{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/26763"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/26763","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Simulating an isochronal scheduled inspection system for the P-3 Orion","abstract":"The purpose of this thesis is to explore potential challenges facing the implementation of an Isochronal Scheduled Inspection System (ISIS) for the United States Navy's P-3 Orion. Implementation of ISIS, which is based solely upon calendar time, has been proposed to replace the present system of scheduled inspections that are based upon both calendar time and flight hours. The United States Customs Service and the Royal Netherlands Navy have successfully fielded the ISIS program and demonstrated that the concept works when implemented on a small scale. It is not known however, how well the program might work when applied to a larger organization. This thesis obtains insights into potential troubles arising from implementation of the ISIS program by building and analyzing a simulation model. The model's output includes the number of times that changes must be applied to the planned schedule, the number of days aircraft are prematurely worked upon, and the number of days aircraft are delayed awaiting maintenance. The analysis provides a measure with which to gauge the difficulty of implementing the ISIS program in the U.S. Navy.","abstract_html":"The purpose of this thesis is to explore potential challenges facing the implementation of an Isochronal Scheduled Inspection System (ISIS) for the United States Navy&#x27;s P-3 Orion. Implementation of ISIS, which is based solely upon calendar time, has been proposed to replace the present system of scheduled inspections that are based upon both calendar time and flight hours. The United States Customs Service and the Royal Netherlands Navy have successfully fielded the ISIS program and demonstrated that the concept works when implemented on a small scale. It is not known however, how well the program might work when applied to a larger organization. This thesis obtains insights into potential troubles arising from implementation of the ISIS program by building and analyzing a simulation model. The model&#x27;s output includes the number of times that changes must be applied to the planned schedule, the number of days aircraft are prematurely worked upon, and the number of days aircraft are delayed awaiting maintenance. The analysis provides a measure with which to gauge the difficulty of implementing the ISIS program in the U.S. Navy.","abstract_has_math":false,"creators":["Jones, Jeffrey A."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Department of Operations Research","school":null,"contributors":[],"advisors":["Conner, George W."],"committee_chairs":[],"committee_members":["Buss, Arnold H."],"year":1998,"date_issued":"1998-09","date_published":"1998-09","updated_at":"2026-11-21T22:23:41Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/26763","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/26763","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F26763","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F26763","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Conner, George W."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Buss, Arnold H."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Operations Research"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Jones, Jeffrey A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["September 1998"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-01-23T22:05:28Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-01-23T22:05:28Z"]},{"key":"dc:date.issued","label":"Date","values":["1998-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Aviation","Scheduled maintenance","Simulation","Java","Isochronal"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/26763"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this thesis is to explore potential challenges facing the implementation of an Isochronal Scheduled Inspection System (ISIS) for the United States Navy's P-3 Orion. Implementation of ISIS, which is based solely upon calendar time, has been proposed to replace the present system of scheduled inspections that are based upon both calendar time and flight hours. The United States Customs Service and the Royal Netherlands Navy have successfully fielded the ISIS program and demonstrated that the concept works when implemented on a small scale. It is not known however, how well the program might work when applied to a larger organization. This thesis obtains insights into potential troubles arising from implementation of the ISIS program by building and analyzing a simulation model. The model's output includes the number of times that changes must be applied to the planned schedule, the number of days aircraft are prematurely worked upon, and the number of days aircraft are delayed awaiting maintenance. The analysis provides a measure with which to gauge the difficulty of implementing the ISIS program in the U.S. Navy."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/simulatingnisoch1094526763"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xviii, 57 p.."]},{"key":"dc:title","label":"Title","values":["Simulating an isochronal scheduled inspection system for the P-3 Orion"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Conner, George W."],"dc:contributor.committeemember":["Buss, Arnold H."],"dc:contributor.department":["Department of Operations Research"],"dc:contributor.other":["Naval Postgraduate School"],"dc:creator":["Jones, Jeffrey A."],"dc:date":["September 1998"],"dc:date.accessioned":["2013-01-23T22:05:28Z"],"dc:date.available":["2013-01-23T22:05:28Z"],"dc:date.issued":["1998-09"],"dc:description.abstract":["The purpose of this thesis is to explore potential challenges facing the implementation of an Isochronal Scheduled Inspection System (ISIS) for the United States Navy's P-3 Orion. Implementation of ISIS, which is based solely upon calendar time, has been proposed to replace the present system of scheduled inspections that are based upon both calendar time and flight hours. The United States Customs Service and the Royal Netherlands Navy have successfully fielded the ISIS program and demonstrated that the concept works when implemented on a small scale. It is not known however, how well the program might work when applied to a larger organization. This thesis obtains insights into potential troubles arising from implementation of the ISIS program by building and analyzing a simulation model. The model's output includes the number of times that changes must be applied to the planned schedule, the number of days aircraft are prematurely worked upon, and the number of days aircraft are delayed awaiting maintenance. The analysis provides a measure with which to gauge the difficulty of implementing the ISIS program in the U.S. Navy."],"dc:description.uri":["http://archive.org/details/simulatingnisoch1094526763"],"dc:format.extent":["xviii, 57 p.."],"dc:identifier.uri":["https://hdl.handle.net/10945/26763"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Aviation","Scheduled maintenance","Simulation","Java","Isochronal"],"dc:title":["Simulating an isochronal scheduled inspection system for the P-3 Orion"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:23:41Z"}