{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/31326"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/31326","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Consolidation of contracting in field contracting activities in DoD","abstract":"This research reviews the current opportunity, due to the changes resulting from the Federal Acquisition Streamlining Act (FASA), for the DoD to consolidate field contracting by region rather than by each Service at the installation level. The intent of this research is to look at past consolidations and the successes attained as a result of the consolidation. In addition, recent consolidations in areas other than contracting were analyzed for the savings yielded DoD. Questionnaires were sent to field contracting offices of all Services to determine the affect of FASA. The results of these surveys showed that there will be a significant change in the number of large contracts procured as a result of FASA, and there will be minimal impact on the simplified purchase threshold. Recommendations include: (1) Contracting offices should be consolidated into area DoD offices in order to maximize the efficiency of contracting at the field contracting level; (2) consolidation should be accomplished in coordination with the fielding of the Standard Procurement System over the next five years by DoD; and (3) simplified purchases should be left at the installation level with direct supervision by the district office.","abstract_html":"This research reviews the current opportunity, due to the changes resulting from the Federal Acquisition Streamlining Act (FASA), for the DoD to consolidate field contracting by region rather than by each Service at the installation level. The intent of this research is to look at past consolidations and the successes attained as a result of the consolidation. In addition, recent consolidations in areas other than contracting were analyzed for the savings yielded DoD. Questionnaires were sent to field contracting offices of all Services to determine the affect of FASA. The results of these surveys showed that there will be a significant change in the number of large contracts procured as a result of FASA, and there will be minimal impact on the simplified purchase threshold. Recommendations include: (1) Contracting offices should be consolidated into area DoD offices in order to maximize the efficiency of contracting at the field contracting level; (2) consolidation should be accomplished in coordination with the fielding of the Standard Procurement System over the next five years by DoD; and (3) simplified purchases should be left at the installation level with direct supervision by the district office.","abstract_has_math":false,"creators":["Hicks, Perry J."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Management","school":null,"contributors":[],"advisors":["Desbrow, Sandra M.","Crawford, Alice"],"committee_chairs":[],"committee_members":[],"year":1995,"date_issued":"1995-12","date_published":"1995-12","updated_at":"2026-11-26T00:21:07Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/31326","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/31326","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F31326","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F31326","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Desbrow, Sandra M.","Crawford, Alice"]},{"key":"dc:contributor.department","label":"Department","values":["Management"]},{"key":"dc:creator","label":"Author","values":["Hicks, Perry J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1995"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-04-29T22:49:42Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-04-29T22:49:42Z"]},{"key":"dc:date.issued","label":"Date","values":["1995-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/31326"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research reviews the current opportunity, due to the changes resulting from the Federal Acquisition Streamlining Act (FASA), for the DoD to consolidate field contracting by region rather than by each Service at the installation level. The intent of this research is to look at past consolidations and the successes attained as a result of the consolidation. In addition, recent consolidations in areas other than contracting were analyzed for the savings yielded DoD. Questionnaires were sent to field contracting offices of all Services to determine the affect of FASA. The results of these surveys showed that there will be a significant change in the number of large contracts procured as a result of FASA, and there will be minimal impact on the simplified purchase threshold. Recommendations include: (1) Contracting offices should be consolidated into area DoD offices in order to maximize the efficiency of contracting at the field contracting level; (2) consolidation should be accomplished in coordination with the fielding of the Standard Procurement System over the next five years by DoD; and (3) simplified purchases should be left at the installation level with direct supervision by the district office."]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/consolidationofc1094531326"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["122 p."]},{"key":"dc:title","label":"Title","values":["Consolidation of contracting in field contracting activities in DoD"]},{"key":"dc:title.alternative","label":"Alternative Title","values":["Consolidation of field contracting activities in DoD"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Army (USA) author"]}]}],"canonical_facts":{"dc:contributor.advisor":["Desbrow, Sandra M.","Crawford, Alice"],"dc:contributor.department":["Management"],"dc:creator":["Hicks, Perry J."],"dc:date":["December 1995"],"dc:date.accessioned":["2013-04-29T22:49:42Z"],"dc:date.available":["2013-04-29T22:49:42Z"],"dc:date.issued":["1995-12"],"dc:description.abstract":["This research reviews the current opportunity, due to the changes resulting from the Federal Acquisition Streamlining Act (FASA), for the DoD to consolidate field contracting by region rather than by each Service at the installation level. The intent of this research is to look at past consolidations and the successes attained as a result of the consolidation. In addition, recent consolidations in areas other than contracting were analyzed for the savings yielded DoD. Questionnaires were sent to field contracting offices of all Services to determine the affect of FASA. The results of these surveys showed that there will be a significant change in the number of large contracts procured as a result of FASA, and there will be minimal impact on the simplified purchase threshold. Recommendations include: (1) Contracting offices should be consolidated into area DoD offices in order to maximize the efficiency of contracting at the field contracting level; (2) consolidation should be accomplished in coordination with the fielding of the Standard Procurement System over the next five years by DoD; and (3) simplified purchases should be left at the installation level with direct supervision by the district office."],"dc:description.award":["NA"],"dc:description.sponsorship":["NA"],"dc:description.uri":["http://archive.org/details/consolidationofc1094531326"],"dc:format.extent":["122 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/31326"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Consolidation of contracting in field contracting activities in DoD"],"dc:title.alternative":["Consolidation of field contracting activities in DoD"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Army (USA) author"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:21:07Z"}