{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/27941"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/27941","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Alternative dispute resolution for U.S. Navy construction contracts","abstract":"This paper will examine the reasons the private construction industry has begun to use ADR to solve its litigation problems. It will then look at the formal claims process a contractor's claim must follow within the Department of Defense and NAVFACENGCOM to reach final resolution through the courts. Next the paper will examine the experience NAVFACENGCOM and the Army Corps of Engineers have had with ADR. In addition it will examine some of the reasons the Army Corps of Engineers has learned as to why the private construction industry has been reticent to join in the ADR process. Finally it will make recommendations as to how the NAVY can improve its ADR program and encourage its construction contractors to join the process.","abstract_html":"This paper will examine the reasons the private construction industry has begun to use ADR to solve its litigation problems. It will then look at the formal claims process a contractor&#x27;s claim must follow within the Department of Defense and NAVFACENGCOM to reach final resolution through the courts. Next the paper will examine the experience NAVFACENGCOM and the Army Corps of Engineers have had with ADR. In addition it will examine some of the reasons the Army Corps of Engineers has learned as to why the private construction industry has been reticent to join in the ADR process. Finally it will make recommendations as to how the NAVY can improve its ADR program and encourage its construction contractors to join the process.","abstract_has_math":false,"creators":["Rakel, Jerome Paul"],"institution":"Georgia Institute of Technology","degree_name":"Master of Science in Civil Engineering","degree_level":"Masters","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1990,"date_issued":"1990","date_published":"1990","updated_at":"2026-11-19T06:31:09Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocm84213335"],"render_values":[{"text":"ocm84213335","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/27941","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/27941","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F27941","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F27941","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Rakel, Jerome Paul"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-02-15T23:29:42Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-02-15T23:29:42Z"]},{"key":"dc:date.issued","label":"Date","values":["1990"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Civil Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Georgia Institute of Technology"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocm84213335"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/27941"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This paper will examine the reasons the private construction industry has begun to use ADR to solve its litigation problems. It will then look at the formal claims process a contractor's claim must follow within the Department of Defense and NAVFACENGCOM to reach final resolution through the courts. Next the paper will examine the experience NAVFACENGCOM and the Army Corps of Engineers have had with ADR. In addition it will examine some of the reasons the Army Corps of Engineers has learned as to why the private construction industry has been reticent to join in the ADR process. Finally it will make recommendations as to how the NAVY can improve its ADR program and encourage its construction contractors to join the process."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/alternativedispu1094527941"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["75 leaves plus unnumbered appendices."]},{"key":"dc:title","label":"Title","values":["Alternative dispute resolution for U.S. Navy construction contracts"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:creator":["Rakel, Jerome Paul"],"dc:date.accessioned":["2013-02-15T23:29:42Z"],"dc:date.available":["2013-02-15T23:29:42Z"],"dc:date.issued":["1990"],"dc:description.abstract":["This paper will examine the reasons the private construction industry has begun to use ADR to solve its litigation problems. It will then look at the formal claims process a contractor's claim must follow within the Department of Defense and NAVFACENGCOM to reach final resolution through the courts. Next the paper will examine the experience NAVFACENGCOM and the Army Corps of Engineers have had with ADR. In addition it will examine some of the reasons the Army Corps of Engineers has learned as to why the private construction industry has been reticent to join in the ADR process. Finally it will make recommendations as to how the NAVY can improve its ADR program and encourage its construction contractors to join the process."],"dc:description.uri":["http://archive.org/details/alternativedispu1094527941"],"dc:format.extent":["75 leaves plus unnumbered appendices."],"dc:identifier.oclc":["ocm84213335"],"dc:identifier.uri":["https://hdl.handle.net/10945/27941"],"dc:publisher":["Georgia Institute of Technology"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Alternative dispute resolution for U.S. Navy construction contracts"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Civil Engineering"],"thesis:institution_name":["Georgia Institute of Technology"]},"updated_at":"2026-11-19T06:31:09Z"}