{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/28041"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/28041","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Comparative cost analysis of P-3 active and reserve aviation forces: the economics of proposed force mix alternatives","abstract":"This thesis describes a methodology for estimating the annual operating and support costs of similarly equipped active and reserve VP squadrons. The costs analyzed include expenditures for personnel, equipment and support associated with maintaining a VP capability. A costing methodology developed by the RAND corporation provided the basis for developing the cost comparisons. The annual cost of the reserve VP squadron ($14.6 million) was found to be 44.5% of the cost of the active squadron. An annual savings of over $18.2 million results when a reserve squadron replaces an active squadron. The primary recurring cost factors that drive the annual costs of active and reserve VP squadrons and contribute to cost differentials are identified and discussed. Realization of cost savings are valid only for marginal changes in the total VP force. The total cost implications of large VP force mix changes, as currently proposed by DoD and the DoN, are addressed","abstract_html":"This thesis describes a methodology for estimating the annual operating and support costs of similarly equipped active and reserve VP squadrons. The costs analyzed include expenditures for personnel, equipment and support associated with maintaining a VP capability. A costing methodology developed by the RAND corporation provided the basis for developing the cost comparisons. The annual cost of the reserve VP squadron ($14.6 million) was found to be 44.5% of the cost of the active squadron. An annual savings of over $18.2 million results when a reserve squadron replaces an active squadron. The primary recurring cost factors that drive the annual costs of active and reserve VP squadrons and contribute to cost differentials are identified and discussed. Realization of cost savings are valid only for marginal changes in the total VP force. The total cost implications of large VP force mix changes, as currently proposed by DoD and the DoN, are addressed","abstract_has_math":true,"creators":["Wrinkle, Michael Richard","Carson, Carl Eugene"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Management","school":"Naval Postgraduate School","contributors":[],"advisors":["McCaffery, Jerry"],"committee_chairs":[],"committee_members":["Carrick, Paul"],"year":1991,"date_issued":"1991-06","date_published":"1991-06","updated_at":"2026-11-21T23:44:54Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/28041","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/28041","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F28041","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F28041","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["McCaffery, Jerry"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Carrick, Paul"]},{"key":"dc:contributor.department","label":"Department","values":["Management"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:contributor.school","label":"School","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Wrinkle, Michael Richard","Carson, Carl Eugene"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-02-15T23:30:31Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-02-15T23:30:31Z"]},{"key":"dc:date.issued","label":"Date","values":["1991-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Active P-3 squadron||Reserve P-3 squadron||comparative costs"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/28041"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis describes a methodology for estimating the annual operating and support costs of similarly equipped active and reserve VP squadrons. The costs analyzed include expenditures for personnel, equipment and support associated with maintaining a VP capability. A costing methodology developed by the RAND corporation provided the basis for developing the cost comparisons. The annual cost of the reserve VP squadron ($14.6 million) was found to be 44.5% of the cost of the active squadron. An annual savings of over $18.2 million results when a reserve squadron replaces an active squadron. The primary recurring cost factors that drive the annual costs of active and reserve VP squadrons and contribute to cost differentials are identified and discussed. Realization of cost savings are valid only for marginal changes in the total VP force. The total cost implications of large VP force mix changes, as currently proposed by DoD and the DoN, are addressed"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/comparativecostn1094528041"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["94 p.;28 cm."]},{"key":"dc:title","label":"Title","values":["Comparative cost analysis of P-3 active and reserve aviation forces: the economics of proposed force mix alternatives"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Commander, United States Naval Reserve","Lieutenant Commander, United States Naval Reserve"]}]}],"canonical_facts":{"dc:contributor.advisor":["McCaffery, Jerry"],"dc:contributor.committeemember":["Carrick, Paul"],"dc:contributor.department":["Management"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:contributor.school":["Naval Postgraduate School"],"dc:creator":["Wrinkle, Michael Richard","Carson, Carl Eugene"],"dc:date.accessioned":["2013-02-15T23:30:31Z"],"dc:date.available":["2013-02-15T23:30:31Z"],"dc:date.issued":["1991-06"],"dc:description.abstract":["This thesis describes a methodology for estimating the annual operating and support costs of similarly equipped active and reserve VP squadrons. The costs analyzed include expenditures for personnel, equipment and support associated with maintaining a VP capability. A costing methodology developed by the RAND corporation provided the basis for developing the cost comparisons. The annual cost of the reserve VP squadron ($14.6 million) was found to be 44.5% of the cost of the active squadron. An annual savings of over $18.2 million results when a reserve squadron replaces an active squadron. The primary recurring cost factors that drive the annual costs of active and reserve VP squadrons and contribute to cost differentials are identified and discussed. Realization of cost savings are valid only for marginal changes in the total VP force. The total cost implications of large VP force mix changes, as currently proposed by DoD and the DoN, are addressed"],"dc:description.uri":["http://archive.org/details/comparativecostn1094528041"],"dc:format.extent":["94 p.;28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/28041"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Active P-3 squadron||Reserve P-3 squadron||comparative costs"],"dc:title":["Comparative cost analysis of P-3 active and reserve aviation forces: the economics of proposed force mix alternatives"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Commander, United States Naval Reserve","Lieutenant Commander, United States Naval Reserve"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:44:54Z"}