{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/27705"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/27705","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Cost and schedule growth during weapon system acquisition : an investigation of the impact of selected economic and political factors","abstract":"The primary objective of this study is to document relationships between two weapon system program outcomes, cost and schedule growth, and aspects of the political and economic climate during system development. The data sample selected for study was aerospace industry-related weapon system programs. The central methodology used in the analysis included: (1) The identification of factors reflecting the economic and political conditions expected to be associated with program outcomes. (2) The creation of measures of cost and schedule growth. (3) Statistical analysis was conducted to test the hypothesized relationships between program outcomes and explanatory factors. The analysis was conducted to separately explain three program outcomes: development cost growth, development schedule growth, and total program cost growth. General conclusions from this study are that significant relationships to exist between cost and schedule growth and specific political and economic explanatory factors.","abstract_html":"The primary objective of this study is to document relationships between two weapon system program outcomes, cost and schedule growth, and aspects of the political and economic climate during system development. The data sample selected for study was aerospace industry-related weapon system programs. The central methodology used in the analysis included: (1) The identification of factors reflecting the economic and political conditions expected to be associated with program outcomes. (2) The creation of measures of cost and schedule growth. (3) Statistical analysis was conducted to test the hypothesized relationships between program outcomes and explanatory factors. The analysis was conducted to separately explain three program outcomes: development cost growth, development schedule growth, and total program cost growth. General conclusions from this study are that significant relationships to exist between cost and schedule growth and specific political and economic explanatory factors.","abstract_has_math":false,"creators":["Wolf, Jeffrey Guy."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["Moses, Douglas O."],"committee_chairs":[],"committee_members":["Liao, Shu S."],"year":1990,"date_issued":"1990-12","date_published":"1990-12","updated_at":"2026-11-19T06:31:09Z","subjects":["Management","Cost","Political science."],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/27705","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/27705","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F27705","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Moses, Douglas O."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Liao, Shu S."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:creator","label":"Author","values":["Wolf, Jeffrey Guy."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1990"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-02-15T23:11:27Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-02-15T23:11:27Z"]},{"key":"dc:date.issued","label":"Date","values":["1990-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Development Cost Growth","Development Schedule Growth","Total Program Cost Growth"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management","Cost","Political science."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/27705"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The primary objective of this study is to document relationships between two weapon system program outcomes, cost and schedule growth, and aspects of the political and economic climate during system development. The data sample selected for study was aerospace industry-related weapon system programs. The central methodology used in the analysis included: (1) The identification of factors reflecting the economic and political conditions expected to be associated with program outcomes. (2) The creation of measures of cost and schedule growth. (3) Statistical analysis was conducted to test the hypothesized relationships between program outcomes and explanatory factors. The analysis was conducted to separately explain three program outcomes: development cost growth, development schedule growth, and total program cost growth. General conclusions from this study are that significant relationships to exist between cost and schedule growth and specific political and economic explanatory factors."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/costndschedulegr1094527705"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["vi, 72 p."]},{"key":"dc:title","label":"Title","values":["Cost and schedule growth during weapon system acquisition : an investigation of the impact of selected economic and political factors"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commandeer, United States Naval Reserve"]}]}],"canonical_facts":{"dc:contributor.advisor":["Moses, Douglas O."],"dc:contributor.committeemember":["Liao, Shu S."],"dc:contributor.department":["Department of Administrative Sciences"],"dc:creator":["Wolf, Jeffrey Guy."],"dc:date":["December 1990"],"dc:date.accessioned":["2013-02-15T23:11:27Z"],"dc:date.available":["2013-02-15T23:11:27Z"],"dc:date.issued":["1990-12"],"dc:description.abstract":["The primary objective of this study is to document relationships between two weapon system program outcomes, cost and schedule growth, and aspects of the political and economic climate during system development. The data sample selected for study was aerospace industry-related weapon system programs. The central methodology used in the analysis included: (1) The identification of factors reflecting the economic and political conditions expected to be associated with program outcomes. (2) The creation of measures of cost and schedule growth. (3) Statistical analysis was conducted to test the hypothesized relationships between program outcomes and explanatory factors. The analysis was conducted to separately explain three program outcomes: development cost growth, development schedule growth, and total program cost growth. General conclusions from this study are that significant relationships to exist between cost and schedule growth and specific political and economic explanatory factors."],"dc:description.uri":["http://archive.org/details/costndschedulegr1094527705"],"dc:format.extent":["vi, 72 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/27705"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Development Cost Growth","Development Schedule Growth","Total Program Cost Growth"],"dc:subject.lcsh":["Management","Cost","Political science."],"dc:title":["Cost and schedule growth during weapon system acquisition : an investigation of the impact of selected economic and political factors"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commandeer, United States Naval Reserve"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:31:09Z"}