{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/26529"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/26529","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Estimating operating and support cost models for U.S. Naval ships","abstract":"With the end of the Cold War, the winds of military downsizing are blowing all over the world. Downsizing means fewer personnel, less facilities and smaller military budget. Therefore, understanding the relationships among factors responsible for force operating costs is extremely important when facing downsizing budgetary decisions. This study analyzes the U.S. Navy main combatant vessels' Operating and support costs. It seeks to reveal basic relationships of O and S costs through accounting and structural methods. The accounting oriented analysis found the VAMOSC-SHIPS and Jane's combined database to be relatively accurate with the exception of nuclear submarines and nuclear aircraft carriers. The structural analysis found that the overhaul cost should be analyzed separately due to essential differences used to calculate overhaul costs and a 1985 policy revision to ship overhaul. O and S cost relationships between factors other than overhauls were strong. Manpower was found to have the most dramatic effect on determining O and S costs","abstract_html":"With the end of the Cold War, the winds of military downsizing are blowing all over the world. Downsizing means fewer personnel, less facilities and smaller military budget. Therefore, understanding the relationships among factors responsible for force operating costs is extremely important when facing downsizing budgetary decisions. This study analyzes the U.S. Navy main combatant vessels&#x27; Operating and support costs. It seeks to reveal basic relationships of O and S costs through accounting and structural methods. The accounting oriented analysis found the VAMOSC-SHIPS and Jane&#x27;s combined database to be relatively accurate with the exception of nuclear submarines and nuclear aircraft carriers. The structural analysis found that the overhaul cost should be analyzed separately due to essential differences used to calculate overhaul costs and a 1985 policy revision to ship overhaul. O and S cost relationships between factors other than overhauls were strong. Manpower was found to have the most dramatic effect on determining O and S costs","abstract_has_math":false,"creators":["Ting, Chung-wu"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Management","school":"Naval Postgraduate School","contributors":[],"advisors":["Terasawa, Katsuaki","Hildebrandt, Gregory","Boger, Dan Calvin"],"committee_chairs":[],"committee_members":[],"year":1993,"date_issued":"1993-12","date_published":"1993-12","updated_at":"2026-11-26T00:15:18Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/26529","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/26529","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F26529","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F26529","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Terasawa, Katsuaki","Hildebrandt, Gregory","Boger, Dan Calvin"]},{"key":"dc:contributor.department","label":"Department","values":["Management"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:contributor.school","label":"School","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Ting, Chung-wu"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-01-23T22:00:12Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-01-23T22:00:12Z"]},{"key":"dc:date.issued","label":"Date","values":["1993-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/26529"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["With the end of the Cold War, the winds of military downsizing are blowing all over the world. Downsizing means fewer personnel, less facilities and smaller military budget. Therefore, understanding the relationships among factors responsible for force operating costs is extremely important when facing downsizing budgetary decisions. This study analyzes the U.S. Navy main combatant vessels' Operating and support costs. It seeks to reveal basic relationships of O and S costs through accounting and structural methods. The accounting oriented analysis found the VAMOSC-SHIPS and Jane's combined database to be relatively accurate with the exception of nuclear submarines and nuclear aircraft carriers. The structural analysis found that the overhaul cost should be analyzed separately due to essential differences used to calculate overhaul costs and a 1985 policy revision to ship overhaul. O and S cost relationships between factors other than overhauls were strong. Manpower was found to have the most dramatic effect on determining O and S costs"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/estimatingoperat1094526529"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["74 p."]},{"key":"dc:title","label":"Title","values":["Estimating operating and support cost models for U.S. Naval ships"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Colonel, The Republic of China Air Force"]}]}],"canonical_facts":{"dc:contributor.advisor":["Terasawa, Katsuaki","Hildebrandt, Gregory","Boger, Dan Calvin"],"dc:contributor.department":["Management"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:contributor.school":["Naval Postgraduate School"],"dc:creator":["Ting, Chung-wu"],"dc:date.accessioned":["2013-01-23T22:00:12Z"],"dc:date.available":["2013-01-23T22:00:12Z"],"dc:date.issued":["1993-12"],"dc:description.abstract":["With the end of the Cold War, the winds of military downsizing are blowing all over the world. Downsizing means fewer personnel, less facilities and smaller military budget. Therefore, understanding the relationships among factors responsible for force operating costs is extremely important when facing downsizing budgetary decisions. This study analyzes the U.S. Navy main combatant vessels' Operating and support costs. It seeks to reveal basic relationships of O and S costs through accounting and structural methods. The accounting oriented analysis found the VAMOSC-SHIPS and Jane's combined database to be relatively accurate with the exception of nuclear submarines and nuclear aircraft carriers. The structural analysis found that the overhaul cost should be analyzed separately due to essential differences used to calculate overhaul costs and a 1985 policy revision to ship overhaul. O and S cost relationships between factors other than overhauls were strong. Manpower was found to have the most dramatic effect on determining O and S costs"],"dc:description.uri":["http://archive.org/details/estimatingoperat1094526529"],"dc:format.extent":["74 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/26529"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:title":["Estimating operating and support cost models for U.S. Naval ships"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Colonel, The Republic of China Air Force"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:15:18Z"}