{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/31342"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/31342","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Corps SAM: down selection to one contractor vs. competition","abstract":"The purpose of this thesis is to research the history of the Corps SAM program, focusing on the issue of whether to maintain competition or to down select to a single contractor. An analysis is conducted to examine the down selection and whether the program risks of cost overrun, failure to meet schedule, and poor weapon performance can be averted without the use of continuous competition. This thesis concludes that down selection to one contractor provides more benefit to the program than maintaining competition throughout the acquisition process for the Corps SAM program.","abstract_html":"The purpose of this thesis is to research the history of the Corps SAM program, focusing on the issue of whether to maintain competition or to down select to a single contractor. An analysis is conducted to examine the down selection and whether the program risks of cost overrun, failure to meet schedule, and poor weapon performance can be averted without the use of continuous competition. This thesis concludes that down selection to one contractor provides more benefit to the program than maintaining competition throughout the acquisition process for the Corps SAM program.","abstract_has_math":false,"creators":["Marino, Thomas R."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Management","school":null,"contributors":[],"advisors":["Snider, Keith F.","Stone, Mark W."],"committee_chairs":[],"committee_members":[],"year":1995,"date_issued":"1995-12","date_published":"1995-12","updated_at":"2026-11-20T22:16:30Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/31342","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/31342","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F31342","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F31342","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Snider, Keith F.","Stone, Mark W."]},{"key":"dc:contributor.department","label":"Department","values":["Management"]},{"key":"dc:creator","label":"Author","values":["Marino, Thomas R."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1995"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-04-29T22:49:55Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-04-29T22:49:55Z"]},{"key":"dc:date.issued","label":"Date","values":["1995-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/31342"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this thesis is to research the history of the Corps SAM program, focusing on the issue of whether to maintain competition or to down select to a single contractor. An analysis is conducted to examine the down selection and whether the program risks of cost overrun, failure to meet schedule, and poor weapon performance can be averted without the use of continuous competition. This thesis concludes that down selection to one contractor provides more benefit to the program than maintaining competition throughout the acquisition process for the Corps SAM program."]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/corpssamdownsele1094531342"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["70 p."]},{"key":"dc:title","label":"Title","values":["Corps SAM: down selection to one contractor vs. competition"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Army (USA) author"]}]}],"canonical_facts":{"dc:contributor.advisor":["Snider, Keith F.","Stone, Mark W."],"dc:contributor.department":["Management"],"dc:creator":["Marino, Thomas R."],"dc:date":["December 1995"],"dc:date.accessioned":["2013-04-29T22:49:55Z"],"dc:date.available":["2013-04-29T22:49:55Z"],"dc:date.issued":["1995-12"],"dc:description.abstract":["The purpose of this thesis is to research the history of the Corps SAM program, focusing on the issue of whether to maintain competition or to down select to a single contractor. An analysis is conducted to examine the down selection and whether the program risks of cost overrun, failure to meet schedule, and poor weapon performance can be averted without the use of continuous competition. This thesis concludes that down selection to one contractor provides more benefit to the program than maintaining competition throughout the acquisition process for the Corps SAM program."],"dc:description.award":["NA"],"dc:description.sponsorship":["NA"],"dc:description.uri":["http://archive.org/details/corpssamdownsele1094531342"],"dc:format.extent":["70 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/31342"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Corps SAM: down selection to one contractor vs. competition"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Army (USA) author"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:16:30Z"}