{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/30935"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/30935","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An optimization model for scheduling Army base realignment and closure actions","abstract":"The United States Army is reducing and reshaping its force structure to adapt to the nation's changing defense needs and budget constraints. Along with significant personnel reductions, the Army is divesting itself of excess infrastructure through a process of Base Realignment and Closure (BRAC). A necessary step in the BRAC process is calculation of the Net Present Value (NPV) of savings associated with base realignments and closures which must be computed using the Cost of Base Realignment Actions (COBRA) model. COBRA is not an optimization model. The user must enter when specific BRAC actions will occur. This thesis develops a mixed integer linear programming model to assist The Army Basing Study (TABS), the primary analysis agency for Army BRAC issues, schedule slated BRAC actions. The model generates an optimal schedule which attains maximum potential savings within budgetary constraints. In the past, Army analysts have accomplished this scheduling within COBRA using a time consuming process with no guarantee of optimality. Using a systematic time efficient approach, the model achieved a 34% increase in savings ($223 million) over the manual schedule developed by TABS for an actual BRAC 93 scenario.","abstract_html":"The United States Army is reducing and reshaping its force structure to adapt to the nation&#x27;s changing defense needs and budget constraints. Along with significant personnel reductions, the Army is divesting itself of excess infrastructure through a process of Base Realignment and Closure (BRAC). A necessary step in the BRAC process is calculation of the Net Present Value (NPV) of savings associated with base realignments and closures which must be computed using the Cost of Base Realignment Actions (COBRA) model. COBRA is not an optimization model. The user must enter when specific BRAC actions will occur. This thesis develops a mixed integer linear programming model to assist The Army Basing Study (TABS), the primary analysis agency for Army BRAC issues, schedule slated BRAC actions. The model generates an optimal schedule which attains maximum potential savings within budgetary constraints. In the past, Army analysts have accomplished this scheduling within COBRA using a time consuming process with no guarantee of optimality. Using a systematic time efficient approach, the model achieved a 34% increase in savings ($223 million) over the manual schedule developed by TABS for an actual BRAC 93 scenario.","abstract_has_math":false,"creators":["Free, Edward J."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research","school":null,"contributors":[],"advisors":["Dell, Robert F."],"committee_chairs":[],"committee_members":["NA"],"year":1994,"date_issued":"1994-09","date_published":"1994-09","updated_at":"2026-11-21T22:42:37Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/30935","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/30935","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F30935","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F30935","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Dell, Robert F."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["NA"]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["NA"]},{"key":"dc:creator","label":"Author","values":["Free, Edward J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["September, 1994"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-04-26T19:00:07Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-04-26T19:00:07Z"]},{"key":"dc:date.issued","label":"Date","values":["1994-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["NA"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/30935"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The United States Army is reducing and reshaping its force structure to adapt to the nation's changing defense needs and budget constraints. Along with significant personnel reductions, the Army is divesting itself of excess infrastructure through a process of Base Realignment and Closure (BRAC). A necessary step in the BRAC process is calculation of the Net Present Value (NPV) of savings associated with base realignments and closures which must be computed using the Cost of Base Realignment Actions (COBRA) model. COBRA is not an optimization model. The user must enter when specific BRAC actions will occur. This thesis develops a mixed integer linear programming model to assist The Army Basing Study (TABS), the primary analysis agency for Army BRAC issues, schedule slated BRAC actions. The model generates an optimal schedule which attains maximum potential savings within budgetary constraints. In the past, Army analysts have accomplished this scheduling within COBRA using a time consuming process with no guarantee of optimality. Using a systematic time efficient approach, the model achieved a 34% increase in savings ($223 million) over the manual schedule developed by TABS for an actual BRAC 93 scenario."]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/anoptimizationmo1094530935"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["41 p.;28 cm."]},{"key":"dc:title","label":"Title","values":["An optimization model for scheduling Army base realignment and closure actions"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Army (USA) author"]}]}],"canonical_facts":{"dc:contributor.advisor":["Dell, Robert F."],"dc:contributor.committeemember":["NA"],"dc:contributor.department":["Operations Research"],"dc:contributor.other":["NA"],"dc:creator":["Free, Edward J."],"dc:date":["September, 1994"],"dc:date.accessioned":["2013-04-26T19:00:07Z"],"dc:date.available":["2013-04-26T19:00:07Z"],"dc:date.issued":["1994-09"],"dc:description.abstract":["The United States Army is reducing and reshaping its force structure to adapt to the nation's changing defense needs and budget constraints. Along with significant personnel reductions, the Army is divesting itself of excess infrastructure through a process of Base Realignment and Closure (BRAC). A necessary step in the BRAC process is calculation of the Net Present Value (NPV) of savings associated with base realignments and closures which must be computed using the Cost of Base Realignment Actions (COBRA) model. COBRA is not an optimization model. The user must enter when specific BRAC actions will occur. This thesis develops a mixed integer linear programming model to assist The Army Basing Study (TABS), the primary analysis agency for Army BRAC issues, schedule slated BRAC actions. The model generates an optimal schedule which attains maximum potential savings within budgetary constraints. In the past, Army analysts have accomplished this scheduling within COBRA using a time consuming process with no guarantee of optimality. Using a systematic time efficient approach, the model achieved a 34% increase in savings ($223 million) over the manual schedule developed by TABS for an actual BRAC 93 scenario."],"dc:description.award":["NA"],"dc:description.sponsorship":["NA"],"dc:description.uri":["http://archive.org/details/anoptimizationmo1094530935"],"dc:format.extent":["41 p.;28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/30935"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:subject.keyword":["NA"],"dc:title":["An optimization model for scheduling Army base realignment and closure actions"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Army (USA) author"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:42:37Z"}