{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/30538"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/30538","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Application of a genetic algorithm to optimize staffing levels in software development","abstract":"Human resource management is gaining recognition as being one of the core attributes of effective software project management. With the great dependency the Department of Defense (DoD) has on systems software, the development of an optimal staffing policy that minimizes overall software project costs will be very valuable. This research aims at developing such a system using a dynamic simulation model that incorporates data collected during an actual software development project. A genetic algorithm is used to arrive at a solution to this nonlinear optimization problem. The simulation model accepts varying staffing schemes supplied from the genetic algorithm allowing for the examination of the effects of the staffing schemes on total project cost. The results indicate that the system was able to obtain a solution reducing overall project costs, but at the cost of additional workdays.","abstract_html":"Human resource management is gaining recognition as being one of the core attributes of effective software project management. With the great dependency the Department of Defense (DoD) has on systems software, the development of an optimal staffing policy that minimizes overall software project costs will be very valuable. This research aims at developing such a system using a dynamic simulation model that incorporates data collected during an actual software development project. A genetic algorithm is used to arrive at a solution to this nonlinear optimization problem. The simulation model accepts varying staffing schemes supplied from the genetic algorithm allowing for the examination of the effects of the staffing schemes on total project cost. The results indicate that the system was able to obtain a solution reducing overall project costs, but at the cost of additional workdays.","abstract_has_math":false,"creators":["Johnson, Donald C."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Information Technology Management","degree_level":"Masters","degree_discipline":"Information Technology Management","degree_department":"Information Technology Management","school":null,"contributors":[],"advisors":["Ramesh, B.","Hamid, T."],"committee_chairs":[],"committee_members":[],"year":1995,"date_issued":"1995-09","date_published":"1995-09","updated_at":"2026-11-26T00:15:18Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/30538","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/30538","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F30538","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F30538","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Ramesh, B.","Hamid, T."]},{"key":"dc:contributor.department","label":"Department","values":["Information Technology Management"]},{"key":"dc:creator","label":"Author","values":["Johnson, Donald C."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December, 1994"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-04-11T21:53:24Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-04-11T21:53:24Z"]},{"key":"dc:date.issued","label":"Date","values":["1995-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Information Technology Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Information Technology Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["NA"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/30538"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Human resource management is gaining recognition as being one of the core attributes of effective software project management. With the great dependency the Department of Defense (DoD) has on systems software, the development of an optimal staffing policy that minimizes overall software project costs will be very valuable. This research aims at developing such a system using a dynamic simulation model that incorporates data collected during an actual software development project. A genetic algorithm is used to arrive at a solution to this nonlinear optimization problem. The simulation model accepts varying staffing schemes supplied from the genetic algorithm allowing for the examination of the effects of the staffing schemes on total project cost. The results indicate that the system was able to obtain a solution reducing overall project costs, but at the cost of additional workdays."]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/applicationofgen1094530538"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["66 p.;28 cm."]},{"key":"dc:title","label":"Title","values":["Application of a genetic algorithm to optimize staffing levels in software development"]},{"key":"dc:title.alternative","label":"Alternative Title","values":["NA"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Navy (U.S.N.) author."]}]}],"canonical_facts":{"dc:contributor.advisor":["Ramesh, B.","Hamid, T."],"dc:contributor.department":["Information Technology Management"],"dc:creator":["Johnson, Donald C."],"dc:date":["December, 1994"],"dc:date.accessioned":["2013-04-11T21:53:24Z"],"dc:date.available":["2013-04-11T21:53:24Z"],"dc:date.issued":["1995-09"],"dc:description.abstract":["Human resource management is gaining recognition as being one of the core attributes of effective software project management. With the great dependency the Department of Defense (DoD) has on systems software, the development of an optimal staffing policy that minimizes overall software project costs will be very valuable. This research aims at developing such a system using a dynamic simulation model that incorporates data collected during an actual software development project. A genetic algorithm is used to arrive at a solution to this nonlinear optimization problem. The simulation model accepts varying staffing schemes supplied from the genetic algorithm allowing for the examination of the effects of the staffing schemes on total project cost. The results indicate that the system was able to obtain a solution reducing overall project costs, but at the cost of additional workdays."],"dc:description.award":["NA"],"dc:description.sponsorship":["NA"],"dc:description.uri":["http://archive.org/details/applicationofgen1094530538"],"dc:format.extent":["66 p.;28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/30538"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:subject.keyword":["NA"],"dc:title":["Application of a genetic algorithm to optimize staffing levels in software development"],"dc:title.alternative":["NA"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Navy (U.S.N.) author."],"thesis:degree_discipline":["Information Technology Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Information Technology Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:15:18Z"}