{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/27238"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/27238","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A regression analysis for unit costing at NAVSUP activities","abstract":"Unit costing is one of the important issues being faced by the Department of Defense (DoD). the ability to predict the cost required to generate a productive unit output is necessary because of current guidelines regarding the management of limited resources available to the DoD. This thesis investigated the feasibility of developing such forecasts for the Naval Supply Systems Command (NAVSUP) using regression analysis. The analysis met with little success, most probably because the limited available data has only been recorded over the last 21 months due to the newness of the requirements of unit costing. The one positive result of the analysis was the discovery that some of the cost centers analyzed are affected by seasonality. In addition, the data for the last nine months appears to be better than the previous 12. This may be due to cost centers becoming accustomed to monitoring costs and outputs more precisely than has ever been done before.","abstract_html":"Unit costing is one of the important issues being faced by the Department of Defense (DoD). the ability to predict the cost required to generate a productive unit output is necessary because of current guidelines regarding the management of limited resources available to the DoD. This thesis investigated the feasibility of developing such forecasts for the Naval Supply Systems Command (NAVSUP) using regression analysis. The analysis met with little success, most probably because the limited available data has only been recorded over the last 21 months due to the newness of the requirements of unit costing. The one positive result of the analysis was the discovery that some of the cost centers analyzed are affected by seasonality. In addition, the data for the last nine months appears to be better than the previous 12. This may be due to cost centers becoming accustomed to monitoring costs and outputs more precisely than has ever been done before.","abstract_has_math":false,"creators":["Terry, Glenn Edward"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["McMasters, Alan W.","Barr, Donald R."],"committee_chairs":[],"committee_members":[],"year":1991,"date_issued":"1991-12","date_published":"1991-12","updated_at":"2026-11-21T22:49:44Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/27238","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/27238","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F27238","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["McMasters, Alan W.","Barr, Donald R."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Terry, Glenn Edward"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1991"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-01-23T22:10:34Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-01-23T22:10:34Z"]},{"key":"dc:date.issued","label":"Date","values":["1991-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Regression analysis","Unit costing","NAVSUP PURS"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/27238"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Unit costing is one of the important issues being faced by the Department of Defense (DoD). the ability to predict the cost required to generate a productive unit output is necessary because of current guidelines regarding the management of limited resources available to the DoD. This thesis investigated the feasibility of developing such forecasts for the Naval Supply Systems Command (NAVSUP) using regression analysis. The analysis met with little success, most probably because the limited available data has only been recorded over the last 21 months due to the newness of the requirements of unit costing. The one positive result of the analysis was the discovery that some of the cost centers analyzed are affected by seasonality. In addition, the data for the last nine months appears to be better than the previous 12. This may be due to cost centers becoming accustomed to monitoring costs and outputs more precisely than has ever been done before."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/aregressionnalys1094527238"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["133 p."]},{"key":"dc:title","label":"Title","values":["A regression analysis for unit costing at NAVSUP activities"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["McMasters, Alan W.","Barr, Donald R."],"dc:contributor.department":["Department of Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Terry, Glenn Edward"],"dc:date":["December 1991"],"dc:date.accessioned":["2013-01-23T22:10:34Z"],"dc:date.available":["2013-01-23T22:10:34Z"],"dc:date.issued":["1991-12"],"dc:description.abstract":["Unit costing is one of the important issues being faced by the Department of Defense (DoD). the ability to predict the cost required to generate a productive unit output is necessary because of current guidelines regarding the management of limited resources available to the DoD. This thesis investigated the feasibility of developing such forecasts for the Naval Supply Systems Command (NAVSUP) using regression analysis. The analysis met with little success, most probably because the limited available data has only been recorded over the last 21 months due to the newness of the requirements of unit costing. The one positive result of the analysis was the discovery that some of the cost centers analyzed are affected by seasonality. In addition, the data for the last nine months appears to be better than the previous 12. This may be due to cost centers becoming accustomed to monitoring costs and outputs more precisely than has ever been done before."],"dc:description.uri":["http://archive.org/details/aregressionnalys1094527238"],"dc:format.extent":["133 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/27238"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Regression analysis","Unit costing","NAVSUP PURS"],"dc:title":["A regression analysis for unit costing at NAVSUP activities"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:49:44Z"}