{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/27920"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/27920","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Optimizing project selection at the Department Of Public Works, Presidio of Monterey","abstract":"Large organizations suffer from the problem of insufficient resources to complete all project requests submitted throughout the year. With the high volume of project requests received and the limited resources available, picking those projects to fund that return the highest value to the organization can be a daunting task. The purpose of this research is to help management make an optimal decision, and determine whether the introduction of an Excel-based optimization model would benefit an organization in its selection process. This research focuses on the project selection process for the Department of Public Works for the Presidio of Monterey Army instillations in the Monterey area. The results from the current fiscal years selection process are compared with the results from the optimization model. This demonstrates how analytical tools, specifically an optimization model, can add value to an organization by increasing the number of projects selected. One of the conclusions of this thesis is that for the model to properly reflect the values of the organization, a different weighting system would be needed. Therefore, this research recommends that the optimization model be used, but only as a non-biased opinion on which projects should be selected.","abstract_html":"Large organizations suffer from the problem of insufficient resources to complete all project requests submitted throughout the year. With the high volume of project requests received and the limited resources available, picking those projects to fund that return the highest value to the organization can be a daunting task. The purpose of this research is to help management make an optimal decision, and determine whether the introduction of an Excel-based optimization model would benefit an organization in its selection process. This research focuses on the project selection process for the Department of Public Works for the Presidio of Monterey Army instillations in the Monterey area. The results from the current fiscal years selection process are compared with the results from the optimization model. This demonstrates how analytical tools, specifically an optimization model, can add value to an organization by increasing the number of projects selected. One of the conclusions of this thesis is that for the model to properly reflect the values of the organization, a different weighting system would be needed. Therefore, this research recommends that the optimization model be used, but only as a non-biased opinion on which projects should be selected.","abstract_has_math":false,"creators":["Whitfield, Jesse"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Apte, Aruna","Apte, Uday"],"committee_chairs":[],"committee_members":[],"year":2012,"date_issued":"2012-12","date_published":"2012-12","updated_at":"2026-11-19T06:31:09Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/27920","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/27920","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F27920","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F27920","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Apte, Aruna","Apte, Uday"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Whitfield, Jesse"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-02-15T23:14:06Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-02-15T23:14:06Z"]},{"key":"dc:date.issued","label":"Date","values":["2012-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Knapsack","Excel","Optimization Model","DPW","POM"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/27920"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Large organizations suffer from the problem of insufficient resources to complete all project requests submitted throughout the year. With the high volume of project requests received and the limited resources available, picking those projects to fund that return the highest value to the organization can be a daunting task. The purpose of this research is to help management make an optimal decision, and determine whether the introduction of an Excel-based optimization model would benefit an organization in its selection process. This research focuses on the project selection process for the Department of Public Works for the Presidio of Monterey Army instillations in the Monterey area. The results from the current fiscal years selection process are compared with the results from the optimization model. This demonstrates how analytical tools, specifically an optimization model, can add value to an organization by increasing the number of projects selected. One of the conclusions of this thesis is that for the model to properly reflect the values of the organization, a different weighting system would be needed. Therefore, this research recommends that the optimization model be used, but only as a non-biased opinion on which projects should be selected."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/optimizingprojec1094527920"]},{"key":"dc:title","label":"Title","values":["Optimizing project selection at the Department Of Public Works, Presidio of Monterey"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Apte, Aruna","Apte, Uday"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Whitfield, Jesse"],"dc:date.accessioned":["2013-02-15T23:14:06Z"],"dc:date.available":["2013-02-15T23:14:06Z"],"dc:date.issued":["2012-12"],"dc:description.abstract":["Large organizations suffer from the problem of insufficient resources to complete all project requests submitted throughout the year. With the high volume of project requests received and the limited resources available, picking those projects to fund that return the highest value to the organization can be a daunting task. The purpose of this research is to help management make an optimal decision, and determine whether the introduction of an Excel-based optimization model would benefit an organization in its selection process. This research focuses on the project selection process for the Department of Public Works for the Presidio of Monterey Army instillations in the Monterey area. The results from the current fiscal years selection process are compared with the results from the optimization model. This demonstrates how analytical tools, specifically an optimization model, can add value to an organization by increasing the number of projects selected. One of the conclusions of this thesis is that for the model to properly reflect the values of the organization, a different weighting system would be needed. Therefore, this research recommends that the optimization model be used, but only as a non-biased opinion on which projects should be selected."],"dc:description.uri":["http://archive.org/details/optimizingprojec1094527920"],"dc:identifier.uri":["https://hdl.handle.net/10945/27920"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Knapsack","Excel","Optimization Model","DPW","POM"],"dc:title":["Optimizing project selection at the Department Of Public Works, Presidio of Monterey"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"]},"updated_at":"2026-11-19T06:31:09Z"}