{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/31402"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/31402","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of inadequate subcontract evaluation and subcontractor defective pricing within the Department of Defense","abstract":"This study was conducted to examine problems identified by GAO during the 1985-1992 time frame in the area of subcontract management within DoD, specifically, inadequate subcontract evaluation and subcontractor defective pricing. Questionnaires were sent to DCAA auditors nationwide and DoD prime contractors and subcontractors in California. The study concludes that the problems of subcontract estimating system deficiencies and subcontractor defective pricing continue to be major discrepancies within DoD.","abstract_html":"This study was conducted to examine problems identified by GAO during the 1985-1992 time frame in the area of subcontract management within DoD, specifically, inadequate subcontract evaluation and subcontractor defective pricing. Questionnaires were sent to DCAA auditors nationwide and DoD prime contractors and subcontractors in California. The study concludes that the problems of subcontract estimating system deficiencies and subcontractor defective pricing continue to be major discrepancies within DoD.","abstract_has_math":false,"creators":["Beaubien, Roger Taylor"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Management","school":null,"contributors":[],"advisors":["Desbrow, Sandra M.","Eaton, Donald R."],"committee_chairs":[],"committee_members":[],"year":1995,"date_issued":"1995-06","date_published":"1995-06","updated_at":"2026-11-21T22:38:38Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/31402","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/31402","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F31402","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Desbrow, Sandra M.","Eaton, Donald R."]},{"key":"dc:contributor.department","label":"Department","values":["Management"]},{"key":"dc:creator","label":"Author","values":["Beaubien, Roger Taylor"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1995"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-04-29T22:50:25Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-04-29T22:50:25Z"]},{"key":"dc:date.issued","label":"Date","values":["1995-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/31402"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This study was conducted to examine problems identified by GAO during the 1985-1992 time frame in the area of subcontract management within DoD, specifically, inadequate subcontract evaluation and subcontractor defective pricing. Questionnaires were sent to DCAA auditors nationwide and DoD prime contractors and subcontractors in California. The study concludes that the problems of subcontract estimating system deficiencies and subcontractor defective pricing continue to be major discrepancies within DoD."]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofinade1094531402"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["146 p."]},{"key":"dc:title","label":"Title","values":["An analysis of inadequate subcontract evaluation and subcontractor defective pricing within the Department of Defense"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Navy (U.S.N.) author."]}]}],"canonical_facts":{"dc:contributor.advisor":["Desbrow, Sandra M.","Eaton, Donald R."],"dc:contributor.department":["Management"],"dc:creator":["Beaubien, Roger Taylor"],"dc:date":["June 1995"],"dc:date.accessioned":["2013-04-29T22:50:25Z"],"dc:date.available":["2013-04-29T22:50:25Z"],"dc:date.issued":["1995-06"],"dc:description.abstract":["This study was conducted to examine problems identified by GAO during the 1985-1992 time frame in the area of subcontract management within DoD, specifically, inadequate subcontract evaluation and subcontractor defective pricing. Questionnaires were sent to DCAA auditors nationwide and DoD prime contractors and subcontractors in California. The study concludes that the problems of subcontract estimating system deficiencies and subcontractor defective pricing continue to be major discrepancies within DoD."],"dc:description.award":["NA"],"dc:description.sponsorship":["NA"],"dc:description.uri":["http://archive.org/details/annalysisofinade1094531402"],"dc:format.extent":["146 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/31402"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["An analysis of inadequate subcontract evaluation and subcontractor defective pricing within the Department of Defense"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Navy (U.S.N.) author."],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:38:38Z"}