{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/32099"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/32099","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Procuring contracting officer's guide to Cost/Schedule Control Systems Criteria (C/SCSC)","abstract":"This research examined the procuring contracting officer's (PCO) role in implementing and administering Cost/Schedule Control Systems Criteria (C/SCSC) within the Department of Defense. The purpose of this study was to develop a practical guide to C/SCSC for the PCO to use as a ready reference while on the job or in a training environment. As such, some germane topics addressed in this thesis include objectives of C/SCSC, C/SCSC related items of DOD solicitations, evaluation of the contractor's C/SCSC plan or program during source selection, C/SCSC validation and compliance reviews, application of cost and schedule performance data, and current initiatives for improvement of C/SCSC. The underlying goals of this thesis was to make the PCO aware of the importance of reliable cost and schedule performance data to the success of a major acquisition program, and the vital role that (s)he plays in assuring that the contractor's integrated management system generates it.","abstract_html":"This research examined the procuring contracting officer&#x27;s (PCO) role in implementing and administering Cost/Schedule Control Systems Criteria (C/SCSC) within the Department of Defense. The purpose of this study was to develop a practical guide to C/SCSC for the PCO to use as a ready reference while on the job or in a training environment. As such, some germane topics addressed in this thesis include objectives of C/SCSC, C/SCSC related items of DOD solicitations, evaluation of the contractor&#x27;s C/SCSC plan or program during source selection, C/SCSC validation and compliance reviews, application of cost and schedule performance data, and current initiatives for improvement of C/SCSC. The underlying goals of this thesis was to make the PCO aware of the importance of reliable cost and schedule performance data to the success of a major acquisition program, and the vital role that (s)he plays in assuring that the contractor&#x27;s integrated management system generates it.","abstract_has_math":false,"creators":["Lee, Tae H."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Shockley, Danny A.","Fremgen, James"],"committee_chairs":[],"committee_members":[],"year":1996,"date_issued":"1996-06","date_published":"1996-06","updated_at":"2026-11-21T23:43:58Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/32099","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/32099","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F32099","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Shockley, Danny A.","Fremgen, James"]},{"key":"dc:creator","label":"Author","values":["Lee, Tae H."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June, 1996"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-04-30T22:05:14Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-04-30T22:05:14Z"]},{"key":"dc:date.issued","label":"Date","values":["1996-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/32099"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research examined the procuring contracting officer's (PCO) role in implementing and administering Cost/Schedule Control Systems Criteria (C/SCSC) within the Department of Defense. The purpose of this study was to develop a practical guide to C/SCSC for the PCO to use as a ready reference while on the job or in a training environment. As such, some germane topics addressed in this thesis include objectives of C/SCSC, C/SCSC related items of DOD solicitations, evaluation of the contractor's C/SCSC plan or program during source selection, C/SCSC validation and compliance reviews, application of cost and schedule performance data, and current initiatives for improvement of C/SCSC. The underlying goals of this thesis was to make the PCO aware of the importance of reliable cost and schedule performance data to the success of a major acquisition program, and the vital role that (s)he plays in assuring that the contractor's integrated management system generates it."]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/procuringcontrac1094532099"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["105 p."]},{"key":"dc:title","label":"Title","values":["Procuring contracting officer's guide to Cost/Schedule Control Systems Criteria (C/SCSC)"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Navy (U.S.N.) author"]}]}],"canonical_facts":{"dc:contributor.advisor":["Shockley, Danny A.","Fremgen, James"],"dc:creator":["Lee, Tae H."],"dc:date":["June, 1996"],"dc:date.accessioned":["2013-04-30T22:05:14Z"],"dc:date.available":["2013-04-30T22:05:14Z"],"dc:date.issued":["1996-06"],"dc:description.abstract":["This research examined the procuring contracting officer's (PCO) role in implementing and administering Cost/Schedule Control Systems Criteria (C/SCSC) within the Department of Defense. The purpose of this study was to develop a practical guide to C/SCSC for the PCO to use as a ready reference while on the job or in a training environment. As such, some germane topics addressed in this thesis include objectives of C/SCSC, C/SCSC related items of DOD solicitations, evaluation of the contractor's C/SCSC plan or program during source selection, C/SCSC validation and compliance reviews, application of cost and schedule performance data, and current initiatives for improvement of C/SCSC. The underlying goals of this thesis was to make the PCO aware of the importance of reliable cost and schedule performance data to the success of a major acquisition program, and the vital role that (s)he plays in assuring that the contractor's integrated management system generates it."],"dc:description.award":["NA"],"dc:description.uri":["http://archive.org/details/procuringcontrac1094532099"],"dc:format.extent":["105 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/32099"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:title":["Procuring contracting officer's guide to Cost/Schedule Control Systems Criteria (C/SCSC)"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Navy (U.S.N.) author"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:43:58Z"}