{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/2690"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/2690","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Business process reengineering in the inventory management to improve aircraft maintenance operations in the Indonesian Air Force","abstract":"The Indonesian Air Force has utilized computers in its administration as early as 1990. The computers, however, have not yet been optimized to support inventory management in aircraft maintenance operations, especially for the helicopter fleet. The processes for materials procurement to support the maintenance operations still rely heavily on the services of intermediaries'. Even though the Air Force has already adopted the Automatic Logistic Management System (ALMS), this has several weaknesses in supporting the material procurement processes. The objective of this study is to propose the implementation of the Material Requirement Planning (MRP) method to improve inventory management in the Air Force's helicopter fleet. It is hoped that by implementing the MRP, the Air Force can get the right materials in the right amount at the right time without imposing unnecessary costs by minimizing the roles of the intermediaries. The implementation of MRP, however, cannot be done without redesigning the business process in material acquisition and transforming it to an IT-enabled business process. Therefore, this study also discusses the Business Process Reengineering (BPR) concept in order to support the implementation of the MRP.","abstract_html":"The Indonesian Air Force has utilized computers in its administration as early as 1990. The computers, however, have not yet been optimized to support inventory management in aircraft maintenance operations, especially for the helicopter fleet. The processes for materials procurement to support the maintenance operations still rely heavily on the services of intermediaries&#x27;. Even though the Air Force has already adopted the Automatic Logistic Management System (ALMS), this has several weaknesses in supporting the material procurement processes. The objective of this study is to propose the implementation of the Material Requirement Planning (MRP) method to improve inventory management in the Air Force&#x27;s helicopter fleet. It is hoped that by implementing the MRP, the Air Force can get the right materials in the right amount at the right time without imposing unnecessary costs by minimizing the roles of the intermediaries. The implementation of MRP, however, cannot be done without redesigning the business process in material acquisition and transforming it to an IT-enabled business process. Therefore, this study also discusses the Business Process Reengineering (BPR) concept in order to support the implementation of the MRP.","abstract_has_math":false,"creators":["Susanto, Martinus Bram"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Cook, Glenn R.","Apte, Uday"],"committee_chairs":[],"committee_members":[],"year":2006,"date_issued":"2006-06","date_published":"2006-06","updated_at":"2026-11-19T06:28:29Z","subjects":[],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["70670395"],"render_values":[{"text":"70670395","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/2690","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/2690","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F2690","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F2690","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Cook, Glenn R.","Apte, Uday"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Susanto, Martinus Bram"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:35:57Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:35:57Z"]},{"key":"dc:date.issued","label":"Date","values":["2006-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Inventory Management","Business Process Reengineering","Business Transformation","Material Requirement Planning","Information Technology","Supply Chain"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["70670395"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/2690"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Indonesian Air Force has utilized computers in its administration as early as 1990. The computers, however, have not yet been optimized to support inventory management in aircraft maintenance operations, especially for the helicopter fleet. The processes for materials procurement to support the maintenance operations still rely heavily on the services of intermediaries'. Even though the Air Force has already adopted the Automatic Logistic Management System (ALMS), this has several weaknesses in supporting the material procurement processes. The objective of this study is to propose the implementation of the Material Requirement Planning (MRP) method to improve inventory management in the Air Force's helicopter fleet. It is hoped that by implementing the MRP, the Air Force can get the right materials in the right amount at the right time without imposing unnecessary costs by minimizing the roles of the intermediaries. The implementation of MRP, however, cannot be done without redesigning the business process in material acquisition and transforming it to an IT-enabled business process. Therefore, this study also discusses the Business Process Reengineering (BPR) concept in order to support the implementation of the MRP."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/businessprocessr109452690"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["103 p."]},{"key":"dc:title","label":"Title","values":["Business process reengineering in the inventory management to improve aircraft maintenance operations in the Indonesian Air Force"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, Indonesian Air Force"]}]}],"canonical_facts":{"dc:contributor.advisor":["Cook, Glenn R.","Apte, Uday"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Susanto, Martinus Bram"],"dc:date.accessioned":["2012-03-14T17:35:57Z"],"dc:date.available":["2012-03-14T17:35:57Z"],"dc:date.issued":["2006-06"],"dc:description.abstract":["The Indonesian Air Force has utilized computers in its administration as early as 1990. The computers, however, have not yet been optimized to support inventory management in aircraft maintenance operations, especially for the helicopter fleet. The processes for materials procurement to support the maintenance operations still rely heavily on the services of intermediaries'. Even though the Air Force has already adopted the Automatic Logistic Management System (ALMS), this has several weaknesses in supporting the material procurement processes. The objective of this study is to propose the implementation of the Material Requirement Planning (MRP) method to improve inventory management in the Air Force's helicopter fleet. It is hoped that by implementing the MRP, the Air Force can get the right materials in the right amount at the right time without imposing unnecessary costs by minimizing the roles of the intermediaries. The implementation of MRP, however, cannot be done without redesigning the business process in material acquisition and transforming it to an IT-enabled business process. Therefore, this study also discusses the Business Process Reengineering (BPR) concept in order to support the implementation of the MRP."],"dc:description.uri":["http://archive.org/details/businessprocessr109452690"],"dc:format.extent":["103 p."],"dc:identifier.oclc":["70670395"],"dc:identifier.uri":["https://hdl.handle.net/10945/2690"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:rights":["Copyright is reserved by the copyright owner.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["Inventory Management","Business Process Reengineering","Business Transformation","Material Requirement Planning","Information Technology","Supply Chain"],"dc:title":["Business process reengineering in the inventory management to improve aircraft maintenance operations in the Indonesian Air Force"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, Indonesian Air Force"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:28:29Z"}