{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/27653"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/27653","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The effect of extension in system technology on contractor costs and production schedules during the procurement of air-launched tactical munitions","abstract":"This thesis investigates relationships between extensions in technology and both cost and schedule slippages in the development and production phases of weapons system acquisition. The primary objective is to determine if the amount of technology embodied in a given weapons system can be employed to predict a Department of Defense (DoD) contractor's performance in meeting cost and schedule targets. The analysis used a sample of 15 U.S. military tactical air-launched munitions systems. It begins with a review of the literature regarding technology measurement and its connection to cost and schedule outcomes. Next, measures of technological progress are developed and displayed. Third, the process of creating cost growth and schedule slippage measures are discussed. The relationships between technological complexity and cost and schedule outcomes are then empirically tested. Major findings indicate that measures of extension in technology are worthwhile for explaining production and total program cost growth.","abstract_html":"This thesis investigates relationships between extensions in technology and both cost and schedule slippages in the development and production phases of weapons system acquisition. The primary objective is to determine if the amount of technology embodied in a given weapons system can be employed to predict a Department of Defense (DoD) contractor&#x27;s performance in meeting cost and schedule targets. The analysis used a sample of 15 U.S. military tactical air-launched munitions systems. It begins with a review of the literature regarding technology measurement and its connection to cost and schedule outcomes. Next, measures of technological progress are developed and displayed. Third, the process of creating cost growth and schedule slippage measures are discussed. The relationships between technological complexity and cost and schedule outcomes are then empirically tested. Major findings indicate that measures of extension in technology are worthwhile for explaining production and total program cost growth.","abstract_has_math":false,"creators":["Ritchie, Robert J."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["Moses, O. Douglas"],"committee_chairs":[],"committee_members":["Liao, Shu S."],"year":1990,"date_issued":"1990-12","date_published":"1990-12","updated_at":"2026-11-19T06:31:09Z","subjects":["Weapons systems","Logistics","Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/27653","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/27653","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F27653","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Moses, O. Douglas"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Liao, Shu S."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:creator","label":"Author","values":["Ritchie, Robert J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1990"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-02-15T23:11:03Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-02-15T23:11:03Z"]},{"key":"dc:date.issued","label":"Date","values":["1990-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Technology measurement","technology and cost","cost growth","schedule growth","contractor costs"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Weapons systems","Logistics","Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/27653"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis investigates relationships between extensions in technology and both cost and schedule slippages in the development and production phases of weapons system acquisition. The primary objective is to determine if the amount of technology embodied in a given weapons system can be employed to predict a Department of Defense (DoD) contractor's performance in meeting cost and schedule targets. The analysis used a sample of 15 U.S. military tactical air-launched munitions systems. It begins with a review of the literature regarding technology measurement and its connection to cost and schedule outcomes. Next, measures of technological progress are developed and displayed. Third, the process of creating cost growth and schedule slippage measures are discussed. The relationships between technological complexity and cost and schedule outcomes are then empirically tested. Major findings indicate that measures of extension in technology are worthwhile for explaining production and total program cost growth."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/theeffectofexten1094527653"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["viii, 78 p."]},{"key":"dc:title","label":"Title","values":["The effect of extension in system technology on contractor costs and production schedules during the procurement of air-launched tactical munitions"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Moses, O. Douglas"],"dc:contributor.committeemember":["Liao, Shu S."],"dc:contributor.department":["Department of Administrative Sciences"],"dc:creator":["Ritchie, Robert J."],"dc:date":["December 1990"],"dc:date.accessioned":["2013-02-15T23:11:03Z"],"dc:date.available":["2013-02-15T23:11:03Z"],"dc:date.issued":["1990-12"],"dc:description.abstract":["This thesis investigates relationships between extensions in technology and both cost and schedule slippages in the development and production phases of weapons system acquisition. The primary objective is to determine if the amount of technology embodied in a given weapons system can be employed to predict a Department of Defense (DoD) contractor's performance in meeting cost and schedule targets. The analysis used a sample of 15 U.S. military tactical air-launched munitions systems. It begins with a review of the literature regarding technology measurement and its connection to cost and schedule outcomes. Next, measures of technological progress are developed and displayed. Third, the process of creating cost growth and schedule slippage measures are discussed. The relationships between technological complexity and cost and schedule outcomes are then empirically tested. Major findings indicate that measures of extension in technology are worthwhile for explaining production and total program cost growth."],"dc:description.uri":["http://archive.org/details/theeffectofexten1094527653"],"dc:format.extent":["viii, 78 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/27653"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Technology measurement","technology and cost","cost growth","schedule growth","contractor costs"],"dc:subject.lcsh":["Weapons systems","Logistics","Management"],"dc:title":["The effect of extension in system technology on contractor costs and production schedules during the procurement of air-launched tactical munitions"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:31:09Z"}