{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/25785"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/25785","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Construction productivity improvement at a construction battalion unit.","abstract":"The objective of this study is to improve the OBUs productivity, quality and competitiveness using a combination of OPI, BPl and reengineering techniques. This paper will organize the CBU to conduct this type of program, select, analyze and streamline/reengineer five specific processes, identify ways to measure and control these processes, and recommend future courses of action. (MM)","abstract_html":"The objective of this study is to improve the OBUs productivity, quality and competitiveness using a combination of OPI, BPl and reengineering techniques. This paper will organize the CBU to conduct this type of program, select, analyze and streamline/reengineer five specific processes, identify ways to measure and control these processes, and recommend future courses of action. (MM)","abstract_has_math":false,"creators":["Helinski, Mary J."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Civil Engineering","degree_level":"Masters","degree_discipline":"Civil Engineering","degree_department":"Civil Engineering","school":"NA","contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1995,"date_issued":"1995","date_published":"1995","updated_at":"2026-11-21T22:49:31Z","subjects":["ManageMENT PLANNING AND CONTROL"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640653343"],"render_values":[{"text":"ocn640653343","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/25785","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/25785","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F25785","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F25785","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.department","label":"Department","values":["Civil Engineering"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["NA"]},{"key":"dc:contributor.school","label":"School","values":["NA"]},{"key":"dc:creator","label":"Author","values":["Helinski, Mary J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-01-23T21:54:00Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-01-23T21:54:00Z"]},{"key":"dc:date.issued","label":"Date","values":["1995"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Civil Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Maryland at College Park"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["ManageMENT PLANNING AND CONTROL"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640653343"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/25785"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The objective of this study is to improve the OBUs productivity, quality and competitiveness using a combination of OPI, BPl and reengineering techniques. This paper will organize the CBU to conduct this type of program, select, analyze and streamline/reengineer five specific processes, identify ways to measure and control these processes, and recommend future courses of action. (MM)"]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/constructionprod1094525785"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["1 v. (various pagings)"]},{"key":"dc:title","label":"Title","values":["Construction productivity improvement at a construction battalion unit."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.department":["Civil Engineering"],"dc:contributor.other":["NA"],"dc:contributor.school":["NA"],"dc:creator":["Helinski, Mary J."],"dc:date.accessioned":["2013-01-23T21:54:00Z"],"dc:date.available":["2013-01-23T21:54:00Z"],"dc:date.issued":["1995"],"dc:description.abstract":["The objective of this study is to improve the OBUs productivity, quality and competitiveness using a combination of OPI, BPl and reengineering techniques. This paper will organize the CBU to conduct this type of program, select, analyze and streamline/reengineer five specific processes, identify ways to measure and control these processes, and recommend future courses of action. (MM)"],"dc:description.award":["NA"],"dc:description.uri":["http://archive.org/details/constructionprod1094525785"],"dc:format.extent":["1 v. (various pagings)"],"dc:identifier.oclc":["ocn640653343"],"dc:identifier.uri":["https://hdl.handle.net/10945/25785"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:subject.lcsh":["ManageMENT PLANNING AND CONTROL"],"dc:title":["Construction productivity improvement at a construction battalion unit."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Civil Engineering"],"thesis:institution_name":["University of Maryland at College Park"]},"updated_at":"2026-11-21T22:49:31Z"}