{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/30727"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/30727","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Sequential estimation of age replacement policies","abstract":"Optimal maintenance policies are designed to reduce the number of system failures and minimize the cost of repair by scheduling planned replacements. In this area the problem of updating the maintenance policy using the past maintenance history has not been adequately solved. In this thesis we study a sequential estimation procedure in a nonparametric setting to estimate the age replacement policy that minimizes long run expected maintenance costs. This thesis begins with the discussion of the concepts of preventive maintenance, age replacement policies, the settings of our simulation model, and a detailed description of the sequential estimation procedure. We include examples using actual replacement data which demonstrate the usefulness of the sequential procedure. Monte-Carlo methods are used to study the behavior of estimated optimal age replacement policy for different sample sizes, costs and underlying system life distributions. We also make comparison with Frees and Ruppert's (1985) sequential procedure is competitive and for large sample sizes performs better than the Frees and Ruppert's procedure. Finally, we sill introduce a graphical method to estimate the optimal age replacement policy.","abstract_html":"Optimal maintenance policies are designed to reduce the number of system failures and minimize the cost of repair by scheduling planned replacements. In this area the problem of updating the maintenance policy using the past maintenance history has not been adequately solved. In this thesis we study a sequential estimation procedure in a nonparametric setting to estimate the age replacement policy that minimizes long run expected maintenance costs. This thesis begins with the discussion of the concepts of preventive maintenance, age replacement policies, the settings of our simulation model, and a detailed description of the sequential estimation procedure. We include examples using actual replacement data which demonstrate the usefulness of the sequential procedure. Monte-Carlo methods are used to study the behavior of estimated optimal age replacement policy for different sample sizes, costs and underlying system life distributions. We also make comparison with Frees and Ruppert&#x27;s (1985) sequential procedure is competitive and for large sample sizes performs better than the Frees and Ruppert&#x27;s procedure. Finally, we sill introduce a graphical method to estimate the optimal age replacement policy.","abstract_has_math":false,"creators":["Wu, Yang-Huang"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Department of Operations Research","school":null,"contributors":[],"advisors":["Whitaker, Lyn R."],"committee_chairs":[],"committee_members":["Esary, James D."],"year":1990,"date_issued":"1990-03","date_published":"1990-03","updated_at":"2026-11-21T23:34:25Z","subjects":[],"languages":[],"rights":["Copyright reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/30727","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/30727","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F30727","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F30727","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Whitaker, Lyn R."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Esary, James D."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Operations Research"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Wu, Yang-Huang"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["March 1990"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-04-11T22:15:12Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-04-11T22:15:12Z"]},{"key":"dc:date.issued","label":"Date","values":["1990-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Sequential Estimation Procedure","Age Replacement Policy","Optimal Replacement","Preventive Maintenance"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright reserved by the copyright owner.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/30727"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Optimal maintenance policies are designed to reduce the number of system failures and minimize the cost of repair by scheduling planned replacements. In this area the problem of updating the maintenance policy using the past maintenance history has not been adequately solved. In this thesis we study a sequential estimation procedure in a nonparametric setting to estimate the age replacement policy that minimizes long run expected maintenance costs. This thesis begins with the discussion of the concepts of preventive maintenance, age replacement policies, the settings of our simulation model, and a detailed description of the sequential estimation procedure. We include examples using actual replacement data which demonstrate the usefulness of the sequential procedure. Monte-Carlo methods are used to study the behavior of estimated optimal age replacement policy for different sample sizes, costs and underlying system life distributions. We also make comparison with Frees and Ruppert's (1985) sequential procedure is competitive and for large sample sizes performs better than the Frees and Ruppert's procedure. Finally, we sill introduce a graphical method to estimate the optimal age replacement policy."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/sequentialestima1094530727"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["vii, 56 p."]},{"key":"dc:title","label":"Title","values":["Sequential estimation of age replacement policies"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Major, Republic of China Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Whitaker, Lyn R."],"dc:contributor.committeemember":["Esary, James D."],"dc:contributor.department":["Department of Operations Research"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Wu, Yang-Huang"],"dc:date":["March 1990"],"dc:date.accessioned":["2013-04-11T22:15:12Z"],"dc:date.available":["2013-04-11T22:15:12Z"],"dc:date.issued":["1990-03"],"dc:description.abstract":["Optimal maintenance policies are designed to reduce the number of system failures and minimize the cost of repair by scheduling planned replacements. In this area the problem of updating the maintenance policy using the past maintenance history has not been adequately solved. In this thesis we study a sequential estimation procedure in a nonparametric setting to estimate the age replacement policy that minimizes long run expected maintenance costs. This thesis begins with the discussion of the concepts of preventive maintenance, age replacement policies, the settings of our simulation model, and a detailed description of the sequential estimation procedure. We include examples using actual replacement data which demonstrate the usefulness of the sequential procedure. Monte-Carlo methods are used to study the behavior of estimated optimal age replacement policy for different sample sizes, costs and underlying system life distributions. We also make comparison with Frees and Ruppert's (1985) sequential procedure is competitive and for large sample sizes performs better than the Frees and Ruppert's procedure. Finally, we sill introduce a graphical method to estimate the optimal age replacement policy."],"dc:description.uri":["http://archive.org/details/sequentialestima1094530727"],"dc:format.extent":["vii, 56 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/30727"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Copyright reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Sequential Estimation Procedure","Age Replacement Policy","Optimal Replacement","Preventive Maintenance"],"dc:title":["Sequential estimation of age replacement policies"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Major, Republic of China Army"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:34:25Z"}