{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/32039"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/32039","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Consistency in Department of Defense environmental contracting","abstract":"This thesis examines and analyzes the unique aspects of environmental remediation and the different contracting methods used by the DoD to outsource its environmental contracting needs. The analysis was conducted using archival and opinion research to define the unique qualities associated with environmental remediation and the individual Services's contracting methods. The research revealed that legislative requirements are numerous and a majority of the environmental remediation requirements are unclear in nature. The Navy's choice of the Comprehensive Long-Term Environmental Action Navy (CLEAN) and the Remedial Action Contract (RAC) and the Army's choice of the Total Environmental Remediation Contract (TERC) are compared and evaluated. This evaluation looks at the advantages and disadvantages in their application. The researcher's analysis of the data determined that the Army's TERC contract is the more efficient environmental contracting method. With the ultimate objective of providing an environmental contracting method that would enhance an integrated single face to industry it is recommended that the Army's TERC contracting method be adopted for use throughout the DoD.","abstract_html":"This thesis examines and analyzes the unique aspects of environmental remediation and the different contracting methods used by the DoD to outsource its environmental contracting needs. The analysis was conducted using archival and opinion research to define the unique qualities associated with environmental remediation and the individual Services&#x27;s contracting methods. The research revealed that legislative requirements are numerous and a majority of the environmental remediation requirements are unclear in nature. The Navy&#x27;s choice of the Comprehensive Long-Term Environmental Action Navy (CLEAN) and the Remedial Action Contract (RAC) and the Army&#x27;s choice of the Total Environmental Remediation Contract (TERC) are compared and evaluated. This evaluation looks at the advantages and disadvantages in their application. The researcher&#x27;s analysis of the data determined that the Army&#x27;s TERC contract is the more efficient environmental contracting method. With the ultimate objective of providing an environmental contracting method that would enhance an integrated single face to industry it is recommended that the Army&#x27;s TERC contracting method be adopted for use throughout the DoD.","abstract_has_math":false,"creators":["Smith, Barry R."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Stone, Mark W.","Lamm, David V."],"committee_chairs":[],"committee_members":[],"year":1996,"date_issued":"1996-12","date_published":"1996-12","updated_at":"2026-11-21T22:23:41Z","subjects":["Environmental policy, United States","Public contracts, United States"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/32039","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/32039","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F32039","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Stone, Mark W.","Lamm, David V."]},{"key":"dc:creator","label":"Author","values":["Smith, Barry R."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December, 1996"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-04-30T22:04:39Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-04-30T22:04:39Z"]},{"key":"dc:date.issued","label":"Date","values":["1996-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Environmental policy, United States","Public contracts, United States"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/32039"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis examines and analyzes the unique aspects of environmental remediation and the different contracting methods used by the DoD to outsource its environmental contracting needs. The analysis was conducted using archival and opinion research to define the unique qualities associated with environmental remediation and the individual Services's contracting methods. The research revealed that legislative requirements are numerous and a majority of the environmental remediation requirements are unclear in nature. The Navy's choice of the Comprehensive Long-Term Environmental Action Navy (CLEAN) and the Remedial Action Contract (RAC) and the Army's choice of the Total Environmental Remediation Contract (TERC) are compared and evaluated. This evaluation looks at the advantages and disadvantages in their application. The researcher's analysis of the data determined that the Army's TERC contract is the more efficient environmental contracting method. With the ultimate objective of providing an environmental contracting method that would enhance an integrated single face to industry it is recommended that the Army's TERC contracting method be adopted for use throughout the DoD."]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/consistencyindep1094532039"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xii, 107 p."]},{"key":"dc:title","label":"Title","values":["Consistency in Department of Defense environmental contracting"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Navy (U.S.N.) author"]}]}],"canonical_facts":{"dc:contributor.advisor":["Stone, Mark W.","Lamm, David V."],"dc:creator":["Smith, Barry R."],"dc:date":["December, 1996"],"dc:date.accessioned":["2013-04-30T22:04:39Z"],"dc:date.available":["2013-04-30T22:04:39Z"],"dc:date.issued":["1996-12"],"dc:description.abstract":["This thesis examines and analyzes the unique aspects of environmental remediation and the different contracting methods used by the DoD to outsource its environmental contracting needs. The analysis was conducted using archival and opinion research to define the unique qualities associated with environmental remediation and the individual Services's contracting methods. The research revealed that legislative requirements are numerous and a majority of the environmental remediation requirements are unclear in nature. The Navy's choice of the Comprehensive Long-Term Environmental Action Navy (CLEAN) and the Remedial Action Contract (RAC) and the Army's choice of the Total Environmental Remediation Contract (TERC) are compared and evaluated. This evaluation looks at the advantages and disadvantages in their application. The researcher's analysis of the data determined that the Army's TERC contract is the more efficient environmental contracting method. With the ultimate objective of providing an environmental contracting method that would enhance an integrated single face to industry it is recommended that the Army's TERC contracting method be adopted for use throughout the DoD."],"dc:description.award":["NA"],"dc:description.uri":["http://archive.org/details/consistencyindep1094532039"],"dc:format.extent":["xii, 107 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/32039"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.lcsh":["Environmental policy, United States","Public contracts, United States"],"dc:title":["Consistency in Department of Defense environmental contracting"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Navy (U.S.N.) author"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:23:41Z"}