{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/25668"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/25668","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analysis of contract modifications on Military Construction (MILCON) projects administered by the U.S. Naval Facilities Engineering Command","abstract":"This thesis analyzes the contract modifications on 135 Military Construction (MILCON) projects administered by the U.S. Naval Facilities Engineering Command (NAVFAC). Data for this study came from projects from 9 of the 10 Engineering Field Divisions (EFD' s)/Engineering Field Activities (EFA' s) that makeup the NAVFAC organization. Based on the results of the analysis observations were made regarding the performance of the EFD/EFA's in major areas such as claims, value engineering, scope changes and A-E liability modifications. Major differences between the performance of the individual EFD/ EFA's and NAVFAC as a whole are also addressed. Lastly, the relationship between the Facility Category Code of the proposed structure or building and the project's modification rate is analyzed. The criteria used for the comparative analysis of the EFD/EFA's was: modification reason code assigned, trade affected by the modification, modification cost and the project's modification rate. Findings and conclusions are presented based on the results of the analysis. (MM)","abstract_html":"This thesis analyzes the contract modifications on 135 Military Construction (MILCON) projects administered by the U.S. Naval Facilities Engineering Command (NAVFAC). Data for this study came from projects from 9 of the 10 Engineering Field Divisions (EFD&#x27; s)/Engineering Field Activities (EFA&#x27; s) that makeup the NAVFAC organization. Based on the results of the analysis observations were made regarding the performance of the EFD/EFA&#x27;s in major areas such as claims, value engineering, scope changes and A-E liability modifications. Major differences between the performance of the individual EFD/ EFA&#x27;s and NAVFAC as a whole are also addressed. Lastly, the relationship between the Facility Category Code of the proposed structure or building and the project&#x27;s modification rate is analyzed. The criteria used for the comparative analysis of the EFD/EFA&#x27;s was: modification reason code assigned, trade affected by the modification, modification cost and the project&#x27;s modification rate. Findings and conclusions are presented based on the results of the analysis. (MM)","abstract_has_math":false,"creators":["Arellano, Hector Armando."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Engineering","degree_level":"Masters","degree_discipline":"Engineering","degree_department":"Engineering","school":"NA","contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1995,"date_issued":"1995-12","date_published":"1995-12","updated_at":"2026-11-21T22:36:33Z","subjects":["CONTRACT ADMINISTRATION"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640653345"],"render_values":[{"text":"ocn640653345","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/25668","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/25668","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F25668","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F25668","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.department","label":"Department","values":["Engineering"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["NA"]},{"key":"dc:contributor.school","label":"School","values":["NA"]},{"key":"dc:creator","label":"Author","values":["Arellano, Hector Armando."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-01-23T21:53:14Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-01-23T21:53:14Z"]},{"key":"dc:date.issued","label":"Date","values":["1995-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Texas at Austin"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["CONTRACT ADMINISTRATION"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640653345"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/25668"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis analyzes the contract modifications on 135 Military Construction (MILCON) projects administered by the U.S. Naval Facilities Engineering Command (NAVFAC). Data for this study came from projects from 9 of the 10 Engineering Field Divisions (EFD' s)/Engineering Field Activities (EFA' s) that makeup the NAVFAC organization. Based on the results of the analysis observations were made regarding the performance of the EFD/EFA's in major areas such as claims, value engineering, scope changes and A-E liability modifications. Major differences between the performance of the individual EFD/ EFA's and NAVFAC as a whole are also addressed. Lastly, the relationship between the Facility Category Code of the proposed structure or building and the project's modification rate is analyzed. The criteria used for the comparative analysis of the EFD/EFA's was: modification reason code assigned, trade affected by the modification, modification cost and the project's modification rate. Findings and conclusions are presented based on the results of the analysis. (MM)"]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analysisofcontra1094525668"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["122 leaves"]},{"key":"dc:title","label":"Title","values":["Analysis of contract modifications on Military Construction (MILCON) projects administered by the U.S. Naval Facilities Engineering Command"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.department":["Engineering"],"dc:contributor.other":["NA"],"dc:contributor.school":["NA"],"dc:creator":["Arellano, Hector Armando."],"dc:date.accessioned":["2013-01-23T21:53:14Z"],"dc:date.available":["2013-01-23T21:53:14Z"],"dc:date.issued":["1995-12"],"dc:description.abstract":["This thesis analyzes the contract modifications on 135 Military Construction (MILCON) projects administered by the U.S. Naval Facilities Engineering Command (NAVFAC). Data for this study came from projects from 9 of the 10 Engineering Field Divisions (EFD' s)/Engineering Field Activities (EFA' s) that makeup the NAVFAC organization. Based on the results of the analysis observations were made regarding the performance of the EFD/EFA's in major areas such as claims, value engineering, scope changes and A-E liability modifications. Major differences between the performance of the individual EFD/ EFA's and NAVFAC as a whole are also addressed. Lastly, the relationship between the Facility Category Code of the proposed structure or building and the project's modification rate is analyzed. The criteria used for the comparative analysis of the EFD/EFA's was: modification reason code assigned, trade affected by the modification, modification cost and the project's modification rate. Findings and conclusions are presented based on the results of the analysis. (MM)"],"dc:description.award":["NA"],"dc:description.uri":["http://archive.org/details/analysisofcontra1094525668"],"dc:format.extent":["122 leaves"],"dc:identifier.oclc":["ocn640653345"],"dc:identifier.uri":["https://hdl.handle.net/10945/25668"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:subject.lcsh":["CONTRACT ADMINISTRATION"],"dc:title":["Analysis of contract modifications on Military Construction (MILCON) projects administered by the U.S. Naval Facilities Engineering Command"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Engineering"],"thesis:institution_name":["University of Texas at Austin"]},"updated_at":"2026-11-21T22:36:33Z"}