{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/28483"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/28483","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A quantitative analysis of factors affecting weapon system cost growth","abstract":"This thesis quantitatively analyzes the factors that affect weapon system cost growth after Milestone 2. The data from nine weapon systems was reconstructed by the Army and Navy from Selected Acquisition Reports (SARs) with the cost variances reclassified into a new categorization system to more readily determine the causes of cost growth. Each cost variance was classified as to whether it was attributable to a mistake in the cost estimating process or a post-Milestone 2 decision, with further classification into subcategories for a more detailed analysis. The cost variances were divided by the Milestone 2 Decision Estimate (DE) to form a cost growth ratio (CGR). The findings reveal that the Department of Defense has about 10.8% cost growth in the procurement process. Cost growth due to decisions outweigh mistakes by a factor of 2.3:1. A majority of the mistake cost growth is due to errors in the estimation of production costs. A majority of the decision cost growth is due to schedule slippage. Low cost systems have 2.4 times as much mistake cost growth as high cost systems. Newer missile systems have significantly less mistake cost growth when compared to other systems. Lastly, the Army and Navy have approximately equal cost growth on their newer systems. Cost","abstract_html":"This thesis quantitatively analyzes the factors that affect weapon system cost growth after Milestone 2. The data from nine weapon systems was reconstructed by the Army and Navy from Selected Acquisition Reports (SARs) with the cost variances reclassified into a new categorization system to more readily determine the causes of cost growth. Each cost variance was classified as to whether it was attributable to a mistake in the cost estimating process or a post-Milestone 2 decision, with further classification into subcategories for a more detailed analysis. The cost variances were divided by the Milestone 2 Decision Estimate (DE) to form a cost growth ratio (CGR). The findings reveal that the Department of Defense has about 10.8% cost growth in the procurement process. Cost growth due to decisions outweigh mistakes by a factor of 2.3:1. A majority of the mistake cost growth is due to errors in the estimation of production costs. A majority of the decision cost growth is due to schedule slippage. Low cost systems have 2.4 times as much mistake cost growth as high cost systems. Newer missile systems have significantly less mistake cost growth when compared to other systems. Lastly, the Army and Navy have approximately equal cost growth on their newer systems. Cost","abstract_has_math":false,"creators":["Pannell, Bobby J."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research","school":"Naval Postgraduate School","contributors":[],"advisors":["Boger, Dan C."],"committee_chairs":[],"committee_members":["Larson, Harold J."],"year":1994,"date_issued":"1994-03","date_published":"1994-03","updated_at":"2026-11-21T22:38:23Z","subjects":["Operations Research"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/28483","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/28483","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F28483","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F28483","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Boger, Dan C."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Larson, Harold J."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School"]},{"key":"dc:contributor.school","label":"School","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Pannell, Bobby J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-02-15T23:33:32Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-02-15T23:33:32Z"]},{"key":"dc:date.issued","label":"Date","values":["1994-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Operations Research"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/28483"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis quantitatively analyzes the factors that affect weapon system cost growth after Milestone 2. The data from nine weapon systems was reconstructed by the Army and Navy from Selected Acquisition Reports (SARs) with the cost variances reclassified into a new categorization system to more readily determine the causes of cost growth. Each cost variance was classified as to whether it was attributable to a mistake in the cost estimating process or a post-Milestone 2 decision, with further classification into subcategories for a more detailed analysis. The cost variances were divided by the Milestone 2 Decision Estimate (DE) to form a cost growth ratio (CGR). The findings reveal that the Department of Defense has about 10.8% cost growth in the procurement process. Cost growth due to decisions outweigh mistakes by a factor of 2.3:1. A majority of the mistake cost growth is due to errors in the estimation of production costs. A majority of the decision cost growth is due to schedule slippage. Low cost systems have 2.4 times as much mistake cost growth as high cost systems. Newer missile systems have significantly less mistake cost growth when compared to other systems. Lastly, the Army and Navy have approximately equal cost growth on their newer systems. Cost"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/aquantitativenal1094528483"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["47 p.;28 cm."]},{"key":"dc:title","label":"Title","values":["A quantitative analysis of factors affecting weapon system cost growth"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Boger, Dan C."],"dc:contributor.committeemember":["Larson, Harold J."],"dc:contributor.department":["Operations Research"],"dc:contributor.other":["Naval Postgraduate School"],"dc:contributor.school":["Naval Postgraduate School"],"dc:creator":["Pannell, Bobby J."],"dc:date.accessioned":["2013-02-15T23:33:32Z"],"dc:date.available":["2013-02-15T23:33:32Z"],"dc:date.issued":["1994-03"],"dc:description.abstract":["This thesis quantitatively analyzes the factors that affect weapon system cost growth after Milestone 2. The data from nine weapon systems was reconstructed by the Army and Navy from Selected Acquisition Reports (SARs) with the cost variances reclassified into a new categorization system to more readily determine the causes of cost growth. Each cost variance was classified as to whether it was attributable to a mistake in the cost estimating process or a post-Milestone 2 decision, with further classification into subcategories for a more detailed analysis. The cost variances were divided by the Milestone 2 Decision Estimate (DE) to form a cost growth ratio (CGR). The findings reveal that the Department of Defense has about 10.8% cost growth in the procurement process. Cost growth due to decisions outweigh mistakes by a factor of 2.3:1. A majority of the mistake cost growth is due to errors in the estimation of production costs. A majority of the decision cost growth is due to schedule slippage. Low cost systems have 2.4 times as much mistake cost growth as high cost systems. Newer missile systems have significantly less mistake cost growth when compared to other systems. Lastly, the Army and Navy have approximately equal cost growth on their newer systems. Cost"],"dc:description.uri":["http://archive.org/details/aquantitativenal1094528483"],"dc:format.extent":["47 p.;28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/28483"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.lcsh":["Operations Research"],"dc:title":["A quantitative analysis of factors affecting weapon system cost growth"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:38:23Z"}