{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/27054"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/27054","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Financial condition of Government contractors and control of production costs in the procurement of major DOD aircraft weapon systems.","abstract":"The thesis identifies conditions associated with production cost overruns or underruns on major weapon systems. The analysis used U.S. military fighter/attack aircraft. First, relying on techniques developed in prior studies, measures of the technology embodied in aircraft and the cost of producing those aircraft were developed. Next, relationships between technology and cost were examined to create measures of \"should costs\", for each aircraft based on technology in the aircraft. These estimates of \"should costs\" were compared to actual costs to determine situations of cost overruns and underruns. Analyses of financial ratios of each aircraft's prime contractor were used to determine if financial condition could explain the cost overruns or underruns experienced during production, by using several forms of regression analysis. This yielded models relating financial ratios to cost overruns or underruns. Major findings indicate that financial condition does partially explain production cost overruns and underruns, but the relationship is small.","abstract_html":"The thesis identifies conditions associated with production cost overruns or underruns on major weapon systems. The analysis used U.S. military fighter/attack aircraft. First, relying on techniques developed in prior studies, measures of the technology embodied in aircraft and the cost of producing those aircraft were developed. Next, relationships between technology and cost were examined to create measures of &quot;should costs&quot;, for each aircraft based on technology in the aircraft. These estimates of &quot;should costs&quot; were compared to actual costs to determine situations of cost overruns and underruns. Analyses of financial ratios of each aircraft&#x27;s prime contractor were used to determine if financial condition could explain the cost overruns or underruns experienced during production, by using several forms of regression analysis. This yielded models relating financial ratios to cost overruns or underruns. Major findings indicate that financial condition does partially explain production cost overruns and underruns, but the relationship is small.","abstract_has_math":false,"creators":["Hicky, John Stratton."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Moses, O. Douglas"],"committee_chairs":[],"committee_members":["Matthews, Danny G."],"year":1989,"date_issued":"1989-06","date_published":"1989-06","updated_at":"2026-11-26T00:13:31Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/27054","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/27054","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F27054","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F27054","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Moses, O. Douglas"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Matthews, Danny G."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Hicky, John Stratton."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1989"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-01-23T22:09:01Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-01-23T22:09:01Z"]},{"key":"dc:date.issued","label":"Date","values":["1989-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["production costs","technology and production","financial ratio analysis","weapon systems acquisition","technology measurement"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/27054"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The thesis identifies conditions associated with production cost overruns or underruns on major weapon systems. The analysis used U.S. military fighter/attack aircraft. First, relying on techniques developed in prior studies, measures of the technology embodied in aircraft and the cost of producing those aircraft were developed. Next, relationships between technology and cost were examined to create measures of \"should costs\", for each aircraft based on technology in the aircraft. These estimates of \"should costs\" were compared to actual costs to determine situations of cost overruns and underruns. Analyses of financial ratios of each aircraft's prime contractor were used to determine if financial condition could explain the cost overruns or underruns experienced during production, by using several forms of regression analysis. This yielded models relating financial ratios to cost overruns or underruns. Major findings indicate that financial condition does partially explain production cost overruns and underruns, but the relationship is small."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/financialconditi1094527054"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["102 p."]},{"key":"dc:title","label":"Title","values":["Financial condition of Government contractors and control of production costs in the procurement of major DOD aircraft weapon systems."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Moses, O. Douglas"],"dc:contributor.committeemember":["Matthews, Danny G."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Hicky, John Stratton."],"dc:date":["June 1989"],"dc:date.accessioned":["2013-01-23T22:09:01Z"],"dc:date.available":["2013-01-23T22:09:01Z"],"dc:date.issued":["1989-06"],"dc:description.abstract":["The thesis identifies conditions associated with production cost overruns or underruns on major weapon systems. The analysis used U.S. military fighter/attack aircraft. First, relying on techniques developed in prior studies, measures of the technology embodied in aircraft and the cost of producing those aircraft were developed. Next, relationships between technology and cost were examined to create measures of \"should costs\", for each aircraft based on technology in the aircraft. These estimates of \"should costs\" were compared to actual costs to determine situations of cost overruns and underruns. Analyses of financial ratios of each aircraft's prime contractor were used to determine if financial condition could explain the cost overruns or underruns experienced during production, by using several forms of regression analysis. This yielded models relating financial ratios to cost overruns or underruns. Major findings indicate that financial condition does partially explain production cost overruns and underruns, but the relationship is small."],"dc:description.uri":["http://archive.org/details/financialconditi1094527054"],"dc:format.extent":["102 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/27054"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["production costs","technology and production","financial ratio analysis","weapon systems acquisition","technology measurement"],"dc:title":["Financial condition of Government contractors and control of production costs in the procurement of major DOD aircraft weapon systems."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:13:31Z"}