{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/27731"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/27731","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analysis of setup time reductions at NADEP, North Island, utilizing the SMED approach (Single-Minute-Exchange-of-Die)","abstract":"This thesis is an analysis of setup time considerations currently employed by the Power Plant Facility at the Naval Aviation Depot, North Island. The system is analyzed within a production context, citing present procedures that adversely affect lead time. To reduce lead time variability, reduction of setup time is targeted. This thesis examines the potential benefits available to the Power Plant Facility by applying Single-Minute-Exchange-of-Die (SMED) to reduce setup times. SMED's conceptual stages are first examined and then related to the Power Plant Facility to illustrate the applicability of SMED to a repairrebuild environment. Recommendations are made to reduce setup times in two work centers.","abstract_html":"This thesis is an analysis of setup time considerations currently employed by the Power Plant Facility at the Naval Aviation Depot, North Island. The system is analyzed within a production context, citing present procedures that adversely affect lead time. To reduce lead time variability, reduction of setup time is targeted. This thesis examines the potential benefits available to the Power Plant Facility by applying Single-Minute-Exchange-of-Die (SMED) to reduce setup times. SMED&#x27;s conceptual stages are first examined and then related to the Power Plant Facility to illustrate the applicability of SMED to a repairrebuild environment. Recommendations are made to reduce setup times in two work centers.","abstract_has_math":false,"creators":["Combs, Michael L."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["Trietsch, Dan"],"committee_chairs":[],"committee_members":["McMasters, Alan W."],"year":1990,"date_issued":"1990-06","date_published":"1990-06","updated_at":"2026-11-19T06:31:09Z","subjects":["Production management."],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/27731","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/27731","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F27731","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F27731","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Trietsch, Dan"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["McMasters, Alan W."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:creator","label":"Author","values":["Combs, Michael L."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1990"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-02-15T23:11:35Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-02-15T23:11:35Z"]},{"key":"dc:date.issued","label":"Date","values":["1990-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["SMED","production management","setup time","NADEP"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Production management."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/27731"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis is an analysis of setup time considerations currently employed by the Power Plant Facility at the Naval Aviation Depot, North Island. The system is analyzed within a production context, citing present procedures that adversely affect lead time. To reduce lead time variability, reduction of setup time is targeted. This thesis examines the potential benefits available to the Power Plant Facility by applying Single-Minute-Exchange-of-Die (SMED) to reduce setup times. SMED's conceptual stages are first examined and then related to the Power Plant Facility to illustrate the applicability of SMED to a repairrebuild environment. Recommendations are made to reduce setup times in two work centers."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analysisofsetupt1094527731"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["vii, 97 p. ill."]},{"key":"dc:title","label":"Title","values":["Analysis of setup time reductions at NADEP, North Island, utilizing the SMED approach (Single-Minute-Exchange-of-Die)"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Trietsch, Dan"],"dc:contributor.committeemember":["McMasters, Alan W."],"dc:contributor.department":["Department of Administrative Sciences"],"dc:creator":["Combs, Michael L."],"dc:date":["June 1990"],"dc:date.accessioned":["2013-02-15T23:11:35Z"],"dc:date.available":["2013-02-15T23:11:35Z"],"dc:date.issued":["1990-06"],"dc:description.abstract":["This thesis is an analysis of setup time considerations currently employed by the Power Plant Facility at the Naval Aviation Depot, North Island. The system is analyzed within a production context, citing present procedures that adversely affect lead time. To reduce lead time variability, reduction of setup time is targeted. This thesis examines the potential benefits available to the Power Plant Facility by applying Single-Minute-Exchange-of-Die (SMED) to reduce setup times. SMED's conceptual stages are first examined and then related to the Power Plant Facility to illustrate the applicability of SMED to a repairrebuild environment. Recommendations are made to reduce setup times in two work centers."],"dc:description.uri":["http://archive.org/details/analysisofsetupt1094527731"],"dc:format.extent":["vii, 97 p. ill."],"dc:identifier.uri":["https://hdl.handle.net/10945/27731"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["SMED","production management","setup time","NADEP"],"dc:subject.lcsh":["Production management."],"dc:title":["Analysis of setup time reductions at NADEP, North Island, utilizing the SMED approach (Single-Minute-Exchange-of-Die)"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Marine Corps"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:31:09Z"}