{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/31922"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/31922","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Improved aviation readiness and inventory reductions through repair cycle time reductions using modeling and simulation","abstract":"This thesis research focuses on improved aviation readiness and reductions in pipeline inventory investment through repair Turn Around Time reductions related to the component repair processes internal to the Naval Aviation Depot (NADEP). Specific emphasis was given to the repair flow of a specific component from induction into the Depot for repair to the ultimate availability for sale to customers in a ready-for-issue status. The research models the current NADEP repair process flow and simulates enhancements to the process flow. These enhancements identify savings of over $52,000 in repair pipeline inventory investment for the candidate item. Our model and associated simulations provide NADEP with graphical and quantitative feedback which demonstrates the impact of process flow enhancements on repair Turn Around Time and Work in Process inventory efficiency.","abstract_html":"This thesis research focuses on improved aviation readiness and reductions in pipeline inventory investment through repair Turn Around Time reductions related to the component repair processes internal to the Naval Aviation Depot (NADEP). Specific emphasis was given to the repair flow of a specific component from induction into the Depot for repair to the ultimate availability for sale to customers in a ready-for-issue status. The research models the current NADEP repair process flow and simulates enhancements to the process flow. These enhancements identify savings of over $52,000 in repair pipeline inventory investment for the candidate item. Our model and associated simulations provide NADEP with graphical and quantitative feedback which demonstrates the impact of process flow enhancements on repair Turn Around Time and Work in Process inventory efficiency.","abstract_has_math":false,"creators":["Mooney, Kevin F.","Sanchez, Guy R."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Systems Management","degree_level":"Masters","degree_discipline":"Systems Management","degree_department":"Systems Management","school":null,"contributors":[],"advisors":["Kang, Keebom","Eaton, Donald R."],"committee_chairs":[],"committee_members":[],"year":1997,"date_issued":"1997-12","date_published":"1997-12","updated_at":"2026-11-26T00:03:15Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/31922","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/31922","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F31922","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F31922","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Kang, Keebom","Eaton, Donald R."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Management"]},{"key":"dc:creator","label":"Author","values":["Mooney, Kevin F.","Sanchez, Guy R."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-04-30T21:55:56Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-04-30T21:55:56Z"]},{"key":"dc:date.issued","label":"Date","values":["1997-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Systems Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["NA"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/31922"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis research focuses on improved aviation readiness and reductions in pipeline inventory investment through repair Turn Around Time reductions related to the component repair processes internal to the Naval Aviation Depot (NADEP). Specific emphasis was given to the repair flow of a specific component from induction into the Depot for repair to the ultimate availability for sale to customers in a ready-for-issue status. The research models the current NADEP repair process flow and simulates enhancements to the process flow. These enhancements identify savings of over $52,000 in repair pipeline inventory investment for the candidate item. Our model and associated simulations provide NADEP with graphical and quantitative feedback which demonstrates the impact of process flow enhancements on repair Turn Around Time and Work in Process inventory efficiency."]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/improvedviationr1094531922"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xii, 117 p.;28 cm."]},{"key":"dc:title","label":"Title","values":["Improved aviation readiness and inventory reductions through repair cycle time reductions using modeling and simulation"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Navy (U.S.N.) authors."]}]}],"canonical_facts":{"dc:contributor.advisor":["Kang, Keebom","Eaton, Donald R."],"dc:contributor.department":["Systems Management"],"dc:creator":["Mooney, Kevin F.","Sanchez, Guy R."],"dc:date.accessioned":["2013-04-30T21:55:56Z"],"dc:date.available":["2013-04-30T21:55:56Z"],"dc:date.issued":["1997-12"],"dc:description.abstract":["This thesis research focuses on improved aviation readiness and reductions in pipeline inventory investment through repair Turn Around Time reductions related to the component repair processes internal to the Naval Aviation Depot (NADEP). Specific emphasis was given to the repair flow of a specific component from induction into the Depot for repair to the ultimate availability for sale to customers in a ready-for-issue status. The research models the current NADEP repair process flow and simulates enhancements to the process flow. These enhancements identify savings of over $52,000 in repair pipeline inventory investment for the candidate item. Our model and associated simulations provide NADEP with graphical and quantitative feedback which demonstrates the impact of process flow enhancements on repair Turn Around Time and Work in Process inventory efficiency."],"dc:description.award":["NA"],"dc:description.sponsorship":["NA"],"dc:description.uri":["http://archive.org/details/improvedviationr1094531922"],"dc:format.extent":["xii, 117 p.;28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/31922"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["NA"],"dc:title":["Improved aviation readiness and inventory reductions through repair cycle time reductions using modeling and simulation"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Navy (U.S.N.) authors."],"thesis:degree_discipline":["Systems Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Systems Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:03:15Z"}