{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/27185"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/27185","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Operations and maintenance cost for new major U.S. Coast Guard platforms: projected versus actual costs.","abstract":"This thesis examines the accuracy of the operations and maintenance budget models developed for new U.S. Coast Guard cutters and aircraft as part of life cycle cost analysis prior to acquisition. The HU-25A medium range search aircraft and HH-65A short range recovery aircraft were used along with the 270 foot medium endurance cutter and the 110 foot patrol boat. A regression method of estimating these costs using historical costs was explored as an alternative to the laborious task of identifying each major cost element. The results indicated that the budget models are poor predictors and that parametric methods may provide more accuracy. Additional research in developing cost estimating relationships for this purpose is needed.","abstract_html":"This thesis examines the accuracy of the operations and maintenance budget models developed for new U.S. Coast Guard cutters and aircraft as part of life cycle cost analysis prior to acquisition. The HU-25A medium range search aircraft and HH-65A short range recovery aircraft were used along with the 270 foot medium endurance cutter and the 110 foot patrol boat. A regression method of estimating these costs using historical costs was explored as an alternative to the laborious task of identifying each major cost element. The results indicated that the budget models are poor predictors and that parametric methods may provide more accuracy. Additional research in developing cost estimating relationships for this purpose is needed.","abstract_has_math":false,"creators":["Frost, John Ewen"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Fremgen, James M."],"committee_chairs":[],"committee_members":["Weitzman, Ronald A."],"year":1989,"date_issued":"1989-06","date_published":"1989-06","updated_at":"2026-11-24T23:48:53Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/27185","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/27185","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F27185","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F27185","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Fremgen, James M."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Weitzman, Ronald A."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Frost, John Ewen"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1989"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-01-23T22:10:10Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-01-23T22:10:10Z"]},{"key":"dc:date.issued","label":"Date","values":["1989-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["operations and maintenance costs","U.S. Coast Guard","aircraft","cutters","regression analysis","life cycle costs","budget models"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/27185"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis examines the accuracy of the operations and maintenance budget models developed for new U.S. Coast Guard cutters and aircraft as part of life cycle cost analysis prior to acquisition. The HU-25A medium range search aircraft and HH-65A short range recovery aircraft were used along with the 270 foot medium endurance cutter and the 110 foot patrol boat. A regression method of estimating these costs using historical costs was explored as an alternative to the laborious task of identifying each major cost element. The results indicated that the budget models are poor predictors and that parametric methods may provide more accuracy. Additional research in developing cost estimating relationships for this purpose is needed."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/operationsndmain1094527185"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["175 p."]},{"key":"dc:title","label":"Title","values":["Operations and maintenance cost for new major U.S. Coast Guard platforms: projected versus actual costs."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Coast Guard"]}]}],"canonical_facts":{"dc:contributor.advisor":["Fremgen, James M."],"dc:contributor.committeemember":["Weitzman, Ronald A."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Frost, John Ewen"],"dc:date":["June 1989"],"dc:date.accessioned":["2013-01-23T22:10:10Z"],"dc:date.available":["2013-01-23T22:10:10Z"],"dc:date.issued":["1989-06"],"dc:description.abstract":["This thesis examines the accuracy of the operations and maintenance budget models developed for new U.S. Coast Guard cutters and aircraft as part of life cycle cost analysis prior to acquisition. The HU-25A medium range search aircraft and HH-65A short range recovery aircraft were used along with the 270 foot medium endurance cutter and the 110 foot patrol boat. A regression method of estimating these costs using historical costs was explored as an alternative to the laborious task of identifying each major cost element. The results indicated that the budget models are poor predictors and that parametric methods may provide more accuracy. Additional research in developing cost estimating relationships for this purpose is needed."],"dc:description.uri":["http://archive.org/details/operationsndmain1094527185"],"dc:format.extent":["175 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/27185"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["operations and maintenance costs","U.S. Coast Guard","aircraft","cutters","regression analysis","life cycle costs","budget models"],"dc:title":["Operations and maintenance cost for new major U.S. Coast Guard platforms: projected versus actual costs."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Coast Guard"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-24T23:48:53Z"}