{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/26956"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/26956","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Customer involvement in the design phase of construction.","abstract":"The principals and tools of Total Quality Management (TQM) have gradually made their way into the construction process as a whole. Various phases of the process, mostly large size projects, have experimented with TQM tools, team building, and customer involvement and have found success. Here, the intention is to present the reasons for this success and discuss how they may be applied to smaller projects which are found at the Public Works level of a Naval Base. (MM)","abstract_html":"The principals and tools of Total Quality Management (TQM) have gradually made their way into the construction process as a whole. Various phases of the process, mostly large size projects, have experimented with TQM tools, team building, and customer involvement and have found success. Here, the intention is to present the reasons for this success and discuss how they may be applied to smaller projects which are found at the Public Works level of a Naval Base. (MM)","abstract_has_math":false,"creators":["Tryon, Thomas B."],"institution":"Maryland University at College Park","degree_name":"M.S. in Civil Engineering","degree_level":"Masters","degree_discipline":"Civil Engineering","degree_department":"Civil Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1995,"date_issued":"1995","date_published":"1995","updated_at":"2026-11-19T06:28:29Z","subjects":["CONSTRUCTION"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640935288"],"render_values":[{"text":"ocn640935288","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/26956","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/26956","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F26956","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F26956","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.department","label":"Department","values":["Civil Engineering"]},{"key":"dc:creator","label":"Author","values":["Tryon, Thomas B."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-01-23T22:08:15Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-01-23T22:08:15Z"]},{"key":"dc:date.issued","label":"Date","values":["1995"]},{"key":"dc:publisher","label":"Institution","values":["Maryland University at College Park"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Civil Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Maryland University at College Park"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["CONSTRUCTION"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640935288"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/26956"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The principals and tools of Total Quality Management (TQM) have gradually made their way into the construction process as a whole. Various phases of the process, mostly large size projects, have experimented with TQM tools, team building, and customer involvement and have found success. Here, the intention is to present the reasons for this success and discuss how they may be applied to smaller projects which are found at the Public Works level of a Naval Base. (MM)"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/customerinvolvem1094526956"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["19 p."]},{"key":"dc:title","label":"Title","values":["Customer involvement in the design phase of construction."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.department":["Civil Engineering"],"dc:creator":["Tryon, Thomas B."],"dc:date.accessioned":["2013-01-23T22:08:15Z"],"dc:date.available":["2013-01-23T22:08:15Z"],"dc:date.issued":["1995"],"dc:description.abstract":["The principals and tools of Total Quality Management (TQM) have gradually made their way into the construction process as a whole. Various phases of the process, mostly large size projects, have experimented with TQM tools, team building, and customer involvement and have found success. Here, the intention is to present the reasons for this success and discuss how they may be applied to smaller projects which are found at the Public Works level of a Naval Base. (MM)"],"dc:description.uri":["http://archive.org/details/customerinvolvem1094526956"],"dc:format.extent":["19 p."],"dc:identifier.oclc":["ocn640935288"],"dc:identifier.uri":["https://hdl.handle.net/10945/26956"],"dc:publisher":["Maryland University at College Park"],"dc:subject.lcsh":["CONSTRUCTION"],"dc:title":["Customer involvement in the design phase of construction."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Civil Engineering"],"thesis:institution_name":["Maryland University at College Park"]},"updated_at":"2026-11-19T06:28:29Z"}