{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/26684"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/26684","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Parametric cost estimation for amphibious assault vehicle's life cycle cost","abstract":"This thesis investigates the need to predict life cycle cost in the most effective and efficient manner through the development of cost estimating relationships (CERs) using only performance input parameters. Utilizing statistical software especially designed for program managers, parametric cost estimating relationship module (PACER), CERs were developed and then evaluated for statistical soundness. The object of this study was to develop a means by which the program manager could estimate fairly accurately total life cycle costs. With this information in hand, the program manager could determine of a weapons system is affordable early in the acquisition process. The result of this study was the derivation of three predictive models that relate cost to required performance parameters. Based solely upon performance requirements, a relationship between cost and performance was established and their impact upon life cycle costs.","abstract_html":"This thesis investigates the need to predict life cycle cost in the most effective and efficient manner through the development of cost estimating relationships (CERs) using only performance input parameters. Utilizing statistical software especially designed for program managers, parametric cost estimating relationship module (PACER), CERs were developed and then evaluated for statistical soundness. The object of this study was to develop a means by which the program manager could estimate fairly accurately total life cycle costs. With this information in hand, the program manager could determine of a weapons system is affordable early in the acquisition process. The result of this study was the derivation of three predictive models that relate cost to required performance parameters. Based solely upon performance requirements, a relationship between cost and performance was established and their impact upon life cycle costs.","abstract_has_math":false,"creators":["Peters, Norman L."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["San Miguel, Joseph G."],"committee_chairs":[],"committee_members":["Sovereign, Michael G."],"year":1991,"date_issued":"1991-12","date_published":"1991-12","updated_at":"2026-11-21T22:47:48Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/26684","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/26684","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F26684","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F26684","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["San Miguel, Joseph G."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Sovereign, Michael G."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Peters, Norman L."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1991"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-01-23T22:04:03Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-01-23T22:04:03Z"]},{"key":"dc:date.issued","label":"Date","values":["1991-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Cost estimating relationships","Life cycle costs","Advanced Amphibious Assault Vehicle"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/26684"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis investigates the need to predict life cycle cost in the most effective and efficient manner through the development of cost estimating relationships (CERs) using only performance input parameters. Utilizing statistical software especially designed for program managers, parametric cost estimating relationship module (PACER), CERs were developed and then evaluated for statistical soundness. The object of this study was to develop a means by which the program manager could estimate fairly accurately total life cycle costs. With this information in hand, the program manager could determine of a weapons system is affordable early in the acquisition process. The result of this study was the derivation of three predictive models that relate cost to required performance parameters. Based solely upon performance requirements, a relationship between cost and performance was established and their impact upon life cycle costs."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/parametriccostes1094526684"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["122 p."]},{"key":"dc:title","label":"Title","values":["Parametric cost estimation for amphibious assault vehicle's life cycle cost"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["San Miguel, Joseph G."],"dc:contributor.committeemember":["Sovereign, Michael G."],"dc:contributor.department":["Department of Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Peters, Norman L."],"dc:date":["December 1991"],"dc:date.accessioned":["2013-01-23T22:04:03Z"],"dc:date.available":["2013-01-23T22:04:03Z"],"dc:date.issued":["1991-12"],"dc:description.abstract":["This thesis investigates the need to predict life cycle cost in the most effective and efficient manner through the development of cost estimating relationships (CERs) using only performance input parameters. Utilizing statistical software especially designed for program managers, parametric cost estimating relationship module (PACER), CERs were developed and then evaluated for statistical soundness. The object of this study was to develop a means by which the program manager could estimate fairly accurately total life cycle costs. With this information in hand, the program manager could determine of a weapons system is affordable early in the acquisition process. The result of this study was the derivation of three predictive models that relate cost to required performance parameters. Based solely upon performance requirements, a relationship between cost and performance was established and their impact upon life cycle costs."],"dc:description.uri":["http://archive.org/details/parametriccostes1094526684"],"dc:format.extent":["122 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/26684"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Cost estimating relationships","Life cycle costs","Advanced Amphibious Assault Vehicle"],"dc:title":["Parametric cost estimation for amphibious assault vehicle's life cycle cost"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Marine Corps"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:47:48Z"}