{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/25891"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/25891","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The Eichleay formula in Naval Facilities Engineering Command (NAVFACENGCOM) contracting.","abstract":"When a delay causes contractors to be shut down or turn idle for a period of time, fixed overhead as well as general and administrative expenses continue to be incurred. However, the amount of direct costs to which these expenses can be allocated or expensed is reduced. The result is an amount of overhead that is unabsorbed, which can be allocated to that specific delay. Various pricing methods for calculating these unabsorbed home office overhead expenses currently exist in the construction litigation process today. The per diem Eichleay method is the most frequently utilized method. In this era of financial austerity, the armed forces are facing challenges to maintain operational readiness with fewer personnel and leaner operating capital due to shrinking defense budgets. One way to optimize these precious and limited resources is the efficient and effective use of construction funds and personnel in Naval Facilities Engineering Command (NAVFACENGCOM) construction administration. This report focuses on the commonly utilized Eichleay method of computation, as well as alternative methods currently utilized in today's construction industry. Research and analysis was conducted on current litigated construction claims resulting from disputes involving the Eichleay formula. Assumptions about the Eichleay formula method and its shortcomings have been provided. Emphasis on utilizing other methods of calculating these damages to the contractor as well as situation specific modifications of the Eichleay formula itself are also included. Conclusions were drawn from the data that identify significant strengths and weaknesses among these common place case situations. Recommendations were made for future possible improvements regarding the recognition and avoidance of potential claims by contractors. The target audience of this report is the junior construction project manager (Naval Civil Engineer Corps officer/civilian government personnel) and is to be utilized as a guide in the NAVFACENGCOM construction organization atmosphere for calculating legitimate contractor's unabsorbed home office overhead expense for a government caused suspension, delay, or disruption to the contract performance.","abstract_html":"When a delay causes contractors to be shut down or turn idle for a period of time, fixed overhead as well as general and administrative expenses continue to be incurred. However, the amount of direct costs to which these expenses can be allocated or expensed is reduced. The result is an amount of overhead that is unabsorbed, which can be allocated to that specific delay. Various pricing methods for calculating these unabsorbed home office overhead expenses currently exist in the construction litigation process today. The per diem Eichleay method is the most frequently utilized method. In this era of financial austerity, the armed forces are facing challenges to maintain operational readiness with fewer personnel and leaner operating capital due to shrinking defense budgets. One way to optimize these precious and limited resources is the efficient and effective use of construction funds and personnel in Naval Facilities Engineering Command (NAVFACENGCOM) construction administration. This report focuses on the commonly utilized Eichleay method of computation, as well as alternative methods currently utilized in today&#x27;s construction industry. Research and analysis was conducted on current litigated construction claims resulting from disputes involving the Eichleay formula. Assumptions about the Eichleay formula method and its shortcomings have been provided. Emphasis on utilizing other methods of calculating these damages to the contractor as well as situation specific modifications of the Eichleay formula itself are also included. Conclusions were drawn from the data that identify significant strengths and weaknesses among these common place case situations. Recommendations were made for future possible improvements regarding the recognition and avoidance of potential claims by contractors. The target audience of this report is the junior construction project manager (Naval Civil Engineer Corps officer/civilian government personnel) and is to be utilized as a guide in the NAVFACENGCOM construction organization atmosphere for calculating legitimate contractor&#x27;s unabsorbed home office overhead expense for a government caused suspension, delay, or disruption to the contract performance.","abstract_has_math":false,"creators":["Bergan, Shawn J."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"Master of Civil Engineering","degree_level":"Masters","degree_discipline":"Civil Engineering","degree_department":"Civil Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1994,"date_issued":"1994","date_published":"1994","updated_at":"2026-11-20T22:16:30Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640605659"],"render_values":[{"text":"ocn640605659","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/25891","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/25891","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F25891","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F25891","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.department","label":"Department","values":["Civil Engineering"]},{"key":"dc:creator","label":"Author","values":["Bergan, Shawn J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-01-23T21:54:44Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-01-23T21:54:44Z"]},{"key":"dc:date.issued","label":"Date","values":["1994"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Civil Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Texas A&M"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640605659"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/25891"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["When a delay causes contractors to be shut down or turn idle for a period of time, fixed overhead as well as general and administrative expenses continue to be incurred. However, the amount of direct costs to which these expenses can be allocated or expensed is reduced. The result is an amount of overhead that is unabsorbed, which can be allocated to that specific delay. Various pricing methods for calculating these unabsorbed home office overhead expenses currently exist in the construction litigation process today. The per diem Eichleay method is the most frequently utilized method. In this era of financial austerity, the armed forces are facing challenges to maintain operational readiness with fewer personnel and leaner operating capital due to shrinking defense budgets. One way to optimize these precious and limited resources is the efficient and effective use of construction funds and personnel in Naval Facilities Engineering Command (NAVFACENGCOM) construction administration. This report focuses on the commonly utilized Eichleay method of computation, as well as alternative methods currently utilized in today's construction industry. Research and analysis was conducted on current litigated construction claims resulting from disputes involving the Eichleay formula. Assumptions about the Eichleay formula method and its shortcomings have been provided. Emphasis on utilizing other methods of calculating these damages to the contractor as well as situation specific modifications of the Eichleay formula itself are also included. Conclusions were drawn from the data that identify significant strengths and weaknesses among these common place case situations. Recommendations were made for future possible improvements regarding the recognition and avoidance of potential claims by contractors. The target audience of this report is the junior construction project manager (Naval Civil Engineer Corps officer/civilian government personnel) and is to be utilized as a guide in the NAVFACENGCOM construction organization atmosphere for calculating legitimate contractor's unabsorbed home office overhead expense for a government caused suspension, delay, or disruption to the contract performance."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/theeichleayformu1094525891"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["1 v. (various foliations)"]},{"key":"dc:title","label":"Title","values":["The Eichleay formula in Naval Facilities Engineering Command (NAVFACENGCOM) contracting."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.department":["Civil Engineering"],"dc:creator":["Bergan, Shawn J."],"dc:date.accessioned":["2013-01-23T21:54:44Z"],"dc:date.available":["2013-01-23T21:54:44Z"],"dc:date.issued":["1994"],"dc:description.abstract":["When a delay causes contractors to be shut down or turn idle for a period of time, fixed overhead as well as general and administrative expenses continue to be incurred. However, the amount of direct costs to which these expenses can be allocated or expensed is reduced. The result is an amount of overhead that is unabsorbed, which can be allocated to that specific delay. Various pricing methods for calculating these unabsorbed home office overhead expenses currently exist in the construction litigation process today. The per diem Eichleay method is the most frequently utilized method. In this era of financial austerity, the armed forces are facing challenges to maintain operational readiness with fewer personnel and leaner operating capital due to shrinking defense budgets. One way to optimize these precious and limited resources is the efficient and effective use of construction funds and personnel in Naval Facilities Engineering Command (NAVFACENGCOM) construction administration. This report focuses on the commonly utilized Eichleay method of computation, as well as alternative methods currently utilized in today's construction industry. Research and analysis was conducted on current litigated construction claims resulting from disputes involving the Eichleay formula. Assumptions about the Eichleay formula method and its shortcomings have been provided. Emphasis on utilizing other methods of calculating these damages to the contractor as well as situation specific modifications of the Eichleay formula itself are also included. Conclusions were drawn from the data that identify significant strengths and weaknesses among these common place case situations. Recommendations were made for future possible improvements regarding the recognition and avoidance of potential claims by contractors. The target audience of this report is the junior construction project manager (Naval Civil Engineer Corps officer/civilian government personnel) and is to be utilized as a guide in the NAVFACENGCOM construction organization atmosphere for calculating legitimate contractor's unabsorbed home office overhead expense for a government caused suspension, delay, or disruption to the contract performance."],"dc:description.uri":["http://archive.org/details/theeichleayformu1094525891"],"dc:format.extent":["1 v. (various foliations)"],"dc:identifier.oclc":["ocn640605659"],"dc:identifier.uri":["https://hdl.handle.net/10945/25891"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["The Eichleay formula in Naval Facilities Engineering Command (NAVFACENGCOM) contracting."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Civil Engineering"],"thesis:institution_name":["Texas A&M"]},"updated_at":"2026-11-20T22:16:30Z"}