{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/3173"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/3173","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"U.S. Army tactical wheeled vehicles modernization strategy an optimization model","abstract":"This thesis addresses the issue of optimal budget allocation in the modernization of the U.S. Army's Light Tactical Wheeled Vehicles (LTWV). To achieve the objective for this research, a decision optimization tool was requested by the U.S. Tank-Automotive and Armaments Life Cycle Management Command (TACOM LCMC) and Program Executive Office, Combat Support / Combat Service Support (PEO CS/CSS) to provide an analytical tool to serve as the underpinning for modernization strategies for the LTWV over the next fifteen fiscal years. The optimization tool was implemented in Excel, using Excel Premium Solver Platform as the solver engine. An initial analysis was done to demonstrate the validity of the model, using notional data and the weighted values from the Value Model. Sensitivity analyses were also performed on the model by varying the inputs, such as the budgetary and average age requirements, to look at the capabilities that can be provided during the modernization period.","abstract_html":"This thesis addresses the issue of optimal budget allocation in the modernization of the U.S. Army&#x27;s Light Tactical Wheeled Vehicles (LTWV). To achieve the objective for this research, a decision optimization tool was requested by the U.S. Tank-Automotive and Armaments Life Cycle Management Command (TACOM LCMC) and Program Executive Office, Combat Support / Combat Service Support (PEO CS/CSS) to provide an analytical tool to serve as the underpinning for modernization strategies for the LTWV over the next fifteen fiscal years. The optimization tool was implemented in Excel, using Excel Premium Solver Platform as the solver engine. An initial analysis was done to demonstrate the validity of the model, using notional data and the weighted values from the Value Model. Sensitivity analyses were also performed on the model by varying the inputs, such as the budgetary and average age requirements, to look at the capabilities that can be provided during the modernization period.","abstract_has_math":false,"creators":["Goh, Choo Seng Roy"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S.","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":null,"school":null,"contributors":[],"advisors":["Nussbaum, Daniel."],"committee_chairs":[],"committee_members":["Holm, David"],"year":2007,"date_issued":"2007-12","date_published":"2007-12","updated_at":"2026-11-19T06:32:39Z","subjects":["Budget","Estimates","Mathematical models","Decision making"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["191049911"],"render_values":[{"text":"191049911","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/3173","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/3173","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F3173","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Nussbaum, Daniel."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Holm, David"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Goh, Choo Seng Roy"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:37:31Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:37:31Z"]},{"key":"dc:date.issued","label":"Date","values":["2007-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Budget","Estimates","Mathematical models","Decision making"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["191049911"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/3173"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis addresses the issue of optimal budget allocation in the modernization of the U.S. Army's Light Tactical Wheeled Vehicles (LTWV). To achieve the objective for this research, a decision optimization tool was requested by the U.S. Tank-Automotive and Armaments Life Cycle Management Command (TACOM LCMC) and Program Executive Office, Combat Support / Combat Service Support (PEO CS/CSS) to provide an analytical tool to serve as the underpinning for modernization strategies for the LTWV over the next fifteen fiscal years. The optimization tool was implemented in Excel, using Excel Premium Solver Platform as the solver engine. An initial analysis was done to demonstrate the validity of the model, using notional data and the weighted values from the Value Model. Sensitivity analyses were also performed on the model by varying the inputs, such as the budgetary and average age requirements, to look at the capabilities that can be provided during the modernization period."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/usarmytacticalwh109453173"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xviii, 79 p. : ill. (some col.) ;"]},{"key":"dc:title","label":"Title","values":["U.S. Army tactical wheeled vehicles modernization strategy an optimization model"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Technology Agency author (civilian)."]},{"key":"local:etd.verified","label":"Local Etd Verified","values":["no"]}]}],"canonical_facts":{"dc:contributor.advisor":["Nussbaum, Daniel."],"dc:contributor.committeemember":["Holm, David"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Goh, Choo Seng Roy"],"dc:date.accessioned":["2012-03-14T17:37:31Z"],"dc:date.available":["2012-03-14T17:37:31Z"],"dc:date.issued":["2007-12"],"dc:description.abstract":["This thesis addresses the issue of optimal budget allocation in the modernization of the U.S. Army's Light Tactical Wheeled Vehicles (LTWV). To achieve the objective for this research, a decision optimization tool was requested by the U.S. Tank-Automotive and Armaments Life Cycle Management Command (TACOM LCMC) and Program Executive Office, Combat Support / Combat Service Support (PEO CS/CSS) to provide an analytical tool to serve as the underpinning for modernization strategies for the LTWV over the next fifteen fiscal years. The optimization tool was implemented in Excel, using Excel Premium Solver Platform as the solver engine. An initial analysis was done to demonstrate the validity of the model, using notional data and the weighted values from the Value Model. Sensitivity analyses were also performed on the model by varying the inputs, such as the budgetary and average age requirements, to look at the capabilities that can be provided during the modernization period."],"dc:description.uri":["http://archive.org/details/usarmytacticalwh109453173"],"dc:format.extent":["xviii, 79 p. : ill. (some col.) ;"],"dc:identifier.oclc":["191049911"],"dc:identifier.uri":["https://hdl.handle.net/10945/3173"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.lcsh":["Budget","Estimates","Mathematical models","Decision making"],"dc:title":["U.S. Army tactical wheeled vehicles modernization strategy an optimization model"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Technology Agency author (civilian)."],"local:etd.verified":["no"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S."],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:32:39Z"}