form to provide a guide for construction contract administrators. Separate flow charts were prepared for method and performance specifications, and the differences between the two types of specifications were discussed. Appellate court cases were used to illustrate how the courts have interpreted and applied the legal rules in construction contract disputes. The differences between defective specifications and differing site conditions were also investigated. A discussion of the significant differences was provided to assist construction professionals in distinguishing the two dispute situations.","abstract_html":"This thesis investigated the legal criteria involved in resolving defective specification disputes. Appellate case law was researched to discover the rules used by the court systems to decide cases involving defective specifications. These rules were organized in flowchart form to provide a guide for construction contract administrators. Separate flow charts were prepared for method and performance specifications, and the differences between the two types of specifications were discussed. Appellate court cases were used to illustrate how the courts have interpreted and applied the legal rules in construction contract disputes. The differences between defective specifications and differing site conditions were also investigated. A discussion of the significant differences was provided to assist construction professionals in distinguishing the two dispute situations.","abstract_has_math":false,"creators":["Wirsching, Steven M."],"institution":"Pennsylvania State University","degree_name":"Master of Science in Civil Engineering","degree_level":"Masters","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Thomas, M. Randolph"],"committee_chairs":[],"committee_members":[],"year":1992,"date_issued":"1992-05","date_published":"1992-05","updated_at":"2026-11-19T06:26:20Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/24380","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/24380","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F24380","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F24380","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Thomas, M. Randolph"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Wirsching, Steven M."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-12-13T18:44:16Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-12-13T18:44:16Z"]},{"key":"dc:date.issued","label":"Date","values":["1992-05"]},{"key":"dc:publisher","label":"Institution","values":["Pennsylvania State University"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Civil Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Pennsylvania State University"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/24380"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis investigated the legal criteria involved in resolving defective specification disputes. Appellate case law was researched to discover the rules used by the court systems to decide cases involving defective specifications. These rules were organized in flowchart form to provide a guide for construction contract administrators. Separate flow charts were prepared for method and performance specifications, and the differences between the two types of specifications were discussed. Appellate court cases were used to illustrate how the courts have interpreted and applied the legal rules in construction contract disputes. The differences between defective specifications and differing site conditions were also investigated. A discussion of the significant differences was provided to assist construction professionals in distinguishing the two dispute situations."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/aguidetoresolvin1094524380"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["82 p."]},{"key":"dc:title","label":"Title","values":["A guide to resolving disputes over defective specifications"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Thomas, M. Randolph"],"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Wirsching, Steven M."],"dc:date.accessioned":["2012-12-13T18:44:16Z"],"dc:date.available":["2012-12-13T18:44:16Z"],"dc:date.issued":["1992-05"],"dc:description.abstract":["This thesis investigated the legal criteria involved in resolving defective specification disputes. Appellate case law was researched to discover the rules used by the court systems to decide cases involving defective specifications. These rules were organized in flowchart form to provide a guide for construction contract administrators. Separate flow charts were prepared for method and performance specifications, and the differences between the two types of specifications were discussed. Appellate court cases were used to illustrate how the courts have interpreted and applied the legal rules in construction contract disputes. The differences between defective specifications and differing site conditions were also investigated. A discussion of the significant differences was provided to assist construction professionals in distinguishing the two dispute situations."],"dc:description.uri":["http://archive.org/details/aguidetoresolvin1094524380"],"dc:format.extent":["82 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/24380"],"dc:publisher":["Pennsylvania State University"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:title":["A guide to resolving disputes over defective specifications"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Civil Engineering"],"thesis:institution_name":["Pennsylvania State University"]},"updated_at":"2026-11-19T06:26:20Z"}